NABCB Accredited Inspection Bodies
Project & Development India Limited
Address A-14, Sector - 1, Noida - 201 301, U.P
Contact Person Mr. M.J.Srivastava
Designation Addl. General Manager(HR-Corporate) and
Project Manager(ERP) & Management Representative
Tel 0120-2539775
Fax 0120-2530751/2529801/891
Email ID srivastavamjs@pdilin.com
Website www.pdilin.com
Accreditation Cert. No.. IB 033
Valid From 03 June 2016
Valid Upto 02 June 2027
Accreditation Standard ISO/IEC 17020:2012
Type of Inspection Body Type C
 
Scopes of Accreditation

Field of Inspection

Type and Range of Inspection

Standards / Regulations / Methods / Procedures

Number identification with year of publication

Title

IAF 17a
Basic metals

 

 

 

  • Plate

Final Inspection

IS 2062:2011

Hot rolled medium and high structural steel-specification

ASME SEC-II:2015

American Society of Mechanical Engineers(ASME) Sec - II(A,B,C & D) 2015 - for Boiler and Pressure Vessel Code

  • Tubes

Stage-wise/Final Inspection

API 5L:2008

Specification of Line Pipe

IS 1239:2010

Steel tubes, Tubulars and other Wrought Steel fittings

IS 3589:2006

Steel pipes for Water and Sewage

  • Steel Rolled Product - Angles, Channels, Beams

Final Inspection

IS 2062:2011

Hot rolled medium and high structural steel-specification

  • Union, Nipple, Fittings, Elbow, TEE

Final Inspection

SA 234:2015

Standard for pipe fittings of Wrought carbon Steel and Alloy Steel for moderate and high temperature

  • Fasteners

Final Inspection

SA 193:2012

Specification for fastener material

  • Forging and Casting Materials

Stage-wise/Final Inspection

ASME:2015

American Society of Mechanical Engineers 2015

  • Ferrous Metals and Non Ferrous Metals

Stage-wise/Final Inspection

ASME SEC-II :2015

American Society of Mechanical Engineers(ASME) Sec - II 2015 - Materials

  • Electrodes

Final Inspection

ASME SEC-II-C 

 

American Society of Mechanical Engineers(ASME) Sec-II(C) 2015 - for Boiler and Pressure Vessel Code

IS 814:2010

Covered Electrode for Manual metal arc welding

  • ERW, Seamless, CS, SS  Pipes

Final Inspection

API 5L:2008

Specification of Line Pipe

 

IS 1239:2010

Steel Tubes, Tubular and wrought steel fittings

 

IS 3589:2006

Steel pipes for Water and Sewage

IAF 17b
Fabricated metal products

 

 

 

  • Mechanical Structure

Stage-wise/Final Inspection

ASME:2015

American Society of Mechanical Engineers(ASME) - for Boiler and Pressure Vessel Code

  • Pressurized and     Un-pressurized Vessels and Tanks

Stage-wise/Final Inspection

ASME SEC-VIII DIV.01:2015

American Society of Mechanical Engineers SEC-VIII DIV.01:2015

IS 2825:2012

Code for Unfired pressure vessels

BS 1515:2009

Fusion welded Pressure vessel and C-steel

  • Gas Cylinders

 

Final Inspection

IS 2825:2012

Code for Unfired pressure vessels

  • Statutory Testing of Pressure Vessels

 

Stage-wise/Final Inspection

 

PESO Standard

  • Automatic Ultrasonic scanning of Reformer Tubes

 

Final Inspection

 

As per Client Specification

  • NDT of Ammonia Tanks

 

Stage-wise/Final Inspection

ASME BPVC SEC-V

American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) Section V - Nondestructive Examination

  • Heat Exchanger

Stage-wise/Final Inspection

TEMA:2007

Tubular Exchanger Manufacturing Association

ASME:2015

American Society of Mechanical Engineers 

IS 2825 2010

Code for Unfired pressure vessels

BS 1501 1990

Steel for pressure vessels Purpose

BS 1502:1982

Specification of Steel for fired and unfired pressure vessel

  • Boilers

 

Stage-wise/Final Inspection

 

IBR Regulations 1950, IBR Boilers Act, 1923 and Boiler operation engineers rules 2011, boiler attendants rules 2011, chief inspectors rules 2012, boiler appeal rules 2013 other subsequent addendums.

IAF 18
Machinery and equipment

 

 

 

  • Compressor

 

Stage-wise/Final Inspection

IS 10617:2013

Specification for Hermetic Compressor

  • Safety Valves

 

Final Inspection

API 527:2014

Specification for seat tightness for pressure valves

  • Pumps

Stage-wise/Final Inspection

API 675:2014

Positive displacement pumps

IS 9079:2011

Electric Moonset pumps for clear, cold water for Agricultural and water supply purposes

IS 14220:2009

Open well submersible pump set

  • Blowers

 

Stage-wise/Final Inspection

IS 941:2010

Specification of Blower and Exhauster

  • Dryers

 

Stage-wise/Final Inspection

IS 11989:2012

Compressed air dryers

  • Control Valve

Final Inspection

Witnessing of testing

API 598:2009

Valve Inspection and Testing

ISA 575-01

Flow equation for sizing control valves

API Spec 6D

Specification for Pipeline Valves (Gate, Plug, Ball, and Check Valves)

API 607

Fire Test for Soft-Seated Quarter-Turn Valves

(FCI)
70-2-1991

Control Valve Seat Leakage

IAF 19a
Electrical Equipment

 

 

 

  • LV Switchgear and Controlgear

Final Inspection

IS/IEC 60079-1:2007

Electrical apparatus for explosive gas atmosphere

IS/lEC 60529 : 2001

Degrees of protection provided by enclosures (IP code)

IS 8623 : 2013

Degree of protection provided by enclosures for low voltage switch gears and control gear

IS/IEC 60947-1 (2007)

Low-voltage switchgear and Control gear, Part 1: General rules

  • HV Switchgear and Controlgear

Final Inspection

IS/lEC 60529 : 2001

Degrees of protection provided by enclosures (IP code)

IS 11353 : 1985

Marking and arrangement for switchgear bus bars, main connections and auxiliary wiring

  • Actuator and its Station

Final Inspection

IS 9334 (1986)

Electric motor operated actuators

 

As per Approved QAP and Client Specification

  • Power, Current and Voltage Transformer

Final Inspection

IS 3156 : 2012

Voltage Transformers

IS 2705 : 2012

Current Transformers

IS 1180-1, 2 : 1989

Outdoor type three-phase distribution transformers up to and including 100 kVA 11 kV

 

  • Power and Control Cables

 

Final Inspection

Witnessing of testing

IS 694 - 2010

Polyvinyl chloride insulated unsheathed and sheathed cables/cords with rigid and flexible conductor for Rated voltages up to and including 450/750 v

IS 1554 PART-I ,II : 2010

PVC insulated electric cables

IS 7098 : 2011

Cross linked polyethylene PVC sheathed cables

IEC 332

Test on electric cable on the fire conditions

IS 10810- 1984

Method of test for cables

  • Motor & Fan-Induction Servo Type

Stage-wise/Final Inspection

IS 325 : 2012

Three Phase Induction Motors

IS 4029 - 2010

Guide for Testing Three Phase Induction Motors

IS 9815 :2009

Servo motor operated automatic line voltage correctors

IS 12802 -1989

Temperature-Rise Measurements of Rotating Electrical Machines

  • Variable Frequency Drive

Final Inspection

 

As per Approved QAP and Client  Specification

  • DG set, Alternator, Engine

Final Inspection

IS 13364-1

 

AC generators driven by reciprocating internal combustion engine, Part 1: Rated up to 20 kVA

IS 13364-2

AC generators driven by reciprocating internal combustion engine, Part 2: Rated above 20 kVA and upto 1250 kVA

  • Circuit Breakers
  • Lightening Arrestor  & Panel

 

Final Inspection

IS 13118 :2007

High-Voltage Alternating-Current Circuit-Breakers
As per approved QAP and specification

  • UPS and Battery

 

Final Inspection

IS 13314: 2008

Solid State Inverters run from storage batteries

IS 11260:2010

Stabilized Power supplies ac output

  • Motor Control Circuit Panel

Final Inspection

IS/IEC 60947-1 to 5

Low-Voltage Switchgear and Control gear

  • Insulators

Final Inspection

IS 731: 2011

Porcelain insulators for overhead power lines with  nominal voltage

IS 2259 : 2010

Method for test for insulation resistance of solid insulating materials

  • Energy Meter, Ameter, Voltmeter

Final Inspection

IS 13779: 2009

AC static watt hours meters

IS 1248 : 2008

Direct acting Indicating Analogue Electrical Measurement

  • Cathodic Protection

 

Stage-wise / Final Inspection

IS 8062 : 2007

Code for Practice for Cathodic protection of buried pipeline/Structure for transportation of Natural GAS, OIL and Liquids-Code of Practice(Part  I to V)

  • LUX Measurement

Final Inspection

IS 6665 : 2005

Code for Practice for Industrial Lighting

IAF 19b
Optical and Precision Equipments

 

 

 

  • Turbine Meter

 

Final Inspection

IS/IEC 60079-1:2007

Electrical apparatus for explosive gas atmosphere

 

 

AGA Report 7

American Gas association-Measurement of GAS by Turbine Meter/PD Meter.

 

 

IS/lEC 60529 : 2001

Degrees of protection provided by enclosures (IP CODE)

 

 

API MPMS – Chapter–5, Section -3

Manual of Petroleum
Measurement Standards
Chapter 5—Metering
Section 3—Measurement of Liquid
Hydrocarbons by Turbine Meters

  • PD Meter

Final Inspection

IS 2801:2006

Accuracy requirement for bulk meter used in petroleum trades

OIML R 117-1

Dynamic measuring systems for liquids other than water Part 1: Metrological and technical requirements

API MPMS – Chapter–5, Section -3

Manual of Petroleum
Measurement Standards
Chapter 5—Metering
Section 3—Measurement of Liquid
Hydrocarbons by Turbine Meters

AGA Report 7

American Gas association-Measurement of GAS by Turbine Meter/PD Meter.

  • PLC (programmable logic controller)

Final Inspection

IEC 61131 PARTS 1-4:2013

Programmable Controllers

IEC 61508:2010

Functional Safety of Electrical/Electronics/Programmable elements

ISA 5.3:1983

Graphic symbols for distributed controls/shared display instruments

  • DCS (distributed control system)

Final Inspection

IEC 61131 PARTS 1-4:2013

Programmable Controllers

IEC 61508:2010

Functional Safety of Electrical/Electronics/Programmable elements

ISA 5.3:1983

Graphic symbols for distributed controls/shared display instruments

  • Batch Controller

Final Inspection

OIML R87:2004

Quantity of Product in Pre packages

  • Fire and Safety System

 

Final Inspection

NFPA 72:2016

National Fire Alarm and signaling code

  • Gas Detection System

Final Inspection

IS/IEC 60079-29-1, 2 (2007)

Explosive atmospheres, Part 29:Gas detectors, Section 1: Performance Requirements of Detectors for Flammable Gases

 

 

Explosive Atmospheres Part 29 Gas Detectors, Section 2: Selection, Use and Maintenance of Detectors for Flammable Gases and Oxygen Explosive Atmospheres, Part 29: Gas Detectors, Section 2: Selection, Use and Maintenance of Detectors for Flammable Gases and Oxygen
As per Client spec. and Approved QAP

 

  • Access Control System

 

Final Inspection

 

Approved QAP and Client Specification

  • Radar Gauge

Final Inspection

OIML R117:2007

Dynamic measuring system for liquids

OIML R85:2008

Automatic level gauges for measuring the liquid in stationary store tanks

OISD-RP 108:2013`

Recommended Practices on Oil Storage and Handling

IEC 65108:2010/111

Functional Safety of Electrical/Electronic/Programmable Electronic safety related system

American Petroleum Institute (API) Manual of Petroleum Measurement Standards (MPMS)

Chapter 3, Section 1B Standard Practice for Level Measurement of Liquid Hydrocarbons in Stationary Tanks by Automatic Tank Gauging
Chapter 3, Section 6 Measurement of Liquid Hydrocarbons by Hybrid Tank Measurement Systems
Chapter 7 Temperature Determination

  • Computer, IT Hardware

Final Inspection

 

Approved QAP and Client Specification

  • LPG, CNG SKID

Final Inspection

 

Approved QAP and Client Specification

  • Gas Analyser

Final Inspection

 

Approved QAP and Client Specification

  • Liquid Analyser

Final Inspection

 

Approved QAP and Client Specification

 
The following offices of   Project & Development India Limited are included under accreditation

S.No

Location

Address

Key activities performed


01


Main office


A-14, Sector - 1, Noida - 201 301, U.P


Top management functions, quality management system functions, administration & accounts, other key activities as applicable to main office.

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

 Print 
 Close 
Close Search Window