NABCB Accredited Inspection Bodies
Dr. Amin Controllers Pvt. Ltd.
Address Embassy Chambers, 6th Floor, Plot No. 5, Road No. 3, Khar (W), Mumbai - 400052, India
Contact Person Mr. K.S. Santhosh Kumar
Designation Vice President (Technical Inspections)
Tel 022 - 26489260, 9987062758
Fax 022 - 26489270-71
Email ID info@rcaindia.com, ks@rcaindia.com
Accreditation Cert. No.. IB 029
Valid From 03 June 2015
Valid Upto 02 June 2026
Accreditation Standard ISO/IEC 17020:2012
Type of Inspection Body Type A
 
Scopes of Accreditation

IAF Scope / Field of Inspection and Specific Item(s)

Stage and Range of Inspection(s)

Inspection Requirement(s) Standards / Regulations / Methods / Procedures

Number identification with year of publication

Title

 

IAF Scope 02

Mining and Quarrying

 

 

 

Coal

Sampling & Sample Preparation during Vessel/ Rake/ Truck Loading or Unloading for Quality Determination.

ASTM D 2234 / D2234M-20

Standard Practice for collection of Gross Sample of Coal

 

ASTM D 2013/ D 2013M-21

Standard Practice for Preparing Coal Samples for Analysis

 

 

IS 436: Part 1:

Sec 1:1964, (RA 2019)

Method for Sampling of Coal & Coke

 

 

ISO 18283:2022

Hard Coal & Coke – Manual Sampling

 

 

Client specified SOP

Client specific SOP’s based on National or International Standard and mutually agreed by Supplier & Buyer

Iron Ore

Sampling & Sample Preparation During Vessel/ Rake/ Truck Loading or Unloading for Quality Determination.

IS 1405 :2010

 

Iron Ore Sampling & Sample Preparation – Manual Method

 

IAF Scope 03

Food products, beverages and tobacco

 

 

 

Food grains, (Wheat Rice Maize Millets,

Inspection of Cargo at the vessel, Barge, Container,

SOPs based on customer requirements

As per client’s requirement

Pulses etc), Oil Seeds & De-oiled cakes & Feed, Edible Oils and Fats, and Sugar

Railway rakes, Trucks, Road tankers for loading or unloading

 

 

Sampling and Quality assessment, Quantity assessment, Weighing, Draught survey and Supervision of Cargoes at vessel barge, Container, Railway rakes, Trucks, Road tankers for loading or unloading 

GAFTA 124 (01/09/2018)

Grain and Feed Trade Association. – Sampling rules No. 124

GAFTA 123(01/01/2022)

Grain and Feed Trade Association Weighing Rules No. 123

GAFTA Code of Practice for Superintendents

Animal and Vegetable fats and oils - sampling

 

ISO 5555:2001

 

 

 

FOSFA Code of Practice for Member Superintendents

Federation of Oils, Seeds and Fats Associations Ltd (FOSFA) for Member Superintendents

 

 

RSA Rules for Superintendents

Refined Sugar Association Rules for Superintendents

 

 

SAL Rules for Superintendents

Sugar Association of London Rules for Superintendents.

 

 

ISO 542:1990

Oil seeds — Sampling

 

 

IS 4115:1967

(RA 2020)

Methods for sampling of Oil seeds

 

 

DACPL/COM/SOP02

Procedure for the inspection of Oil cargo during Exports Operation

 

 

DACPL/COM/SOP01

Procedure for the inspection of Oil cargo during Imports operation

 

 

DACPL/COM/SOP04

Procedure for the inspection of  Dry Cargo -  bulk and bagged during Export operation

 

 

DACPL/COM/SOP03

Procedure for the inspection of Dry Cargo -  bulk and bagged during Import operation

 

 

DACPL/COM/SOP05

Procedure for Draught Survey

General Manufacturing

Inspection of Food business operator’s  facility , Plant infrastructure and inspection of Good Manufacturing practices / Good Hygiene practices

Food Safety and Standards (Licensing and Registration of Food Businesses) Regulation, 2011

FSSAI Schedule 4  PART II ,  General Requirements on Hygienic and Sanitary Practices to be followed by all Food Business Operators applying for License

Milk and Milk Products (Dairy Unit)

 

FSSAI Schedule 4  PART  III  Specific Hygienic and Sanitary Practices to be followed by Food Business Operators engaged in manufacture, processing, storing and selling of Milk and Milk Products

Meat & Meat Products

 

Food Safety and Standards (Food Safety Auditing) Regulation, 2018

FSSAI Schedule 4  PART IV   Specific Hygienic and Sanitary Practices to be followed by Food Business Operators engaged in manufacture, processing, storing and selling of Meat and Meat Products

 

 

 

 

 

 

 

IAF Scope 14

Rubber & Plastic Products

 

 

 

HDPE Pipes

Stage-wise / Final Inspection

IS-4984:2016 upto Amd. 02 Apr. 2022

(RA 2021)

Polyethylene Pipes for Water Supply

UPVC Pipes

Stage-wise / Final Inspection

IS-4985:2021 Amd. 01 Mar. 2023

Un-plasticized PVC   Pipes   for Potable Water Supplies

IAF Scope 17b

Fabricated metal products

 

 

 

Ductile Iron Pipes

Stage-wise / Final Inspection

IS 8329:2000 upto Amd. 5, Jan. 2019

(RA 2020)

Centrifugally Cast (Spun) Ductile Iron Pressure Pipes for Water, Gas& Sewage

 

 

IS 11606:1986

(RA 2019)

Methods for Sampling of Cast Iron Pipes & Fittings

MS Pipes

Stage-wise / Final Inspection

IS 3589:2001 upto Amd. 5 Sept. 2022

(RA 2022)

Steel Pipes   for Water & Sewage (168.3 to 2540mm outside Diameter)

Line Pipe

Stage-wise / Final Inspection

API 5L 46th Edition, Apr 2018

Specification-Line Pipe

 

IAF Scope 18

Machinery and equipment

 

 

 

Valves

Stage-wise / Final Inspection

IS 14845: 2000

(RA 2020)

Resilient seated cast iron air relief valves for water works purposes-specification

 

 

IS 14846: 2000

(RA 2020)

Sluice valve for water works purposes (50 to 1 200 mm size)-specification

 

 

API 600 – 14th Edition May 2021

Bolted bonnet steel gate valves for petroleum and natural gas industries

 

 

API 6D – 25th Edition Nov. 2021

Pipeline Valves

 

 

API 598 – 11th Edition  February 2023

Valve Inspection and Testing

IAF Scope 19

Electrical equipment

 

 

 

Transformers

Stage-wise / Final Inspection

IS 2026 (Part-1) :2011 (RA 2021)

Power Transformers Part 1 - General

 

 

IS 2026 (Part-2) :2010 (RA 2020)

Power Transformers Part 2 - Temperature Rise Test

 

 

IS 2026 (Part-3) :2018

Power Transformers Part 3 - Insulation Levels, Dielectric Test and External Clearance in Air

 

 

IS 2026 (Part-4) upto Amd.  2 :1993

(RA 2021)

Power Transformers Part 4 - Terminal Marking, Taping & Connections.

 

 

IS 1180 (Part-1) :2014 upto Amd. 4 : 2021

(RA 2019)   

Outdoor Type Oil Immersed Distribution Transformers Upto and including 2 500 kVA, 33kV – Specification

Cables

 

 

IS-7098 (Part-I) :1988 upto Amd. 5 Apr. 2012 (RA 2020)

Crosslinked Polyethylene insulated PVC Sheathed cables, Part 1-for working voltage upto and including 1100V

 

 

 

 

 

 

IS-7098 (Part-2) :2011 Amd. 1 Mar. 2015

(RA 2021)

Crosslinked Polyethylene insulated Thermoplastic Sheathed Cables.  Part 2- for working voltages from 3.3kV upto and including 33kV

 

 

IS-7098 (Part-3): upto Amd. 4, 2013 (RA 2019)

Crosslinked Polyethylene insulated Thermoplastic Sheathed Cables.  Part 3- for working voltages from 66kV upto and including 220KV

Conductor

Stage-wise / Final Inspection

IS 398 (Part 1) :1996 with Amd. 1 :1999

(RA 2018)

Aluminum conductors for Overhead Transmission purposes Part 1: Aluminium Stranded    Conductors

 

 

IS-398 (Part  2) :1996 upto Amd. 3 : 2002

(RA 2018)

 

Aluminum conductors for Overhead Transmission purposes Specification, Part 2: Aluminium conductors, galvanized steel reinforced

 

 

IS-398 (Part 3) :1976 upto Amd. 3 : 1985

(RA 2019)

Aluminum conductors for Overhead Transmission purposes Part 3: Alumanized Steel reinforced

 

 

IS-398 (Part 4) :1994 Amd. 1 : 2000

(RA 2021)

Aluminium conductors for Overhead Transmission purposes Part 4: Aluminium alloy stranded conductors (aluminium magnesium silicon type)

Induction Motor

Stage-wise / Final Inspection.

IS 12615 : 2018 Amd. 1 : 2019

Energy efficient Induction Motors –3Phase squirrel cage

IAF Scope 22

Other transport equipment

 

 

 

Inspection of railway wagons and components

Stage wise / Final Inspection

DACPL-T-SOP-18

Procedure for Wagon Inspection

 

As per customer requirement, Approved QAP, Specification and drawing

 

 

 

As per Research Designs & Standards Organization (RDSO) specifications

 

 

 

G 72 latest issue and approved QAP/RDSO approved drawing / RDSO approved check sheet / Client WO,           

 

 

IRS- R-19-2012

RDSO specification for wheels & wheel sets

 

 

IRS R-16/1995

RDSO specification for axle reads with latest amendments

 

 

DACPL/T/F/15

Checklist for Air Brake – Wagon

 

 

DACPL/T/F/16

Checklist for Stage Inspection – Wagon

 

 

DACPL/T/F/17

Checklist for Stage Inspection – Wagon

IAF Scope 26B(iii)

Gas Supply-CGD with item 26 B(iii) of NABCB Sub-sector categorization document BCB 503 (O&G)

Stage wise / In-service

PNGRB's GSR 612(E) dated 27.08.2008 along with latest amendments, national/international Standards mentioned therein and relevant statutes

PNGRB’s “Technical Standards and Specifications including Safety Standards for City or Local Natural Gas Distribution Networks” Regulations, 2008.

IAF Scope  27

Water Supply

 

 

 

 

Stage wise / Final Inspection

3rd Edition (1999)

Central Public Health & Environmental Engineering Organization (CPHEEO) Manuals for water supply and Treatment

 

 

IS1172: 1993

(RA 2022)

Basic Requirements for Water Supply, Drainage and Sanitation

 

 

SP35 (RA 2014)

Handbook on Water Supply and Drainage (with Special Emphasis on Plumbing)

 

 

IS 2065 :1983

(RA 2022)

Code of practice for water supply in buildings

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 28

Construction

 

 

 

Electrical, Plumbing and other Construction activities. Scope limited to Electrical Installation.

Site Audit

 

Installation Drawings/ Single Line Diagram or Customer specification.

IAF Scope 30

Hotels and Restaurants

 

 

 

Food Catering /   Food service establishments

Inspection of Food Business Operator’s facility, Plant infrastructure and inspection of Good Manufacturing practices / Good Hygiene practices

Food Safety and Standards (Licensing and Registration of Food Businesses) Regulation, 2011.

FSSAI Schedule 4 PART V, Specific Hygienic and Sanitary Practices to be followed by Practices to be followed by Food Business Operators engaged in catering / food service establishments

 
The following offices of  Dr. Amin Controllers Pvt. Ltd. is/are included under accreditation

S.No

Location

Address

Key activities performed


01



Mumbai
Main office

Embassy Chambers, 6th Floor, Plot No. 5, Road No. 3, Khar (W), Mumbai - 400052, Maharashtra, India


Top management functions, quality management system functions, administration & accounts, other key activities as applicable to main office.

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.


02

Ahmedabad
Branch office

A-801, Solitare Park, 8th Floor, Near Divya Bhaskar Press Office, S.G. Highway, M Makarba, Ahmedabad - 380015, Gujarat, India


Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.



03

Kolkata
Branch office

Suite No 602, Level 6, Victoria Park, Block GN, Plot No 37/2, Sector V, Salt Lake, Kolkata-700091, West Bengal, India


Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.



04

Gandhidham
Branch office

CCA Building-II, 1st Floor, Ward No. 12, Plot No. 272, Gandhidham-370201, Gujarat, India


Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.



05

Paradip
Branch office

HIG-30, Housing Board Colony, Madhuban, Paradip,Jagatsinghpur District, Odisha, India


Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.


 Print 
 Close 
Close Search Window