NABCB Accredited Inspection Bodies
Dr. Amin Controllers Pvt. Ltd.
Address Embassy Chambers, 6th Floor, Plot No. 5, Road No. 3, Khar (W), Mumbai - 400052, India
Contact Person Mr. K.S. Santhosh Kumar
Designation Vice President (Technical Inspections)
Tel 022 - 26489260, 9987062758
Fax 022 - 26489270-71
Email ID info@rcaindia.com, ks@rcaindia.com
Accreditation Cert. No.. IB 029
Valid From 03 June 2015
Valid Upto 02 June 2026
Accreditation Standard ISO/IEC 17020:2012
Type of Inspection Body Type A
 
Scopes of Accreditation

Field of Inspection

Type and Range of Inspection

Standards / Regulations / Methods / Procedures

Number identification with year of publication

Title

 

IAF Scope 02
Coal

Sampling & Sample Preparation during Vessel/ Rake/ Truck Loading or Unloading for Quality Determination.

ASTM D 2234/D2234M-20

Standard Practice for collection of Gross Sample of Coal

 

ASTM D 2013/ D 2013M-21

Standard Practice for Preparing Coal Samples for Analysis

 

 

IS 436: Part 1: Sec 1 :1964, Reaffirmed 2019

Method for Sampling of Coal & Coke

 

 

ISO 18283:2022

Hard Coal & Coke � Manual Sampling

 

 

 

Client specified SOP

Client specific SOP�s based on National or International Standard and mutually agreed by Supplier & Buyer

 

  • Iron Ore

Sampling & Sample
Preparation During
Vessel/ Rake/ Truck
Loading or Unloading
for Quality
Determination

IS - 1405 :2010

IS 1405: Iron Ore Sampling
& Sample Preparation - Manual Method

 

IAF Scope 03
Food Products

  • Food grains, (Wheat Rice Maize millets, pulses etc), Oil Seeds & De-oiled cakes & Feed and Sugar,




Sampling and quality assessment, quantity assessment, weighing and supervision of cargoes at vessel barge, container, railway rakes, trucks, road tankers for loading or unloading




GAFTA 124 (01/09/2018)


GAFTA 123(01/01/2022)


GAFTA Code of Practice for Superintendents

ISO 5555:2001




Grain and Feed Trade Association. - Sampling rules No. 124

Grain and Feed Trade Association Weighing Rules No. 123

Animal and Vegetable fats and oils - sampling

 

 

FOSFA Code of Practice for Member Superintendents


SOPs based on customer requirements

Federation of Oils, Seeds and Fats Associations Ltd (FOSFA) for Member Superintendents



 

 

RSA Rules for Superintendents

Refined Sugar Association Rules for Superintendents

 

SAL Rules for Superintendents

Sugar Association of London Rules for Superintendents.

 

ISO 542:1990

Oil seeds � Sampling

 

IS 4115:1967
(Reaffirmed 2020)

Methods for sampling of Oil seeds

DACPL/COM/SOP02

Procedure for the inspection of Oil cargo during Exports Operation

DACPL/COM/SOP04

Procedure for the inspection of Dry Cargo - bulk and bagged during Export operation

DACPL/COM/SOP05

Procedure for Draught Survey

APEDA/PPP/Q/2017 dated 04/04/2018

Procedure to export of peanuts and peanut products

IAF Scope 14

HDPE Pipes

Stage-wise / Final Inspection

IS-4984:2016 up to amendment -1, May-2018

Polyethylene Pipes for Water Supply

UPVC Pipes

Stage-wise / Final Inspection

IS-4985:2021

Un-plasticized PVC Pipes for Potable Water Supplies

IAF Scope 17b

Ductile Iron Pipes

Stage-wise / Final Inspection

IS 8329:2000 upto amendment-5, Jan-2019

Centrifugally Cast (Spun) Ductile Iron Pressure Pipes for Water, Gas& Sewage

IS 11606:1986

Methods for Sampling of Cast Iron Pipes & Fittings

MS Pipes

Stage-wise / Final Inspection

IS 3589:2001 upto amendment 4 June 2010

Steel Pipes for Water & Sewage (168.3 to 2540mm outside Diameter)

Line Pipe

Stage-wise / Final Inspection

API 5L 46th Edition Apr 2018

Specification-Line Pipe

IAF Scope 18
Valves

Stage-wise / Final Inspection

IS 14845: 2000

Resilient seated cast iron air relief valves for water works purposes-specification

IS 14846: Reaffirmed 2020

Sluice valve for water works purposes (50 to 1 200 mm size)-specification

API 600 � 14th Edition May 2021

Bolted bonnet steel gate valves for petroleum and natural gas industries

API 6D � 25th Edition Nov 2021

Pipeline Valves

API 598 � 10th Edition Oct 2016

Valve Inspection and Testing

IAF Scope 19 Transformers

Stage-wise / Final Inspection

IS 2026(Part-1) 2011

Power Transformers Part 1 - General

IS 2026(Part-2):2010

Power Transformers Part 2 - Temperature Rise Test

IS 2026(Part-3):2018

Power Transformers Part 3 - Insulation Levels, Dielectric Test and External Clearance in Air

IS 2026 (Part-4) upto amendment � 2 1993

Power Transformers Part 4 - Terminal Marking, Taping & Connections.

IS 1180:Part-1 : 2014

Outdoor Type Oil Immersed Distribution Transformers Uptoand including 2 500 kVA, 33kV - Specification

Cables

IS 7098 (Part-I) :1988 upto amendment 5 April 2012

Crosslinked Polyethylene insulated PVC Sheathed cables, Part 1-for working voltage upto and including 1100V

IS-7098 (Part-2) ;2011 Amd-1, march-2015

Crosslinked Polyethylene insulated Thermoplastic Sheathed Cables. Part 2- for working voltages from 3.3kV upto and including 33kVM

IS-7098 (Part-3); Amd-4, 2013

Crosslinked Polyethylene insulated Thermoplastic Sheathed Cables. Part 3- for working voltages from 66kV upto and including 220KV

Conductor

Stage-wise / Final Inspection

IS 398 (Part 1)-1996

Aluminum conductors for Overhead Transmission purposes Part 1: Aluminium Stranded Conductors

IS-398 (Part 2): 1996 up to Amd -2 :2002

Aluminum conductors for Overhead Transmission purposes Specification, Part 2: Aluminium conductors, galvanized steel reinforced

IS-398 (Part 3): 1996

Aluminum conductors for Overhead Transmission purposes Part 3: Alumanized Steel reinforced

IS-398 (Part 4): 1994

Aluminum conductors for Overhead Transmission purposes Part 4: Aluminium alloy stranded conductors (aluminium magnesium silicon type)

Induction Motor

Stage-wise / Final Inspection.

IS 12615 : 2011

Energy efficient Induction Motors �3Phase squirrel cage

IAF Scope 26B(iii)
Gas Supply-CGD with item 26 B(iii) of NABCB Sub-sector categorization document BCB 503 (O&G)

Stage wise / In-service

PNGRB's GSR 612(E) dated 27.08.2008 along with latest amendments, national/international Standards mentioned therein and relevant statutes

PNGRB�s �Technical Standards and Specifications including Safety Standards for City or Local Natural Gas Distribution Networks� Regulations, 2008.


IAF Scope 28
Electrical, Plumbing and other Construction activities. Scope limited to Electrical Installation.

Site Audit

Installation Drawings/ Singe Line Diagram or Customer specification.

IAF Scope 30 Hotels and Restaurants
Food Catering / Food service establishments

Inspection of Food Business Operator’s facility, Plant infrastructure and inspection of Good Manufacturing practices / Good Hygiene practices

Food Safety and Standards (Licensing and Registration of Food Businesses) Regulation, 2011.

FSSAI Schedule 4 PART V, Specific Hygienic and Sanitary Practices to be followed by Practices to be followed by Food Business Operators engaged in catering / food service establishments

 
 
The following offices of  Dr. Amin Controllers Pvt. Ltd. is/are included under accreditation

S.No

Location

Address

Key activities performed


01



Mumbai
Main office

Embassy Chambers, 6th Floor, Plot No. 5, Road No. 3, Khar (W), Mumbai - 400052, Maharashtra, India


Top management functions, quality management system functions, administration & accounts, other key activities as applicable to main office.

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.


02

Ahmedabad
Branch office

A-801, Solitare Park, 8th Floor, Near Divya Bhaskar Press Office, S.G. Highway, M Makarba, Ahmedabad - 380015, Gujarat, India


Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.



03

Kolkata
Branch office

Suite No 602, Level 6, Victoria Park, Block GN, Plot No 37/2, Sector V, Salt Lake, Kolkata-700091, West Bengal, India


Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.



04

Gandhidham
Branch office

CCA Building-II, 1st Floor, Ward No. 12, Plot No. 272, Gandhidham-370201, Gujarat, India


Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.



05

Paradip
Branch office

HIG-30, Housing Board Colony, Madhuban, Paradip,Jagatsinghpur District, Odisha, India


Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.


 Print 
 Close 
Close Search Window