NABCB Accredited Inspection Bodies

TUV India Pvt. Ltd., Industrial Services Division
Address 801, Raheja Plaza, LBS Marg, Ghatkopar (W), Mumbai - 400086
Contact Person 1 Mr. Sandeep Deshpande
Designation Associate VP - Ind. Services (India) & Operations (Mumbai)
Tel 022 - 67824100/1, 66477000
Mobile +91-9902044997
Fax 022 - 25791301, 66477009
Email ID sandeep@tuv-nord.com
Website www.tuvindia.co.in
Accreditation Cert. No. IB 015
Valid From 18 April 2013
Valid Upto 17 Jul 2024
Accreditation Standard ISO/IEC 17020:2012
Type of Inspection Body Type A

IAF Scope /

Field of Inspection

Stage and Range of Inspection

Standards / Regulations / Methods / Procedures

Number identification with year of publication

Title

IAF Scope 03

 

 

 

Food & food products

Inspection of a lot, Inspection of processes, sampling

IS: 2491:2013 Reaffirmed 2018

Food Hygiene – General Principles – Codes of Practice

 

IS: 1165:2002 Reaffirmed 2018

Milk Powder– Specification

 

 

 

IS: 1166:1986 Reaffirmed 2018

Specification for condensed milk, partly skimmed milk and skimmed condensed milk

 

 

IS: 1656:2007 Reaffirmed 2018

Milk-cereal based complementary foods – Specification

 

 

IS: 11536:2007 Reaffirmed 2012

Processed-cereal based complementary foods – Specification

 

 

IS: 11546:2012 Reaffirmed 2018

Milk and milk products – Guidance on Sampling

 

 

IS:13334 Part 1:2014 Reaffirmed 2019

Skimmed milk powder – Specification – Part 1 Standard Grade

 

 

IS:13334 Part 2 :2014 Reaffirmed 2019

Skimmed milk powder – Specification – Part 1 Extra Grade

 

 

IS 14433:2007 Reaffirmed 2018

Infant milk substitutes – Specification

 

 

IS 15757:2007 Reaffirmed 2018

Follow-up formula – complementary foods – Specification

 

In-process and Final Inspection

IS  14543: 2016

Packaged drinking water

 

 

IS 13428:2005 Reaffirmed 2018

Packaged Natural Mineral Water

 

 

 

Or equivalent to the above standard

Or as per Client PO, Specifications, Requirements for above mentioned products

 

IAF Scope 04 

Textiles & textile products

 

 

 

Inspection of Yarn, Fabric, Garments and Made-ups

Final Quality Inspection of Lot, Final Inspection

ISO 2859 - 1: 1999 (E)

Sampling procedures for inspection by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection

Mask for Nose and Mouth Protection

Final Quality Inspection of Lot, Final Inspection

ANSI/ASQ Z1.4 2003 (R2018) or ISO 2859 or equivalent to the above standard

Sampling procedures for inspection by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection

 

 

 

 

 

 

TUV Procedure

As per Client PO, Specifications, Requirements for above mentioned products

IAF Scope 12

 

 

 

Chemical and Chemical Products

Final Inspection of Lot, Quality Inspection of manufacturing process as per BIS requirements, Witness of Sample Testing, Review of Test Reports

Applicable BIS Scheme requirements for Factory Inspection” for following products:

 

 

 

IS 252:2013

Caustic Soda –Specification

 

IS 10116 : 2015

Boric Acid – Specification

 

IS 15573 : 2018

Poly Aluminum Chloride

 

IS 695 : 2020

Acetic Acid

 

IS 2833:2019

Aniline

 

 

IS 517 : 2020

Methanol

 

 

IS 5158 : 1987

Specification for Phthalic Anhydride, Technical

 

 

IS 8058 : 2018

Pyridine

 

 

IS 16113 : 2013

Gamma Picoline

 

 

IS 16112 : 2013

Beta Picoline

 

 

IS 12084 : 2018

Morpholine

 

 

IS 297 : 2001

Sodium Sulphide, Technical

 

 

IS 7129 : 1992

Potassium Carbonate, Anhydrous

 

 

IS 170 : 2004

Acetone

 

 

IS 4581: 1978

Phosphorous Trichloride, pure and Analytical Reagent

 

 

IS 11744:1986

Phosphorous Pentachloride, Technical

 

 

IS 11657:1986

Phosphorous Oxychloride, Technical

 

 

IS 2080:1980

Stabilized Hydrogen Peroxide

 

 

IS 3205:1984

Precipitated Barium Carbonate, Technical

 

 

IS 12928:1990

Precipitated Barium for Ceramic and Glass Industry

 

 

IS 4505:2015

Sodium Formaldehyde Sulphoxylate

 

 

IS 6100:1984

Sodium Tripolyphosphate, Anhydrous, Technical

 

 

IS 14709:1999

n- Butyl Acrylate

 

 

IS 336:1973

Ether

 

 

IS 5295:1985

Ethylene Glycol

 

 

IS 537:2011

Toluene

 

 

IS 15030:2001

Terephthalic Acid

IAF Scope 17a

 

 

 

Basic metals– Ferrous & Non Ferrous alloys, 

Steels in the shape of

Billets, Blooms, Slabs.

Stage-wise/

Final inspection

ASTM Section 1 – Iron & Steel Products 

 

 

Raw materials in the form of plates, structural shapes, Castings, Cast Steel Pipes Forgings, pipes, rolled sections, Bars in different shapes, Line pipes, tubes, flanges, Fittings, Fasteners, metallic & non-metallic Gaskets, Instrumentation Fittings.

 

Volume 01.02 -2019

Ferrous Castings; Ferroalloys

 

 Volume 01.01 -2019

Steel--Piping, Tubing, Fittings

 

Volume 01.03 -2019

Steel--Plate, Sheet, Strip, Wire; Stainless Steel Bar

 

 

Volume 01.04 -2019

Steel--Structural, Reinforcing, Pressure Vessel, Railway

 

Volume 01.05 -2019

Steel--Bars, Forgings, Bearing, Chain, Tool

Volume 01.06 -2019

Coated Steel Products

ASME section II Part A -2019

Ferrous Material Specifications.

 

ASME section II Part B-2019

Non-Ferrous Material Specifications.

 

 

 

IS 2062-2011

Specification for structural Steel

 

 

 

IS 1239-2011

Steel tubes & Tubulars

 

 

 

IS 3589-2001

Steel Pipes for water & sewage

 

Welding consumables

Stage-wise/

Final inspection

ASME Section II Part C-2019

 

Specifications for welding rods, electrodes and filler metals.

 

IAF Scope 17b

Pressurized & Unpressurized Vessels, Strainers,
 Steam Traps,
 Expansion Bellows, Flame arrestors, Demister Pads, Tower internals, Flare stacks, Chimneys, Gas cylinders

Design appraisal, Stage-wise/

Final inspection

ASME Section I -2019

Rules for Construction of Power Boilers

Section III -2019

Rules for Construction of Nuclear Facility Components

Section IV-2019

Rules for Construction of Heating Boilers.

Section V-2019

Non-destructive Examination

Section VIII-2019

Rules for Construction of Pressure Vessels

• Division 1

• Division 2 — Alternative Rules

• Division 3 — Alternative Rules for Construction of High-Pressure Vessels

 

 

Section IX-2019

Welding, Brazing, and Fusing Qualifications

 

 

Section X-2019

Fiber-Reinforced Plastic Pressure Vessels

 

 

IS 2825-2017

Code for unfired pressure vessels

 

 

 

PD 5500-2019

Specification for unfired fusion welded pressure Vessels

 

 

Or equivalent to the above standards e.g.

Unfired Pressure Vessel
 Water tube boilers Standards
 Shell boilers

 

 

EN 13445-2018
 EN 12952-2016

Gas-loaded accumulators for fluid power applications

 

 

 

 

 

EN 12953-2012
 EN 14359-2017
 
[
 AD 2000-Till 2019

Or equivalent to the above standards

European Pressure Equipment Directive

Heat Exchangers

Design appraisal/ Stage-wise/

Final inspection

TEMA 9th Edition

Tubular exchangers manufacturers association

Storage Tanks

Design appraisal/ Stage-wise/

Final inspection

API 620-2018

Design & construction of large welded low pressure tanks

API 650-2018

Welded tanks for Oil Storage

API 653-2018

Tank Inspection, Repair, Alteration, and Reconstruction

Welded Structures for Onshore and Offshore Purpose,

 

Design appraisal, Stage-wise/

Final inspection

Design appraisal, Stage-wise/

Final inspection

AWS D 1.1-2015

Structural welding code – Steel

Piping fabrication, installation & testing

ASME B 31.1-2018

Power Piping

ASME B 31.3-2018

(Or equivalent to the above standards e.g.    EN 13480, API 1104)

Process Piping

 

(Pipelines)

IAF Scope 18

 

 

 

Turbines

Stage-wise/

Final inspection

API 616 -2011

Gas Turbines for Refinery Services

 

 

API 611 -2014

General Purpose Steam Turbines for Petroleum, Chemical, and Gas Industry Services

 

 

API 612 -2014

 

Petroleum, Petrochemical and Natural Gas industries

- Steam Turbines 

- Special Purpose 

Applications.

Centrifugal and Reciprocating Pumps

Design appraisal, Stage-wise/

Final inspection

API 610 -2011 & IS 5120-1977

Centrifugal Pumps

 

 

API 674-2016

Reciprocating pumps

 

 

API 675-2014

Positive Metering pumps

Compressors

Stage-wise/

Final inspection

API 618-2016

Reciprocating compressors

 

Axial fans, Centrifugal Fans, Blowers, 

Design appraisal, Stage-wise/

Final inspection

Final inspection

AMCA 210-2010

Testing of Fans

Gear boxes

API 613-2007

Special Purpose Gear Units for Refinery Services

 

API 677-2016

General Purpose Gear Units for Refineries Services

Calibration of measuring & testing equipment,

Final inspection

IS 1828 Part I-2015

Calibration of UTM

 

 

IS 1586 Part II-2012

Calibration of Rockwell Hardness testing machine

 

 

IS 3766-1977

Calibration of charpy impact testing machine

Dryer units

 

Stage-wise/

Final inspection

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

Domestic appliances(Electric & non electric), 

Final inspection

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

HVAC systems, 

Stage-wise/

Final inspection

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

Diesel Generators 

Final inspection

ISO 8528-1/ISO 3046-1-2018

Reciprocating IC engine driven alternating current generating sets/Performance testing of DG sets

Industrial mixers, 

Agitators

 

Design appraisal, Stage-wise/

Final inspection 

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

 

Cooling tower package

Stage-wise/

Final inspection 

BS ISO 16345:2014

Water-cooling towers -- Testing and rating of thermal performance

All types of Cranes, Other lifting equipment and accessories, 

Design appraisal, Stage-wise/

Final inspection

IS 14470-1997, Reaffirmed -2013

Cranes – Test code & procedures,

 

 

FEM 1.001- 1998

Rules for the Design of Hoisting Appliances

Conveyor systems, Machine Tools, 

Stage-wise/

Final inspection 

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

FRP pressure vessels & tanks

Design appraisal, Stage-wise/

Final inspection

BS 4994-1987

specification for the design and construction of vessels and storage tanks in reinforced plastics

 

Rotors 

Stage-wise/

Final inspection

ISO 1940-1-2003

Mechanical vibration – Balance quality requirements for rotors in a constant (Rigid)state

Gratings

Stage-wise/

Final inspection

ANSI/NAAMM MBG531-2009

Metal Bar Grating Manual

All types of valves

 

Design appraisal, Stage-wise/

Final inspection

API SPEC 6D-2017

API 526-2018

API 527-2014

ANSI/API STD 594-2017

API 598-2016

ANSI/API599-2013

ANSI/API 600-2015

API 602-2015

ANSI/API603-2018

ANSI/API 607-2016

API 609-2016

Inspection and testing of valves

 

 

API 6FA-2018

ANSI/API574-2016

ANSI/API 576-2017

ANSI/API 608-2012

Or equivalent to the above standards

 

 

Design Appraisal

ASME B 16.34, EN 12516-2017

 

 

Heaters 

Design appraisal, Stage-wise/

Final inspection

 

API 560-2016
 Or equivalent to the above standards

Fired Heaters for General Refinery Service

IAF Scope 19a

 

 

 

HT & LT motors

Stage-wise/

Final inspection

IEC 60034-2017

Rotating Electrical machines

 

 

IS 4029-2010, Reaffirmed 2016

Guide for Testing Three Phase Induction Motors

Transformers

Stage-wise/

Final inspection

IS 2026 Part 1-2011, 2-2010, 3-2009, 4-1977, 5-2011, 6-2017, 7-2009 to 8-2009

Power Transformers

 

 

IS 11171-2016 (Reaffirmed)

 

Dry type power transformers

 

 

IS 3156 Part 1 to 4-1992 Reaffirmed 2012

 

Voltage Transformers

 

 

IS 1180 Part 1 & 2-2014

Outdoor type three-phase distribution transformers.

 

 

 

IS 12021-2015

Control Transformers for Switchgear and

Control gear for Voltages not Exceeding 1 000 V ac

Insulated wires & cables

Stage-wise/

Final inspection

IS 7098 Part 1-1988,2-2011 and 3-1993

Specification

For Crosslinked

Polyethylene Insulated

PVC Sheathed Cables

 

 

IS 694-2010 Reaffirmed -2015

PVC insulated cables for working. Voltages up to and including. 1100 volts

 

 

 

IS 1554 Part 1 & 2-1988 Reaffirmed 2015

PVC insulated (heavy duty) electric cables

 

 

 

IS 14255-1995 Reaffirmed 2015

Aerial Bunched Cables for working Voltages upto and including 1100 Volts

Reactors

Stage-wise/

Final inspection

IS 5553 Part 1-1989, 2-1990, 3-1990, 4-1989, 5-1989, 6-1990, 7-1990 and  8-1990

Shunt reactors, Current 

limiting and neutral 

earthing reactors,

Damping reactors, Tuning 

Reactor, Earthing 

transformers 

(Neutral     couplers )

 

 

 

 

Arc suppression reactors 

Smoothing reactors

Relays

Stage-wise/

Final inspection 

IS 3231-1986 Reaffirmed -2014

Specification for electrical relays for power system protection

Switch Gear

Stage-wise/

Final inspection

IS 12729/IEC 60298-2004 Reaffirmed 2014

HV Switch gears & Control gears

 

 

IS 13947, IS/IEC 60947-1-1993 -Reaffirmed 2018

LV switch gear & control gear

 

 

IS 8623-Part 1 to 3-1993 Reaffirmed 2013

Low-Voltage Switchgear and Control gear Assemblies

 

 

 

IS 62271-12008 Reaffirmed 2013

High-Voltage Switchgear and Controlgear

 

Variable frequency drives

Stage-wise/

Final inspection

IS 6297 Part 1 -1971 Reaffirmed 2017, 2-1973 Reaffirmed 2017, 3 and  4 -1972  Reaffirmed 2017

Specification for Transformers and

Inductors (Power, Audio, Pulse and Switching) for

Electronic Equipment

 

 

 

IEC 60146 Part 1 -2009 & 2-2011

 

Semiconductor convertors

Electrical measuring instruments

Stage-wise/

Final inspection

IS 1248 Part 1 to 9-2003 Reaffirmed -2018

Direct Acting Indicating Analogue electrical measuring instruments and their accessories

 

 

IS 12346-1999 Reaffirmed -2014

Testing Equipment for AC Electrical Energy Meters

Accumulators, primary cells & batteries

Stage-wise/

Final inspection 

IS 7372-1995 Reaffirmed 2012

Lead acid batteries for motor vehicles

 

 

IS 6303-2018

General requirements and methods of tests for dry cells and batteries

 

 

 

IS 15549-2005 Reaffirmed 2015

Stationary Regulated Lead Acid Batteries

 

 

 

IS 14782-2000 Reaffirmed 2015

Code of Practice for Maintenance and Testing of Large Lead Acid Batteries for Generating Stations and Substations

 

 

 

IS 10918-1984 Reaffirmed 2014

Vented type nickel cadmium batteries

 

Battery charger, Invertors, Convertors

Stage-wise/

Final inspection

IEC 146-2009

Rectifiers & Invertors

IS 16242-2014

Uninterruptible Power Systems (UPS)

 

IS 13314-1992 Reaffirmed 2013

Solid state invertors run from storage batteries

 

Flame proof enclosures

Stage-wise/

Final inspection

IEC 60079-2017

Flame proof equipment

IAF Scope 19b

 

 

 

Transmitters

 

Stage-wise/

Final inspection

IS 13122-2 -1991 reaffirmed 2016

Transmitters for use in industrial process control systems

 

Analyzers

 

Stage-wise/

Final inspection

IS 13673-5-1999 Reaffirmed 2019

Expression of Performance of Electrochemical Analyzers

Flow meters

Stage-wise/

Final inspection

IS 15672 – 2006 Reaffirmed 2017

Flow measurement of natural gas and fluids by coriolis meters

 

 

 

IS 15674- 2006 Reaffirmed 2017

Flow measurement of natural gas by ultrasonic meter 

 

 

 

IS 15675- 2006 Reaffirmed 2017

Flow measurement of natural gas and fluid by orifice plate meters 

Industrial process control equipment (PLC, DCS, SCADA, CCTV)

Stage-wise/

Final inspection

IEC 61511-2018

Functional safety of instrumented system for process industry

IEC 61131- 2013

Programmable controllers

 

IEEE 472- 1974

Electrical surge protection

 

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue, CCOE, DMRI, FM, BASSEFA, BIS standards

Instrumentation products

 

 

 

 

 

 

FAT procedure approved by client/DEC

Industrial process Control equipment (PLC, DCS, SCADA, CCTV, Fire & Gas detection systems)

Gas leak detectors

 

IS 13432-1 – 1992 Reaffirmed 2013

Gas leak detector for use with low pressure Liquefied petroleum Gas burning appliances

 

Optical fiber cables

 

IS 13882 (Part 1/Sec 1) - 2001Reaffirmed 2016

Optical Fibres Cables, Part 1:

General Specification

Fire detection systems

 

IS 2189- 2008 Reaffirmed 2013

Selection, Installation and Maintenance of Automatic Fire Detection and Alarm System Code of Practice

 

IAF Scope 22

 

 

 

Other transport Equipment

Manufacture of railway and tramway locomotives & rolling stock

Stage wise and finished (assembled) product (Railway Coaches) inspection, including

 

 

 

 

 

 

Customer requirements in the form of approved QAP, ITP, Technical work instructions, project specifications & requirements based on   National             codes and Standards as mentioned below

 

machining, Assembly, Non-Destructive, welding inspection

AIS 37:2006- 2006

Automotive Industry Standards:

 

 

Procedure for Type Approval and Establishing Conformity of Production for Safety Critical Components

 

 

IS:813 – 1986 Reaffirmed 2013

 

Scheme for symbols for welding

 

 

IS:817-1966 Reaffirmed 2019

 

Code of Practice for training and testing of metal arc, welders

 

 

IS:2074- 1992 Reaffirmed 2014

Ready Mixed paint, air drying, red oxide, zinc chrome priming specification

 

 

 

IS:2932-2003 Reaffirmed 2014

Enamel, synthetic exterior: (a)Undercoating, (b) Finishing

 

 

 

 

IS:3658- 1999 Reaffirmed 2014

Code of practice for liquid penetrant flaw detection,

 

 

 

IS:5334- 2014

Code of Practice for magnetic particle flaw detection of welds

 

 

 

IS:9595- 1996 Reaffirmed 2019

Metal arc welding of carbon and manganese steels – Recommendation

 

 

 

AWS D1.1- 2015

Structural welding, Steel; Certification

 

 

 

IS:7307 -1974 Reaffirmed 2019

Approval tests for welding Procedure — Fusion Welding of Steel

 

 

 

ASTM A 435- 2017

Straight beam ultrasonic examination of steel plates

IAF Scope 25

 

 

 

 

Electric power Generation, Transmission and Distribution- Renewable (Solar & Wind) and Transmission Line

 

Design Appraisal, Stage-wise, Final Inspection, Safety/Quality/Field 

Inspection of  Construction, Commissioning, operation of Systems and associated components

IEC 62446- 1:2016 + AMD1: 2018

 

Photovoltaic (PV) System-Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection;

 

 

IEC 62446- 3:2017

Part 3: Photovoltaic modules and plants - Outdoor infrared thermography

 

 

 

IEC 61215- 1:2021

 

 

Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1: Test requirements. 

 

 

 

 

 

IEC 61215- 2:2021

Part 2: Test procedures

 

 

 

 

IEC 61730- 1:2016

 

 

Photovoltaic (PV) module safety qualification - Part 1: Requirements for construction. 

 

 

 

 

IEC 61730- 2:2016

Part 2: Requirements for testing

 

 

 

 

IEC 62109- 1:2010 

 

 

Safety of power converters for use in photovoltaic power systems - Part 1: General requirements. 

 

 

 

 

IEC 62109- 2:2011

Part 2: Particular requirements for inverters

 

 

 

IEC 62817:2014 + AMD1: 2017

Photovoltaic systems - Design qualification of solar trackers

 

 

 

IEC 61724- 1:2021

 

IEC 61724- 2:2016

 

IEC 61724- 3:2016

Photovoltaic system performance – 

Part 1: Monitoring

Part 2: Capacity evaluation method

 

Part 3: Energy evaluation method

 

 

 

 

IEC 62093:2005

Balance-of-system components for photovoltaic systems - Design qualification natural environments

 

 

 

 

IEC 62548:2016

Photovoltaic Arrays Design requirements

 

 

 

 

IEC TS 62738:2018

Ground-mounted photovoltaic power plants - Design guidelines and recommendations

 

 

 

 

IEC 62817:2014 + AMD1: 2017

Photovoltaic systems - Design qualification of solar trackers

 

 

 

 

BS 2456:1990

Specification for floats (plastics) for float operated valves for cold water services

 

 

 

 

 

 

 

 

IEC 62446-1:2016 + AMD1: 2018

Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection

 

 

 

 

IEC/TS 63049:2017

Terrestrial photovoltaic (PV) systems - Guidelines for effective quality assurance in PV systems installation, operation and maintenance

 

 

 

IEC 61400-1:2019

Wind energy generation systems - Part 1: Design requirements

 

 

 

IEC 61400-3-1:2019

 

 

IEC 61400-3-2:2019

 

Wind energy generation systems - Part 3-1: Design requirements for fixed offshore wind turbines. 

Part 3-2: Design requirements for floating offshore wind turbines

 

 

 

IEC 61400-12-1:2017

 

 

IEC 61400-12-2:2013

 

Wind energy generation systems - Part 12-1: Power performance measurements of electricity producing wind turbines. 

Part 12-2: Power performance of electricity-producing wind turbines based on nacelle anemometry

 

 

 

IEC 61400-21:2019

Wind energy generation systems - Part 21-1: Measurement and assessment of electrical characteristics - Wind turbines

 

 

 

National Electricity Act 2003

National Electricity Act 2003

 

 

 

IEC 60204-1:2016

Safety of machinery - Electrical equipment of machines - Part 1: General requirements

 

 

 

IEC 60204-11:2018

Safety of machinery - Electrical equipment of machines - Part 11: Requirements for HV equipment for voltages above 1 000 V a.c. or 1 500 V d.c. and not exceeding 36 kV

 

 

 

IEC 61936-1:2021

Power installations exceeding 1 kV a.c. - Part 1: Common rules

 

 

 

IEC 60076-1:2011

Power transformers – Part 1: General

 

 

 

IEC 60947-1:2021

 

Low voltage switchgear and control gear-Part 1: General rules

 

 

 

IS: 432-1982-1 & : 1982

Mild steel & medium tensile steel bars & hard drawn steel wire for concrete reinforcement.  

 

 

 

IS: 802:1:2015

 

 

IS:802:2:1978

 

IS: 802:3:1978

Code of practice for use of structural steel in overhead transmission line

Part 2: Fabrication, Galvanizing, Inspection and Packing

Part 3:Testing

 

 

 

IS: 800:2007

General Construction In Steel - Code of Practice

 

 

 

IS: 4091:1979

Code of practice for design and construction of foundations for transmission line towers and poles

 

 

 

IS: 5613: Part-1:1985

 

Code of practice for design,

 

 

 

 

 

Installation and maintenance of overhead power lines. Part-1 Lines up to and including 11 kV.

 

 

 

 

IS: 5613: Part-2:1985

 

Part: 2 Lines above 11 kV and up to and including 220 kV

 

 

 

IS: 5613: Part-3:1989

Part 3 Lines above 220 kV

 

 

 

IS: 3043- 2018

Code of Practice for Earthing

 

 

 

IS: 1255 -1983

Code of practice for installation and

maintenance of power cables up to and including 33 kV rating

 

 

 

 

 

IS: 7215-1974

Specification for Tolerance for Fabrication of steel structures

 

 

 

 

 

Customer requirements in the form of Quality Assurance Plans, technical work instructions, Client specifications & drawings requirements based on above mentioned national & International Codes & Standards

 

 

IAF Scope 26

 

 

 

Gas Supply-NGPL with item 26-A (iii)

Stagewise/

In-service

1)PNGRB’s GSR 808(E) dated 
 

1)PNGRB’s “Technical Standards and Specifications including Safety

 

 

11.11.2009 along with latest amendments, national/ international standards mentioned therein and relevantstatutes

 

 

Standards for Natural Gas Pipelines” Regulations, 2009

Gas Supply –CGD with item 26-B (iii)  

Stagewise / 

In-service 

2)PNGRB’s GSR 612(E) dated 27.08.2008 along with latest amendments, national/ international standards 

2)PNGRB’s “Technical Standards and Specifications including Safety Standards for City or Local Natural 

 

 

mentioned therein and relevant statutes

Gas Distribution Network” Regulations, 2008

 

 

 

IAF Scope 28

 

 

 

Site survey & infrastructure

Stage-wise/

Final inspection

Client specifications

 

Excavation, soil classification & testing, backfilling, Compaction

Stage-wise/

Final inspection

IS 2720 Part 1 – 28 – Reaffirmed 2016

 

Methods of Test for Soils

 

 

IS 3764: 1992 Reaffirmed 2017

Code of safety for excavation work

 

 

IS 1498: 1970 Reaffirmed 2016

Classification and identification of soils for general engineering purposes

 

 

 

IS 10379– 1982 Reaffirmed 2015

Code of practice for field control of moisture and compaction of soils for embankment and subgrade 

Plain cement concrete, Reinforced cement concrete & High-performance concrete

Stage wise inspection of PCC,

RCC, HPC before, during & post concreting

IS 456– 2000 Reaffirmed 2016

Plain and Reinforced Concrete - Code of Practice

IS 3935– 1966 Reaffirmed 2017

Code of practice for composite construction

IS 13311 part 1 & 2– 1992 Reaffirmed 2013

Method of non-destructive testing of concrete

 

 

IS 13311 part 1 & 2– 1992 Reaffirmed 2013

Method of non-destructive testing of concrete

 

 

IS 10262– 2019

Concrete Mix design

 

 

 

 

 

IS 516– 1959 Reaffirmed 2013

 

Test for strength of concrete

 

 

IS 9103– 1999 Reaffirmed 2013

Specification for Concrete Admixtures 

 

 

 

IS 4925–2004 Reaffirmed 2015

Concrete Batching and Mixing Plant

 

 

IS 4926– 2003 Reaffirmed 2017

Code of Practice Ready-Mixed Concrete

 

 

IS 1642-2013

Code of practice for fire safety of buildings

Pile driving & testing

 

Stage-wise/

Final inspection

IS 2911 Part 1 to 4– 2010 Reaffirmed 2015

Design and construction of pile

Drainage systems

Stage-wise/

Final inspection

IS 1742– 1983 Reaffirmed 2017

 

Code of practice for building drainage

 

 

IS 12251– 1987 Reaffirmed 2014

 

Code of practice for drainage of building basements

Mechanical Electrical & Plumbing (MEP) works 

Stage-wise/

Final inspection

IS 12183– 1987 Reaffirmed 2014

Code of practice for plumbing in

multi-storied buildings

 

IS 2065–1983 Reaffirmed 2017

Code of practice for water supply in buildings

 

IS 732– 2019

Code of Practice for Electrical Wiring Installations

 

 

 

IS 12183 – 1987 Reaffirmed 2014

Code of practice for plumbing in multi- storeyed building

Firefighting systems

Stage-wise/

Final inspection

IS 3844– 1989 Reaffirmed 2015

Code of Practice for Installation and Maintenance of Internal Fire Hydrants and Hose Reels on Premises

 

 

IS 2189– 2008 Reaffirmed 2013

Selection, Installation and Maintenance of Automatic Fire-Detection and Alarm System - Code of Practice

 

 

National building code part IV -2016

Fire & Life Safety

 

Firefighting systems

Stage-wise/

Final inspection

IS 3844– 1989 Reaffirmed 2015

Code of Practice for Installation and Maintenance of Internal Fire Hydrants and Hose Reels on Premises

 

Bridges, Roads, pre-stressed concrete

 

IRC 40-2002

Standard Specifications and Code of Practice for Road. Bridges

 

 

 

IRC 6-2017

Standard specifications and code of practice for road bridges.

 

Dams, metro/mono rail & other massive structures 

 

IS 457– 1957 Reaffirmed 2019

Code of Practice for General Construction of Plain and Reinforced Concrete for Dams and Other Massive Structures

Masonry work

 

IS 2212– 1991 Reaffirmed 2014

Code of practice for brickworks

 

 

 

 

 

 

IS 2572– 2005 Reaffirmed 2015

Construction of hollow and solid concrete block masonry

 

 

 

IS 1905–1987 Reaffirmed 2017

Code of Practice for Structural use of Unreinforced Masonry

 

 

 

IS 1641, 1642, 1643-2013

Code of practice for fire safety of building

 

 

 

IS 9103– 1999 Reaffirmed 2013

Admixtures for concrete

Building Finishing works

Stage-wise/

Final inspection

 

Client specifications

IAF Scope 29a

Wholesale & retail trade: Pre-shipment Inspection and Certificate of Conformity (CoC / VoC / CoI) for export.

 

Packaging and artwork verification, Quantity verification, Marking Verification, Visual Inspection, Measurements, Document Check. 

 

As per Inspection Checklist, Work Instruction and Client’s PO Specification as detailed in 

1.WI/INSP/01/VOC Rev 00 

2. WI/INSP/02/VOC Rev 00  

 

 

 

1. Verification of Conformity (VOC) Procedure for Egypt

2.Pre shipment Inspection Work Instruction for Egypt covering the following products: 

Regulated Textile Products 

Ready-Made Garments including accessories like scarves, handkerchiefs, hats, gloves, etc.

Home Textiles

Carpets, Rugs and Floor Coverings

Bags and purses made of textile

Regulated Leather and Footwear Products

Regulated other Products:

Bags and purses made of leather

Dairy products

Canned and dried fruits

Edible oils & Fats

Chocolate and CoIa products

Sugar products, Pasta, grain products (bread) and bakery products

Fruit juice

Mineral, natural, sparkling water and perfume ingredients

Soap and detergents

Floor cover

Tableware, cutleries and utensils

Sanitary ware, tubs, sinks, toilet and toilet seats

Toilet paper, sanitary & cosmetic paper and baby diapers

Household tiles

Table glassware

Reinforced steel bars

Household appliances (stoves, blinders, AC system, fans, washing machines, fryers, heaters)

Offices & household furniture

Bicycles and motorcycles

Watches, Household lighting equipment, Toys

Petroleum, Chemical and Gas Cargo Inspection

 

 

 

 

Break Bulk Dry Cargo Inspection of Purified perthalic Acid (PTA), Polypropylene (PP), Ammonia, PVC Resin Bags)

Import Export Cargo Inspection - Break Bulk Dry Cargo Import / Export

WI - 01/PCG/BBDC/SOP/Rev. 01 Revision Date: 14-02-2023

Work Instruction for Inspection of Import & Export Cargo Inspection – Break Bulk Dry Cargo

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023

Work Instruction for Cargo’s Handling Procedure

 

 

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023

Work Instruction of Job File Management

 

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023

 

 

Work Instruction for collecting all Vessel Documents

Cargo Inspection of Break Bulk : Petroleum (Petrol, Diesel, Naphtha, Fuel Oil, Kerosene, Light Diesel Oil (LDO), Aviation Turbine Fuel (ATF), Crude Oil, Reformate)

Import Export Cargo Inspection - Break Bulk Liquid Cargo Import / Export

WI - 02/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023

Work Instruction for Inspection & Sampling Import & Export Break Bulk Liquid Cargo – Products

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023

Work Instruction for collecting all Vessel Documents

Sampling  of Break Bulk : Petroleum (Petrol, Diesel, Naphtha, Fuel Oil, Kerosene, Light Diesel Oil (LDO), Aviation Turbine Fuel (ATF), Crude Oil, Reformate)

Import Export Cargo Inspection - Break Bulk Liquid Cargo Import / Export

WI - 02/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Inspection & Sampling Import & Export Break Bulk Liquid Cargo – Products

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

 

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Cargo Inspection of Break Bulk Petrochemical (of Toluene, Benzene, Para-xylene,Acetone, Mix-xylene, Methanol, Ethyl Alcohol, Methyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxide, n-Butene).  

Import Export Cargo Inspection - Break Bulk Liquid Cargo Import / Export

WI - 03/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Inspection & Sampling of Import & Export Break Bulk Liquid Cargo – Petrochemicals

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Sampling  of Break Bulk : Petrochemical (of Toluene, Benzene, Para-xylene,Acetone, Mix-xylene, Methanol, Ethyl Alcohol, Methyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxide, n-Butene).

Import Export Cargo Inspection - Break Bulk Liquid Cargo Import / Export

WI - 03/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & Sampling of Import & Export Break Bulk Liquid Cargo – Petrochemicals

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Cargo Inspection of Break Bulk :  Chemical (of Sulphuric Acid, Phenol, Mono Ethyle Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate, Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Analine Oil, Lauryl Alcohol, Alfa Olifine)

Import Export Cargo Inspection - Break Bulk Liquid Cargo Import / Export

WI - 03/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Inspection & Sampling of Import & Export Break Bulk Liquid Cargo – Petrochemicals

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Sampling  of Break Bulk : Chemical (of Sulphuric Acid, Phenol, Mono Ethyle Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate, Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Analine Oil, Lauryl Alcohol, Alfa Olifine)

Import Export Cargo Inspection - Break Bulk Liquid Cargo Import / Export

WI - 03/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & Sampling of Import & Export Break Bulk Liquid Cargo – Petrochemicals

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Cargo Inspection of Break Bulk :  Edible Oil/Base Oil (of Refine blend Palm Oil (RBD), Crude Sunflower Oil (CSFO), Crude Degummed Soyabean Oil (CDSBO), Ultra – 2/3/4/6/8, SK70N, 150N, 500N, 500S, BS150, H150).

Import Export Cargo Inspection - Break Bulk Liquid Cargo Import / Export

WI- 05/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & sampling of Import & Export Break Bulk Liquid Cargo – Oils

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Sampling of Break Bulk :  Edible Oil/Base Oil (of Refine blend Palm Oil (RBD), Crude Sunflower Oil (CSFO), Crude Degummed Soyabean Oil (CDSBO), Ultra – 2/3/4/6/8, SK70N, 150N, 500N, 500S, BS150, H150).

Import Export Cargo Inspection - Break Bulk Liquid Cargo Import / Export

WI- 05/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Inspection & sampling of Import & Export Break Bulk Liquid Cargo – Oils

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Cargo Inspection of Break Bulk : Petroleum (Petrol, Diesel, Naphtha, Fuel Oil, Kerosene, Light Diesel Oil (LDO), Aviation Turbine Fuel (ATF), Crude Oil, Reformate, Jet A1)

Import Export Cargo Inspection - ISO Container Cargo Import / Export

WI- 07/PCG/ICC/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Inspection & sampling of Import & Export ISO Container

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

 

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Sampling  of Break Bulk : Petroleum (Petrol, Diesel, Naphtha, Fuel Oil, Kerosene, Light Diesel Oil (LDO), Aviation Turbine Fuel (ATF), Crude Oil, Reformate, Jet A1)

Import Export Cargo Inspection - ISO Container Cargo Import / Export

WI- 07/PCG/ICC/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Inspection & sampling of Import & Export ISO Container

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Cargo Inspection of Break Bulk Petrochemical (of Toluene, Benzene, Para-xylene, Acetone, Mix-xylene, Methanol, Ethyl Alcohol, Methyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxide, n-Butane).  

Import Export Cargo Inspection - ISO Container Cargo Import / Export

WI- 07/PCG/ICC/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Inspection & sampling of Import & Export ISO Container

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Sampling  of Break Bulk  Petrochemical (of Toluene, Benzene, Para-xylene, Acetone, Mix-xylene, Methanol, Ethyl Alcohol, Methyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxide, n-Butane).  

Import Export Cargo Inspection - ISO Container Cargo Import / Export

WI- 07/PCG/ICC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & sampling of Import & Export ISO Container

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Cargo Inspection of Break Bulk :  Chemical (of Sulphuric Acid, Phenol, Mono Ethyle Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate, Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Analine Oil, Lauryl Alcohol, Alfa Olifine)

Import Export Cargo Inspection - ISO Container Cargo Import / Export

WI- 07/PCG/ICC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & sampling of Import & Export ISO Container

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Sampling  of Break Bulk : Chemical (of Sulphuric Acid, Phenol, Mono Ethyle Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate, Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Analine Oil, Lauryl Alcohol, Alfa Olifine)

Import Export Cargo Inspection - ISO Container Cargo Import / Export

WI- 07/PCG/ICC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & sampling of Import & Export ISO Container

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Inspection of Dry Chemical of (Rock Phosphate, Zinc, Caustic in Powder form, Polypropylene (PP), Ammonia, PVC Resin Bags)

Import Export Cargo Inspection - Box Container Cargo Import / Export

 

WI - 08/PCG/BDC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection of Import & Export Cargo Inspection – Box Container Dry Cargo

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Inspection of Liquid Chemical (Caustic soda,  Lube Oil, Base oil, Toluene, Benzene, Para-xylene, Mix-xylene, Methanol, Ethyl Alcohol, EthanolMethyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxidePhenol, n-Butane).  

Import Export Cargo Inspection - Box Container Cargo Import / Export

 

WI - 04/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & sampling of Import & Export Box Container – Chemicals

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Sampling of Liquid Chemical (Caustic soda, M Lube Oil, Base oil, Toluene, Benzene, Para-xylene, Mix-xylene, Methanol, Ethyl Alcohol, EthanolMethyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxidePhenol, n-Butane).  

Import Export Cargo Inspection - Box Container Cargo Import / Export

WI - 04/PCG/BBLC/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Inspection & sampling of Import & Export Box Container – Chemicals

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Inspection of Flexi-Bag (Lube Oil, Base oil, MEG, DEG, Propylene Glycol Industrial)

Import Export Cargo Inspection - Box Container Cargo Import / Export

WI - 10/PCG/BCF/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & sampling of Import & Export Box Container- Flexi Bags

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Sampling of Flexi-Bag (Lube Oil, Base oil, MEG, DEG, Propylene Glycol Industrial)

Import Export Cargo Inspection - Box Container Cargo Import / Export

 

WI - 10/PCG/BCF/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & sampling of Import & Export Box Container- Flexi Bags

 

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Inspection of Gas Cargo Ship (Liquefied Petroleum Gas (LPG), Propane, Butane)

Import Export Cargo Inspection - Gas Cargo Ship

Cargo Import / Export

WI - 06/PCG/GC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & Sampling of Import & Export Gas Cargo – LPG

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

Work Instruction for collecting all Vessel Documents

Sampling of Gas Cargo Ship (Liquefied Petroleum Gas (LPG), Propane, Butane)

 

Import Export Cargo Inspection - Gas Cargo Ship

Cargo Import / Export

WI - 06/PCG/GC/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & Sampling of Import & Export Gas Cargo – LPG

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Inspection of Shore Line, pigging operation, checking cleanliness and compabilities prior to import / export of shipment.  

Shore Tank Inspection, Empty tank Inspection, Gauging, Sampling, Outturn Report, Dispatch and Delivery Inspection.

Terminal Operation Import / Export -Shore Line Inspection

Terminal & Shore Tank Inspection

WI - 11/PCG/STSL/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection of Import & Export Shore Tank & Shore Line

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Receipt Inspection (of Toluene, Benzene, Para-xylene, Acetone, Mix-xylene, Methanol, Ethyl Alcohol, Methyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxide, n-Butene, Sulphuric Acid, Phenol, Mono Ethyle Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate, Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Analine Oil, Lauryl Alcohol, Alfa Olifine, Refine blend Palm Oil (RBD), Crude Sunflower Oil (CSFO), Crude Degummed Soyabean Oil (CDSBO), Ultra – 2/3/4/6/8, SK70N, 150N, 500N, 500S, BS150, H150).  

Terminal Operation Import / Export -Road Tanker Inspection 

WI -12/PCG/ATT/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & Sampling of Import & Export Auto Tanker

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

Delivery Inspection (of Toluene, Benzene, Para-xylene, Acetone, Mix-xylene, Methanol, Ethyl Alcohol, Methyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxide, n-Butane, Sulphuric Acid, Phenol, Mono Ethyl Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate, Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Aniline Oil, Lauryl Alcohol, Alfa Olefin, Refine blend Palm Oil (RBD), Crude Sunflower Oil (CSFO), Crude Degummed Soybean Oil (CDSBO), Ultra – 2/3/4/6/8, SK70N, 150N, 500N, 500S, BS150, H150). 

Terminal Operation Import / Export -Shore Line Inspection

Terminal & Shore Tank Inspection

WI -12/PCG/ATT/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Inspection & Sampling of Import & Export Auto Tanker

 

WI - 13/PCG/HP/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for Cargo’s Handling Procedure

 

WI -14/PCG/FM/SOP/Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction of Job File Management

 

WI - 15/PCG/VD/SOP/R Rev. 01 Revision Date: 14-02-2023 

 

Work Instruction for collecting all Vessel Documents

IAF Scope 39

Other Social Services

 

 

 

Amusement Park Play Ground Equipment’s

Safety and Quality inspection during stage-wise construction, commissioning, In-Service

ISO 17842-1: 2015

 

 

Safety of Amusement Rides and Amusement devices- Design & manufacture

ISO 17842-2: 2015

Safety of Amusement rides & Devices- Operation & Use

 

 

 

ISO 17842-3: 2015

Safety of Amusement rides & Devices- Requirements for Inspection during Design, Manufacture, Operation & Use

 

 

EN 1176-1: 2017

Playground equipment & surfacing- General safety requirements and test methods

 

 

EN 14960-1: 2019

Inflatable play equipment- safety requirements and test methods

 

 

 

 

Or equivalent to the above standard.

 

Customer requirements in the form of Quality Assurance plans, technical work instructions, Client specifications & drawings requirements based on national & International Codes & Standards mentioned above

 
The following offices of TUV India Pvt. Ltd., Industrial Services Division is/are included under accreditation

S.No

Location

Address

Key activities performed

01

Main office

801, Raheja Plaza, LBS Marg, Ghatkopar(W), Mumbai - 400 086

 

Top management functions, quality management system functions, administration & accounts, other key activities as applicable to main office.

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

Close Search Window