NABCB Accredited Inspection Bodies
Meenaar Global Consultant LLP
Address 152-153, 1st Floor, D Tower, Vatika Mindscapes, Sector-27D, Faridabad - 121003, Haryana, India
Contact Person Mr. N K Narang
Designation Director
Tel :+91-129-4072836
Email ID nkn@meenaar.in
Website www.meenaar.in
Accreditation Cert. No.. IB 057
Valid From 29 March 2019
Valid Upto 28 March 2026
Accreditation Standard ISO/IEC 17020:2012
Type of Inspection Body Type A
 
Scopes of Accreditation

Field of Inspection

Type and Range of Inspection

Standards / Regulations / Methods / Procedures

Number identification with year of publication

Title

IAF Scope 17a
Basic Metals, Structural Shapes-Plates, Coils


Stage wise/Finished products Inspection


EN 10028,2009


IS 4923:1997

IS 1732, 1989



IS 2062: 2006


Flat products made of steels for pressure purposes, general requirements

Hollow steel sections for structural use

Steel bars, round and square for structural and general engineering purposes-dimensions

Hot rolled low medium and high tensile structural steel

Customer requirements in the form of QAP, Client Specification etc. and Technical procedures which are generally based on National and International Codes and Standards

IAF Scope 17b
Fabricated Metal Products


Stage wise/Finished products Inspection


BS EN 545-2010



sBS EN 598 -2007+A1:2009



IS 3589-2001


Ductile iron pipes, fittings, accessories and their joints for water pipe requirements and test methods

Ductile iron pipes, fittings, accessories and their joints for sewerage
Applications. Requirements and test methods

Steel Pipes for Water and Sewage

Line Pipes

API 5L, 46th Edition 2018

ASME B 31.3-2016

ASME B 31.1-2016

AWS D 1.1:2015

Specification for line pipe

Process Piping & Piping Skids

Power Piping & Piping Skids

Structural welding code

Fittings, Flanges

IS 1239(Pt 1):2004


IS 1239(Pt 2):2004

ASTM A 234, 2015




EN 877, 1999


ASTM A 420, 2015

Steel Tubes, tubulars and other Wrought Steel fittings

Steel Tubes, tubulars and other Steel fittings

Standard Specification for Piping Fittings of Wrought Carbon Steel a
Steel for Moderate and High Temperature Service

Specification for Cast Iron Pipes and fittings Specification for Piping

Fittings of Wrought Carbon Steel and Alloy Steel for
Low-Temperature Service

Tubes

IS 1161, 2014


IS 3601, 2006


ASTM A 179, 2015



ASTM A 192, 2015


ASTM A 214, 2015



ASTM A 249, 2015



API 5CT, 2011

Steel Tubes for Structural Purposes - Specification

Steel Tubes for Mechanical and General ENG~EEWG Purposes - Specification

Specification for Seamless Cold-Drawn Low-Carbon Steel Heat-Exchangerand Condenser Tubes

Specification for Seamless Carbon Steel Boiler Tubes for High-Pressure Service

Specification for Electric-Resistance-Welded Carbon Steel Heat-Exchangerand Condenser Tubes

Specification for Welded Austenitic Steel Boiler, Super heater, Heat- Exchanger, and Condenser Tubes

Specification for Casing and Tubing

Customer requirements in the form of QAP, Client Specification etc. and Technical procedures which are generally based on National and International Codes and Standards

IAF Scope 18
Machinery and Equipment

Valve

Stage wise/ Finished products Inspection

API 598:2016

Valve Inspection and Testing

IS 9890:1981

Specification for general purpose ball valves

BS EN 12266-1:2012

Testing of Metallic Valves

API 600:2015

Bolted Bonnet Steel Gate Valves for petroleum and natural gas industries

API 6D:24th Edition

Pipeline Valves

EN 12516: 2014

Industrial Valves

Compressors

API 618 Fifth Edition, includes Errata 1 and 2 
(2009 and 2010)

Reciprocating Compressors for petroleum, Chemical and Gas industry services. 

IS 13124:1993

Reciprocating gas compressors Technical supply Conditions

Skid Mounted System

API 614-5th Edition: 2008 

Lube oil system Lubrication, shaft- sealing and oil-Control Systems and Auxiliaries, fifth Edition (ISO 10438:2008, modified

IAF Scope 19
Electrical Equipment

Electrical Machinery and Apparatus

Junction Boxes

Control Panels


Switch Gears

Stage wise / Final Inspection

IS 8623-1: 1993


IS 13947: 2004

IS 732: 1989


IS/IEC 62271: 2007

Low-Voltage Switchgear and Control Gear Assemblies

Low voltage switch gear and control gear

Code of Practice for Electrical Wiring Installations

Common High-Voltage Switchgear and Control gear Standards

IAF Scope 26

Gas Supply-NGPL with item 26A(i) of NABCB Sub-sector categorization document BCB 503 (O&G)

Stage wise

PNGRB's GSR 808 (E) dated 11.11.2009 along with latest amendments/ national/international standards mentioned therein and relevant statutes.

PNGRB's Technical Standards and Specifications including Safety Standards for Natural Gas Pipelines" Regulations,2009

Gas Supply-CGD with item 26 B(iii) of NABCB Sub-sector categorization document BCB 503 (O&G)

Stagewise /In-service

GSR 612 (E) dated 27.08.2008 along with latest amendments/ national/international standards mentioned therein and relevant statutes.

PNGRB's Technical Standards and Specifications including Safety Standards for City or local natural gas distribution networks" Regulations,2008

26-C(i) : PNGRB Regulations for IMS of Natural Gas Pipelines 

In-service

PNGRB’s F. No. Infra/IM/NGPL /12010 dated 05.11.2012 along with national /international standards mentioned therein and relevant statutes.

PNGRB´s  “Integrity Management System for Natural Gas pipelines” Regulations, 2012

Gas Supply-CGD as per item 26C (ii) of BCB 503 (O&G), Feb 2021

In-service

PNGRB’s Infra/IMP/CGD/1/2013 dated 16.05.2013 along with national /international standards mentioned therein and relevant statutes.

PNGRB’s Integrity Management System for City or Local Gas Distribution Network Regulations 2013.

 
The following offices of   Meenaar Global Consultant LLP are included under accreditation

Sl.No.

Office(s)

Address

Key activities performed


1


Main office


152-153, 1st Floor, D Tower, Vatika Mindscapes, Sector-27D, Faridabad - 121003, Haryana, India


Top management functions, quality management system functions, administration & accounts, other key activities as applicable to main office. Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

 Print 
 Close 
Close Search Window