NABCB Accredited Inspection Bodies
SGS India Pvt. Ltd.
Address NITCO BIZ PARK, 5th Floor,Plot No. C/19, Road # 19,Wagle Industrial Estate, MIDC, Thane (West ) - 400 604,Maharashtra, India
Contact Person Mr Vishwas Nakhwa
Designation National Manager – Quality, Industrial Services
Tel +91 22 6187 0110
Fax +91 22 6187 0347
Mobile +91 7738499740
Email ID sgs.india@sgs.com,vishwas.nakhwa@sgs.com
Website www.sgs.com
Accreditation Cert. No.. IB 003
Valid From 24 September 2009
Valid Upto 23 December 2024
Accreditation Standard ISO/IEC 17020:2012
Type of Inspection Body Type A
 

Scopes of Accreditation

IAF Scope Sector Classification Code / Inspection Field and Specific Item 

Stage and Range of Inspection(s)

Inspection Requirement(s)

Standards / Regulations / Methods / Procedures

Number identification with year of publication

Title

IAF Scope 02

Coal & Coke               

Inspection of cargo of Rakes/ Trucks before during/ after/loading & unloading for quality determination and Review of Test Reports.

 

 

 

Sampling

IS-436 (Part1/Sec1)-1964 &

Methods of Sampling of Coal and Coke

 

Sample Preparation

IS-436 (Part1/Sec1)-1964

Methods of Sampling of Coal and Coke

 

Sampling

ISO 18283:2006/ 

Hard Coal and Coke – manual sampling 

 

Stock Volumetric Assessment by Conventional Method 

SOP 

SO-IN-MIN-TE-17/Ver.1.1/10.08.2015

 

Volumetric Assessment of Cargo Inside wagon

SOP

SO-IN-MIN-TE-O25/Ver.1.0/01.08.2015

Coal  

Sampling 

ASTM D 2234 / D2234M-17

Collection of Gross sample of Coal 

 

Sample preparation

ASTM D 2013/2013M-2012

Standard Practice for preparing Coal samples for analysis

 

Coal & Coke

Inspection of cargo of Ships/ Rakes/ Trucks before during/ after/loading & unloading for quality determination and Review of Test Reports.

 

 

 

Sampling

IS-436 (Part1/Sec1)-1964

Methods of Sampling of Coal and Coke

 

Sample Preparation

IS-436 (Part1/Sec1)-1964

Methods of Sampling of Coal and Coke

 

Sampling

ISO 18283:2006/ 

Hard Coal and Coke – manual sampling 

 

Coal  

Sampling 

ASTM D 2234 / D2234M-17

Collection of Gross sample of Coal 

 

Sample preparation

ASTM D 2013/2013M-2012

Standard Practice for preparing Coal samples for analysis

 

Draft Survey 

SOP 

Draft survey 

IAF Scope 04

Textile and textile products

 

Final Inspection

 

 

PPEs for Nose and Mouth Protection 
 (Mask, Medical/Surgical Mask & Respirators)

 

General tests carried out - Physical appearance, Workmanship and defects, Packing and Marking; Function check; Size Measurement, etc.

ANSI/ASQ Z1.4 2008 (R2018) or ISO 2859 or its equivalent standard

Sampling procedures for inspection by attributes

 

 

 

SOP No. WI-IN-CRS-IN-004

Work Instructions for Inspection of Surgical Masks & Respirators

 

 

Specifications from clients

 

PPE Medical Coverall

Final Product Inspection for quality compliance, report review as per product specifications

Customer specifications

 

 

Apparels / Garments / Clothing

 

Final Inspection of a lot

General tests carried out - Physical appearance, Workmanship and defects, Packing and Marking; Function check; Size Measurement, etc.

Verification against Reference Sample

ANSI/ASQ Z1.4 2008 (R2018) or ISO 2859 or its equivalent standard

Sampling procedures for inspection by attributes 

 

 

SOP Nos P-INSP-WI-SL-001

 

Specifications and       instructions from clients

Internal Work Instruction for inspection of Garments

 

Made-ups / Home Textiles

 

Final Inspection

General tests carried out - Physical appearance, Workmanship and defects, Packing and Marking; 

Function check; Size Measurement, etc.

Verification against Reference Sample

ANSI/ASQ Z1.4 2003 (R2018) or ISO 2859 or its equivalent standard

Sampling procedures for inspection by attributes 

 

 

SOP No P-INSP-WI-SL-002

Work Instructions for Inspection of Home Textiles

 

Specifications and    instructions from clients

 

 

PPEs for Body Wear (Jacket, Coat, Vest, Trousers, Coverall, Aprons, Head Cover & Shoe cover)

 

Final Inspection

General tests carried out - Physical appearance, Workmanship and defects, Packing and Marking; Function check; Size Measurement, etc.

ANSI/ASQ Z1.4 2003 (R2018) or ISO 2859 or its equivalent standard

Sampling procedures for inspection by attributes 

 

SOP WI-IN-CRS-IN-005

Work Instruction for Inspection of PPEs for Bodywear

 

 

Specifications from Clients

 

Jute Bag

Final Inspection of a lot -

General tests carried out - Physical appearance, Workmanship and defects, Packing and Marking; Function check; Size Measurement, etc

IS 16186:2014 (amended till date)

 

Textiles-Light Weight Jute Sacking Bags for Packing 50 kg Food grains — Specification

 

SOP No. PR-IN-CRS-IN-011

 

PP/ HDPE Bags

Final Inspection of a lot-

General tests carried out - Physical appearance, Workmanship and defects, Packing and Marking; Function check; Size Measurement, etc

 

 

 

 

IS 14887:2000

High Density Polyethylene (HDPE)/ Polypropylene (PP) Woven sacks for packing 50 kg/ 25 kg Food grains

IAF Scope 14

UPVC Pipes

 

 

 

Pressure Pipes

Stagewise / Finished product inspection

IS 4985 : 2000, 

Unplasticized PVC Pipes for Potable Water Supply

 

 

IS 532 : 2006

Bicycle tube valves and Valve-tubing specifications.

 

 

ISO 1452-2: 2009

 

Plastics piping systems for water supply and for buried and above-ground drainage and sewerage under pressure -- Unplasticized poly(vinyl chloride) (PVC-U) -- Part 2: Pipes

 

 

ASTM D1785 : 2015

Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120

 

 

ASTM D2241 : 2015

Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)

 

 

DIN 8062 : 2009-10 

Unplasticized Polyvinyl Chloride(PVC-U) Pipes- dimensions

 

 

AS/NZS 1477: 2006

PVC Pipes & Fittings for Pressure Applications

 

 

 

PNS 65 : 1993

Philippines National Standard no. PNS 65 : 1993  for Unplasticized PVC Pipes for Potable Water Supply

Screen & Casing Pipe

Review of raw material test certificates, Witness of Routine Acceptance test, review of long duration type tests

IS 12818 : 2010

Unplasticized Polyvinyl Chloride(PVC-U) Screen & Casing Pipes for Bore/tube well specifications

 

ASTM F 480 : 14

Standard Specification for Thermoplastic Well Casing Pipe and Couplings Made in Standard Dimension Ratios (SDR), SCH 40 and SCH 80

 

 

DIN 4925 : 2014-09

Well Screens And Casings Of Unplasticized Polyvinylchloride (pvc-u) For Tube Wells - Part 2: DN 100 To DN 200 with Trapezoidal Thread

 

 

DIN 4925-3:2012-10

Well Screens And Casings Of Unplasticized Polyvinylchloride (pvc-u) For Tube Wells - Part 2: DN 250 To DN 400 with Trapezoidal Thread

 

Cable Duct Pipe

 

Stagewise / Finished product inspection

 

IS 14787 : 2000 (Reaffirmed 2005

Unplasticized Pvc Pipes (ducts) And Fittings For Underground Telecommunications Cable Installation – Specification

SWR Pipe

 

Stagewise / Finished product inspection

IS 13592 : 2013

 

Unplasticized Polyvinylchloride (pvc-u) pipes for Soil & Water.

 

 

 

Discharge system for inside & outside buildings including ventilation & rain water system specifications

Pipe for Suction & Delivery

 

Stagewise / Finished product inspection

IS 12231 : 1987

 

Unplasticized Polyvinylchloride (pvc-u) pipes for use in Suction & Delivery Lines of Agricultural Pump sets.

Sure – Loc Screen & Casing Pipe

Stagewise / Finished product inspection

ASTM D1785 : 2015, 

Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120

 

 

ASTM D2241 : 2015

 

Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)

Sure – Loc Column Pipe

 

Stagewise / Finished product inspection

ASTM D 1785 : 2015

 

Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120

PVC – U Pipes for use in underground drainage and sewerage systems

Stagewise / Finished product inspection

IS 15328 : 2003

 

PVC – U Pipes for use in underground drainage and sewerage systems

Fabricated PVC Fittings for Potable Water Supplies.

Stagewise / Finished product inspection

IS 10124 : 2009.

 

Fabricated PVC Fittings for Potable Water Supplies.

Injection Moulded PVC socket Fittings with Solvent Cement Joints for Water Supply

Stagewise / Finished product inspection

IS 7834 : 1987

 

Injection Moulded PVC socket Fittings with Solvent Cement Joints for Water Supply

PE Pipes

 

 

 

HDPE Pressure Pipes

Stagewise / Finished product inspection

IS 4984 : 1995 (PE 63, 80 & 100), (Reaffirmed 2008)

High density polyethylene pipes for potable water supplies

 

 

DIN 8074 : 2011-12 (PE 63, 80 & 100)

Polyethylene (PE) - Pipes PE 80, PE 100 – Dimensions

 

 

ASTM D2104 -03  

Standard Specification for Polyethylene (PE) Plastic Pipe, Schedule 40 

 

 

ASTM D2239 : 2012

Standard Specification for Polyethylene (PE) Plastic Pipe (SIDR-PR) Based on Controlled Inside Diameter

 

 

ASTM D2447-03

Standard Specification for Polyethylene (PE) Plastic Pipe, Schedules 40 and 80, Based on Outside Diameter (Withdrawn 2010)

 

 

ASTM D2737: 2012

Standard Specification for Polyethylene (PE) Plastic Tubing

 

 

ASTM D3035 : 2014

Standard Specification for Polyethylene Plastics Pipe and Fittings Materials.

 

 

ASTM F714 : 2013

Standard Specification for Polyethylene (PE) Plastic Pipe (DR-PR) Based on Outside Diameter

HDPE Sprinkler Pipe Plastic Piping Systems – Polyethylene (PE) Pipes for Water Supply

Stagewise / Finished product inspection

IS 14151 (Part 1):1999, 

 

Irrigation Equipment –Sprinkler Pipes specifications.

Part 1: Polyethylene Pipes

 

 

IS 14151 (Part 2):2008

 

Irrigation Equipment –Sprinkler Pipes specifications.

Part-2 : Quick Coupled Polyethylene Pipes and fittings

Plastics Piping Systems for water supply – Polyethylene (PE) Part 2 : Pipes

Stagewise / Finished product inspection

ISO 4427 – 2 & 3 : 2007 (PE 63, 80 & 100 ) ( With Amd 1 : 2014)

Plastic Piping Systems-Polyethylene PE Pipes & Fittings for water supply. 

 

Gas Pipes

 

Stagewise / Finished product inspection

IS 14885 : 2001

 

Polyethylene Pipes for the supply of Gaseous Fuels specifications.

ENGSPEC/01/03-R4

 

 

 

Technical Specification for Polyethylene Pipe for Natural Gas

(And suitable manufactured gases) for use at pressure up to 4 bar (g)

OR any equivalent standards

(All the above standards with latest amendments)

Sewerage Pipe

 

Stagewise / Finished product inspection

BS EN 12201-1:2003,

Plastic piping systems for water supply. Polyethylene (PE). General.

 

 

BS EN 12201-2:2011+A1:2013 (PE 63, 80 & 100 )

Plastics piping systems for water supply, and for drainage and sewerage under pressure. Polyethylene (PE). Pipes

PLB HDPE Duct

 

 

Stagewise / Finished product inspection

IS 14333 : 96 (Reaffirmed 2001)(PE 63, 80 & 100)

High Density Polyethylene Pipes for sewerage specifications

 

HDPE Double Wall Corrugated  (DWC) Pipe

Stagewise / Finished product inspection

BSNL Spec. (TEC/GR/TX/CDS-008/03/ March 2011)

BSNL Technical specifications for HDPE duct pipes

Polyethylene (PE) Pipes for Pressure and Gas Application

 

Stagewise / Finished product inspection

BSNL Spec. (GR/DWC-34/01SEP 2007) & IS:14930 (Part-1) : 2001 amendment no.2 April2011 

BSNL Technical specifications for HDPE duct pipes 

 

 

IS:14930 (Part-2) : 2001

Conduit Systems for Electrical. Installations

 

 

PR EN 13476 -1: 2007 (E), PR EN 13476 -2: 2007 (E),  EN 13476-3:2007+A1:2009

Plastics piping systems for non-pressure underground drainage and sewerage - structured-wall piping systems of unplasticized poly(vinyl chloride) (pvc-u), polypropylene (pp) and polyethylene (pe) - part 2: specifications for pipes and fittings with smooth internal and external surface and the system

Polyethylene (PE) Pipes for Pressure Applications

Stagewise / Finished product inspection

AS/NZS 4130 : 2009

Polyethylene (PE) Pipes for Pressure Applications

 

 

AS/NZS 5065 : 2005 

Polyethylene and polypropylene pipes and fittings for drainage and sewerage applications

 

Fabricated and Machined HDPE Fittings for Potable Water Supplies

Stagewise / Finished product inspection

IS 8360 (Part 1 to 3) : 1977 (R2002)

 

Specifications for fabricated high density polyethylene. (HDPE) fittings for potable water supplies

Injection Moulded HDPE Fittings for Water Supply

Stagewise / Finished product inspection

IS 8008 (Part 1 to 9) : 2003

Injection Moulded/Machined High Density Polyethelyene HDPE Fittings for Potable Water Supply.

HDPE Fittings for Potable Water Supplies

Stagewise / Finished product inspection

BS EN 12201-3:2011+A1:2012

Plastics piping systems for water supply, and for drainage and sewerage under pressure. Polyethylene (PE). Fittings

 

 

ISO – 4427 – 3 : 2007

Plastic Piping Systems-Polyethylene PE Pipes & Fittings for water supply.

 

 

 

OR any equivalent standards

(All the above standards with latest amendments)

Rubber products

 

 

 

PPEs for Hand Protection (Surgery Gloves, Latex, Nitrile, PVC based examination & general household purpose Gloves)

Final Inspection

General tests carried out - Physical appearance, Workmanship and defects, Packing and Marking; Function check; Size Measurement, witnessing of tests etc.

ANSI/ASQ Z1.4 2003 (R2018) or ISO 2859 or its equivalent standard 

 

Sampling procedures for inspection by attributes

 

 

DIN EN 455-1:2000

Medical gloves for single use Part 1: Requirements and testing for freedom from holes

 

 

ASTM D3577−09 (Reapproved 2015)

Standard Specification for Rubber Surgical Gloves

 

 

ASTM D3578−05 (Reapproved 2015)

Standard Specification for

Rubber Examination Gloves

 

 

ASTM D5250−06 (Reapproved 2015)

Standard Specification for Poly (vinyl chloride) Gloves for Medical Application

 

 

ASTM D6319−19

Standard Specification for Nitrile Examination Gloves for Medical Application

 

 

 

 

 

ASTM D4679−02 (Reapproved 2015)

Standard Specification for Rubber General Purpose, Household or Beautician Gloves

 

 

SOP No. WI-IN-CRS-IN-007

Work Instruction for Inspection of Rubber Gloves

Plastic products

 

 

 

PPEs for Eye Protection (Goggles, Full Face Shield & Spectacle)

Final Inspection

General tests carried out - Physical appearance, Workmanship and defects, Packing and Marking; Function check; Size Measurement, etc.

ANSI/ASQ Z1.4 2003 (R2018) or ISO 2859 or its equivalent standard

Sampling procedures for inspection by attributes 

 

 

 

SOP No WI-IN-CRS-IN-006

Work Instruction for Inspection of PPEs for Eye Protection

IAF Scope 17

Mechanical Equipments

 

 

 

Pressure vessels – like Vessels, Distillation columns, process equipment, etc.

Basic metals (Ferrous & Non ferrous ) – plates, coils, pipes, tubes, Castings, forgings  Etc. &

Fabricated Equipments

Stagewise / Finished product inspection

 

 

ISO/IS/EN/ASME/ASTM/JIS/ BS/Specific Product standards, Internal SOP’s

 

 

ASME-Sec. II:2019 

Specifications for ferrous & Nonferrous material, filler metals & welding rods 

 

ASME-Sec. V:2019 

Specifications for Non destructive Examination

 

 

ASME-Sec. VIII Div I & DIV II:2019 

Construction of pressure vessels and Design of pressure vessels

 

 

ASME-Sec. IX:2019 

Welding & Brazing specifications 

 

 

PD 5500:2015

 

British standard specification for unfired fusion welded pressure vessel

 

 

 

IS 2825:1988

 

Construction of pressure vessels Indian Standard for unfired pressure vessels design and construction

 

 

AWS D1.1M:2015

American Welding Society's Structural Welding Code – Steel.

Storage Tanks(IS)

 

API 650: 2013

Construction of Storage Tanks As per API standards

Heat Exchanger

 

 

TEMA:2015  

 

Tubular Exchanger Manufacturers Association – Standard for design & construction of Heat Exchangers

Boiler

 

IBR: 1950

Construction and design verification as per Indian Boiler Regulations

 

 

BS 1113 – 1999

Specification for design and manufacture of water-tube steam generating plant (including superheaters, reheaters and steel tube economizers)

 

 

 

OR any equivalent standards
 (All the above standards with latest amendments)

Other applicable National / International Specifications / Standards / Client specific requirements / Internal Procedures

Steel Pipes

Stagewise / Finished product inspection

API 5L: 46th Updated on 2020 

Specification line pipe

 

 

IS:1239 (Part1):2004 & Part(2):2011

Steel Tubes & Tubulars & other wrought Steel Fittings specifications

 

 

IS 3589-2001 Add. 2010

Steel Pipes for Water & Sewage (168.3  to 2540mm  OD) specifications.

 

 

 

All ASME/ASTM- Specification for seamless / welded / ERW pipes

All IS- Indian Standard for Welded and ERW pipes

OR any equivalent standards
 (All the above standards with latest amendments )

Gas Cylinders

Stagewise / Finished product inspection

 

Gas cylinders CNG

 

 

 

NZS-5454:1989

 

Requirements for Light Weight Steel Automotive compressed natural gas cylinders

 

 

ISO 11439:2013

High Pressure Cylinders for on board storage of natural gas as a fuel for automotive vehicles

 

 

ISO 9809–1:2010

 ISO 9809 – 2:2010 

ISO 9809 – 2:2010

Refilliable seamless steel gas cylinders – Design, construction & testing

 

 

 

BS-5045-Part 1:1982 / BS EN 1964-1:2000  

British standard for seamless steel gas containers above 0.5 Liter water capacity.

 

 

IS 15490-2004

Seamless Steel Cylinders for on-Board Storage of Compressed Natural Gas as a Fuel for Automotive Vehicles-Specification

 

 

IS 7285 Part 2-2017

Refillable Seamless Steel Gas Cylinders - Specification Part 2 Quenched and Tempered Steel Cylinders With Tensile Strength Less Than 1100 MPa (112 kgf/mm)

 

 

 

OR any equivalent standards
 (All the above standards with latest amendments)

Other applicable National / International Specifications / Standards / Client specific requirements / Internal Procedures

Ductile Iron Pipes & Fittings

Stagewise / Finished product inspection

BSEN : 545 : 2010

Ductile iron pipes, fittings, accessories and their joints for water pipelines - Requirements and test methods

 

 

BSEN: 598 : 2007+A1:2009  

Ductile iron pipes, fittings, accessories and their joints for sewerage applications. Requirements and test methods

 

 

ISO: 2531:2009

 

Ductile iron pipes, fittings, accessories and their joints for water applications.

 

 

IS : 8329 : 2000(R2005)

Centrifugally Cast (spun) Ductile Iron Pressure Pipes For Water, Gas And Sewage – Specification

 

 

IS: 9523 : 2000(R2005)

Ductile Iron Fittings For Pressure Pipes For Water, Gas And Sewage - Specification

 

 

 

OR any equivalent standards
 (All the above standards with latest amendments )

Over head Transmission line Tower fabrication, testings

Stagewise / Finished product inspection

IS 808 : 1999, 

 

Dimensions for hot rolled steel beams, column, channel and angle section.

 

 

IS 1730 : 1989  

 

Steel Plate , Sheets, Strips, and flats for structural and general engineering purpose - Dimensions.

 

 

IS: 1852: 1998 

Specification for rolling and cutting tolerance for hot rolled steel products.

 

 

BSEN 10056

Structural steel equal and unequal leg angles.

 

 

JIS G3101-2004 

Rolled steels for general structure

 

 

JIS G3192-2000 

Dimension mass and permissible variations of hot rolled steel sections.

 

 

ASTM A572/A 572M-15

Standards specification for high –strength low alloy Columbian-vanadium structural steel.

 

 

ASTM A36/A36M -14

Standards specification for carbon structural steel.

 

 

ASTM A 123/ A123M-15

Standard specification for Zinc(Hot dip galvanized) coatings on iron and steel products.

 

 

ASTM A 153/ A153M-16

Standard specification for Zinc coating (Hot dip) on iron and steel Hardware

 

 

JIS B 1052-6:2009

Mechanical properties of fasteners

 

 

DIN 7967

Dimensions for Fasteners.

 

 

IEC 60652:2004

Loading test on overhead line structure.

 

 

 

Clients GA(General Arrangement Drawings)

For Tower erection purpose.

 

 

OR any equivalent standards
 (All the above standards with latest amendments)

Other applicable National / International Specifications / Standards / Client specific requirements / Internal Procedures

Freight Container Mechanical Seal

Final Inspection as per Clause 6 of ISO 17712:2013

ISO 17712 :2013

Freight Container Mechanical Seal

Iron Ore Pellets

Sampling, sample preparation of Stationary Stockpiles and during loading/unloading into Rakes/Truck

 

SO-IN-MIN-TE-066/ ver.1.0/ 25.09.2020

Iron Ore Pellets Inspection

 

 

Volumetric assessment inside wagon - Iron Ore Pellets

 

SO-IN-MIN-TE 025 /ver1.0 /06.08.2015

Volumetric 

assessment of cargo inside wagon

 

Physical Stock Assessment- Iron Ore Pellets

SO-IN-MIN-TE-017/ ver.1.1/ 10.08.2015

Procedure for Stockpile Quantity Assessment (by Conventional Method)

 

Size/ Sieve Analysis

IS 1607: 2013 (Reaffirmed Year: 2018

 

 

Methods of Test Sieving

 

Iron Ore Pellets -Tumbler Test

IS 6495: 2019  

Method of Tumbler Test for Iron Oxides: Lump Ores, Sinter and Pellets (Second Revision)

 

 

Sampling & Sample preparation of Iron ore pellets

IS 9101: 1979 (Reaffirmed Year: 2019

Methods of sampling iron ore pellets

 

Witnessing of Iron Ore Pellets Inspection

SO-IN-MIN-TE-051/ ver.1.0/ 17.11.2017

Observation (Witnessing) of Inspection & Testing

 

IAF Scope 18

Machinery and Equipment

 

 

 

Valves

Stagewise / Finished product inspection

API 598 : 2016 Tenth Edition

Valve Inspection and Testing

 

 

IS 9890 : 1981

Specification for general purpose ball valves

 

 

BS EN12266-1 : 2012

Testing of metallic valves.

 

 

API 598 : 2009

Valve inspection and testing

 

 

API 600 : 2015

Bolted bonnet steel gate valves for petroleum and natural gas industries

 

 

API 602 : 2015

Compact Steel Gate Valves—Flanged, Threaded, Welding, and Extended-Body Ends

 

 

ASME B16.34 : 2013

Valves—Flanged, Threaded, and Welding End

 

 

EN 12516 : 2014

Industrial valves. Shell design strength. Calculation method for steel valve shells

 

 

API 6A – 21st Edition : 2018

Specification for Wellhead and Christmas Tree Equipment’s

 

 

API 6D – 24th Edition : 2014

Pipeline Valves

 

 

API 526-7th Edition : 2017

Flanged Steel Pressure Relief Valves

 

 

API 603- 9th Edition : 2018

Corrosion Resistant Bolted Bonnet Gate Valves

 

 

API 608:2012

Metal Ball Valves- Flanged Threaded and Welding ends

 

 

API 609-8th Edition : 2016

Butterfly Valves- Doubled Flanged Lug and Wafer Type

 

 

API 6FA -4th Edition includes Errata 1 & 2 : (2018)

Specification for Fire Test Valves

 

 

API 694-8th Edition  : 2017

Check Valves Flanged Lug and Wafer Type and Butt Welding

 

 

API 607 : 2016

Fire Test for soft seated Quarter Turn Valves

Pumps

Stagewise / Finished product inspection

 

API 674, Includes Errata (May 2014), Errata 2 (April 2015)

Positive Displacement Pumps - Reciprocating,

 

 

API 610, 12th edition : 2015

Centrifugal Pumps for Petroleum,. Petrochemical and Natural Gas

 

 

API 676

Positive Displacement Pumps Rotory

 

 

API 675, 3rd Edition, Includes Errata (June 2014)

Positive Displacement Pumps-Controlled Volume for Petroleum, Chemical, and Gas Industry Services

 

 

BIS IS 5120 :1977 (R2001)

Technical Requirements For Rotodynamic Special Purpose Pumps

 

 

API 610 API Std 610 Errata (2011) Eleventh Edition (ISO 13709:2009 Identical Adoption), Includes Errata (July 2011)

Centrifugal Pumps for Petroleum, Petrochemical and Natural Gas Industries

 

 

IS 6595 : 2002

Horizontal centrifugal pumps for clear, cold water— specification

 

 

IS 11745 :  1986

Technical supply conditions for positive displacement pumps-reciprocating.

 

 

IS 5120 : 1977

Technical requirements for roto dynamic special purpose pumps

 

 

API 610 : 2010

Centrifugal pumps for petroleum, heavy duty chemical, and gas industry service

 

 

API 674 : 1995

Positive displacement pumps – Reciprocating

 

 

API 675 : 2014

Positive displacement pumps – Controlled volume

Bearings

Stagewise / Finished product inspection

IS 13962 : 1994

Rolling bearings - metric tapered roller bearings - designation system.

 

 

API 670 : 2014

Machinery Protection Systems

Gaskets

Stagewise / Finished product inspection

IS 11149 : 1984

Rubber gaskets

 

 

IS 2712 : 1998

Gaskets and packings - compressed asbestos fiber jointing.

 

 

ASTM F 104-11 : 2015

Standard Classification System for Nonmetallic Gasket Materials.

 

 

ASTM C-564-14 : 2015

Standard Specification for Rubber Gaskets for Cast Iron Soil Pipe and Fittings.

 

 

ASTM D5926 – 15 : 2015

Standard Specification for Poly (Vinyl Chloride) (PVC) Gaskets for Drain, Waste, and Vent (DWV), Sewer, Sanitary, and Storm Plumbing System

Axial Fans, Blowers, Dryers

Stagewise / Finished product inspection

IS 4894 : 1987

Specification for -centrifugal fans

 

 

IS 1710 :1989

Specification for pumps — vertical turbine mixed and axial flow, for clear cold water

HVAC systems

Stagewise / Finished product inspection

IS 659 : 2004

Safety Code for Air Conditioning

 

 

IEC 60335 series

Safety of Electrical Household appliances

Air conditioning machines : Refrigeration and freezing equipment and heat pumps, except household type equipment, Non- domestic cooling and ventilation equipment

Stagewise / Finished product inspection

IS 659, rev1 : 1964, Reaffirmed 2017

Safety code for air conditioning

Heat Exchangers

Stagewise / Finished product inspection

IS 4503 :1967

Specification for shell and tube type heat exchangers.

 

 

TEMA : 2007

The Tubular Exchanger Manufacturers Association

 

 

ASME Sec VIII : 2019

Rules for construction of pressure vessels

Crane, EOT, trucks fitted with a crane, lifting and handling equipment

Stagewise / Finished product inspection

IS 3177 :1999

 

Code of practice for electric overhead travelling cranes and gantry cranes other than steel work cranes

 

 

IS 807 : 2006

Design, erection and testing (structural portion) of cranes and hoists — code of practice

 

 

IS 14470 :1997

Cranes -test code and procedures.

 

 

ASME B 30.2 : 2011

Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist)

Gear Boxes

Stagewise / Finished product inspection

IS 7403 :1974

 

Code of practice for selection of standard worm and helical gear boxes

 

 

API 613 : 2003

Special purpose gear units for petroleum, chemical, and gas industry services

Agriculture Tractors / Components relating to tractors

Stagewise / Finished product inspection

IS 11825 :1986

Method of weighment of automotive vehicles

 

AIS 037 : 2004

Procedure for Type approval and Establishing Conformity of Production for Safety Critical Components

 

 

IS 13124 :1993

Reciprocating gas compressors- Technical supply conditions

 

 

API 618 : 1995

Reciprocating Compressors for Petroleum, Chemical, and Gas Industry Services

Turbines

Stagewise / Finished product inspection

IS 1710 : 1989

Specification for pumps — vertical turbine mixed and axial flow, for clear cold water

 

 

IS 15663 : 2006

Design and installation of natural gas pipelines — code of practice

 

 

IS 15665 : 2003

Gas turbines – Vocabulary

 

 

API 612 : 2014

Petroleum, Petrochemical and Natural Gas Industries-Steam Turbines-Special-purpose Applications

Engines

Stagewise / Finished product inspection

/ In service inspection

ISO 3046 Part : 2002

Reciprocating internal combustion engines -- Performance -- Part 1: Declarations of power, fuel and lubricating oil consumptions, and test methods -- Additional requirements for engines for general use

 

 

 

ISO 3046 Part 2 : 1987

Reciprocal internal combustion engines -- Performance -- Part 2: Test methods

 

 

ISO 3046 Part 3 : 2006

Reciprocating internal combustion engines -- Performance -- Part 3: Test measurements

 

 

ISO 3046 Part 4 : 2009

Reciprocating internal combustion engines − Performance − Part 4: Speed governing

 

 

ISO 3046 Part 5 : 2001

Reciprocating internal combustion engines -- Performance -- Part 5: Torsional vibrations

Medical Equipments

Inspection limited to Physical verification and Bill Of Material Verification

Client specific specifications, drawings & QAP/ITP

Client specific specifications, drawings & QAP/ITP.

Customized / tailor made manufactured machineries

a)Manufacture of machinery for the production and use of mechanical power (except aircraft) vehicle and cycle engines DK 29.1

b) Manufacture of other general purpose machinery

c) Manufacture of agricultural and forestry machinery, textile machinery, cement plant machinery, sugar plant machinery, water treatment plant, oil extraction plant, graphite electrodes & equipments, O2/N2 & other plants, rolling     mills

d) Manufacture of machine-tools DK 29.4

e) Manufacture of other special purpose machinery DK 29.5

f) Manufacture of weapons and ammunition DK 29.6

 

 

Stage wise /Finished Product Inspection/ Vendor Assessment

Client specific specifications, drawings & QAP/ITP

Client specific specifications, drawings & QAP/ITP.

 

 

 

 

 

OR any            equivalent standards 

(All  the     above   standards  with latest amendments)

IAF Scope 19

Electrical Equipment

 

 

 

Power transformers

Stagewise / Finished product inspection

IS 2026           (Part 1) / 2012. 

Part 1: General

 

 

IS 2026          (Part 2) / 2010. 

Part 2: Temperature Rise

 

 

IS 2026             (Part 3) / 2009. 

Part 3: Insulation levels, dielectric tests and external clearances in air.

 

 

IS 2026            (Part 4) / 1977. 

Part 4 : Terminal markings, tapings and connections.

 

 

IS 2026                 (Part 5) / 2011. 

Part 5 : Ability to withstand short circuit.

 

 

 

IEC 60076-1 / 2011.            

Part 1 : General 

 

 

IEC 60076-2 / 2011.

Part 2 : Temperature rise for liquid immersed transformers.

 

 

IEC 60076-3 / 2013. 

 Part 3: Insulation levels, dielectric tests and external clearances in air.

 

 

IEC 60076-4 / 2002.   

Part 4 : Guide to the Lightening impulse and switching impulse testing of Power transformers

 

 

IEC 60076-5 / 2006.   

Part 5 : Ability to withstand short circuit

 

 

IS 11171 / 1985                                                                                                                                                                                                                                                                                                                           

Specification for Dry Type Power Transformers

 

 

 

OR any equipment standards ( All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures 

Instrument transformer

 

Stagewise / Finished product inspection

 

IS:2705 (Part 1) /1992

 

Current Transformers  -Specification

Part 1: General Requirements

 

 

IS:2705 (Part 2) /1992

 

Current Transformers  - Specification Part 2: Measuring Current Transformers

 

 

IS:2705 (Part 3) /1992

 

Current Transformers – Specification

Part 3: Protective Current Transformers

 

 

IS:2705 (Part 4) /1992

 

Current Transformers – Specification

Part 4: Protective Current Transformers for special purpose applications

 

 

IEC:61869-2/ 2012

Instrument transformers- Part 2:                         Additional requirements for current transformers

 

 

IS:3156 (Part 1) /1992

 

Voltage Transformers – Specification

Part 1: General Requirements

 

 

IS:3156 (Part 2) / 1992

 

Voltage Transformers – Specification

Part 2: Measuring Voltage  Transformers.

 

 

IS:3156 (Part 3) / 1992

Voltage Transformers – Specification

Part 3 : Measuring Voltage Transformers

 

 

IS:3156 (Part 4) / 1992

 

Voltage Transformers – Specification

Part 4 : Capacitor Voltage  Transformers

 

 

IEC: 61869-3/ 2011.

 

Instrument transformers- Part 3: Additional requirements for Inductive Voltage Transformers 

 

 

 

 

OR any equipment standards  

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures

AC generators

 

Stagewise / Finished product inspection 

IS 13364-1 /1992

AC Generators driven by reciprocating internal combustion engines – Specification.

Part 1 : Alternators rated up to 20KVA.

 

 

IS 13364-2 /1992

AC Generators driven by reciprocating internal combustion engines – Specification.

Part 2 : Alternators rated above 20KVA and up to  1250 KVA.

 

 

IEC 60034 -            1/2004

Rotating Electrical Machines

Part 1: Rating and Performance

 

 

IEC Pub 60341-       1/1970     

Push-button switches – Part 1

General requirements and measuring methods

 

 

ISO: 8528: 2005 (part 1 to 10)

Reciprocating Internal Combustion Engine Driven Alternating Current Generating Sets

 

 

 

OR any equipment standards        

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures

Motors

Stagewise / Finished product inspection

IS 12615: 2018

Energy efficient Induction Motors-Three-phase Squirrel cage

 

 

IEC 60034-2-1/2014

Rotating electrical machines – Part 2-1:  Standard methods for determining losses and efficiency from tests (Excluding machines for traction Vehicles)

 

 

IS 7538     / 1996

Three- phase squirrel cage Induction Motors for Centrifugal Pumps for agricultural applications

 

 

 

 

 

OR any equipment standards        

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures

 

Power cables

 

Stagewise / Finished product inspection

 

IS 7098 Part                   1 / 1988.

 

Specification for Cross  linked  Polyethylene Insulated PVC sheathed cables.

Part 1 :  for working voltages up to and including 1100 Volts

 

 

IS 7098 Part                      

 2 / 2011.

 

Cross linked polyethylene insulated thermoplastic sheathed Cables

Part 2 :  for working voltages from 3.3 KV  up to and including 33KV 

 

 

IS 7098 Part                      

 3 / 1993.

 

Cross linked polyethylene insulated thermoplastic sheathed Cables

Part 3 :  for working voltages from 66 KV up to and including 220 KV 

 

 

IEC 60502 Part               1 / 2004.

 

Power Cables with extruded insulation and their accessories for rated voltages from                  1 kV ( Um = 1.2kV ) up to 30 kV         ( Um = 36 kV) – Part 1 Cables for rated voltages of 1 kV ( Um=1.2 kV) and 3 kV( Um=3.6 kV)

 

 

IEC 60502 Part               2 / 2014.

Power Cables with extruded insulation and their accessories for rated voltages from                  1 kV ( Um = 1.2kV ) up to 30 kV         ( Um = 36 kV) – Part 2 Cables for rated voltages from 6 kV ( Um=7.2 kV) up to 30 kV( Um=36 kV)

 

 

IEC 60840 / 2011 

Power Cables with extruded insulation and their accessories for rated voltages above 30 kV                         ( Um = 36 kV) up to 150 kV             (Um=170 kV) – Test methods and requirements.

 

 

BS 6622 / 2007

Electric Cables: Armoured Cables with thermosetting insulation for rated voltages from 3.8/6.6 kV to 19/33 kV. Requirements and test methods.

 

 

Control cable

 

Stagewise / Finished product inspection

 

BS 5467/1997

/ 2008

 

Electric Cables. Thermosetting insulated, armoured Cables for voltages of  600 / 1000 V and  1900 / 3300V.

 

 

IS 694 / 2010

Polyvinyl Chloride insulated unsheathed and sheathed Cables / Cords with rigid and flexible conductor for rated voltages up to and including 450 / 750 V.

 

 

IS 1554 

Part 1 / 1988 

 

Specification for PVC Insulated (Heavy Duty) Electric Cables.

 

 

 

Part 1:  for working voltages up to and including 1100 Volts.

 

 

IS 1554 

Part 2 / 1988 

 

Specification for PVC Insulated         (Heavy Duty) Electric Cables.

Part 2:  for working voltages from 3.3 kV up to and including 11 kV.

 

 

IEC 60227 Part 1     / 2007 

 

Polyvinyl Chloride insulated Cables of rated voltages up to and including 450 / 750 V- Part 1: General requirements.

 

 

BS 6346  / 1997

Electric Cables. PVC Insulated armoured Cables for for voltages of     600 / 1000 V and  1900 / 3300V.

LV switchgear and control gear

Stagewise / Finished product inspection

IS 13947 

Part 1 / 2004. 

Specification for Low Voltage Switchgear and Control gear –Part 1 : General Rules.

 

 

IEC  60947-1 

/ 2007

Specification for Low Voltage Switchgear and Control gear –Part 1 : General Rules.

OR any equipment standards        ( All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures.

HV Switchgear and control gear

Stagewise / Finished product inspection

IS 12729 / 2004  

Common Specification for High Voltage Switchgear and control gear standards

 

 

IEC 62271 -                 1 / 2007.

High Voltage Switchgear and Control gear Part 1: Common Specifications

 

 

IEC 60694 / 2002

Common Specification for High Voltage Switchgear and control gear standards

OR any equipment standards        

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures.

Circuit breakers

 

Stagewise / Finished product inspection

 

IEC 62271-              100 / 2008. 

 

High Voltage Switchgear and control gear –

Part 100: Alternating Current Circuit Breakers.

 

 

IEC 61633 / 1995

High Voltage Alternating Current  Circuit Breakers – guide for short-circuit and switching test procedures for 

 

 

 

metal -enclosed and dead tank circuit -breakers

 

 

 

OR any equipment standards        

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures.

 

 

Lightning Arresters

Stagewise / Finished product inspection

IS 3070-3 / 1993 (2004)

Lightning arresters for AC System.

Part 3 : Metal Oxide lightning Arresters without Gaps

 

 

IEC 60099-4/ 2001

Part 4 :  Metal Oxide     Surge Arresters without Gaps for AC Systems 

 

 

 

OR any equipment standards        

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures.

Surge arresters

 

Stagewise / Finished product inspection

IS 15086 (Part 1) / 2001

Part 1:  Non linear resistor type gapped Surge Arresters for  AC systems.

 

 

IS 15086 (Part 3) / 2003

Part 3:  Artificial pollution testing of  Surge Arresters

 

 

IEC 60099 -                   1 / 1991

Part 1:  Non linear resistor type gapped Surge Arresters for  AC systems.

 

 

IEC 60099 -                   3 / 1990

Part 3:  Artificial pollution testing of  Surge Arresters

 

 

IEC 60099 -                   5 / 2013

Part 5:  Selection and application recommendations

 

 

 

OR any equipment standards       

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures.

AC Disconnectors (Isolators) & Earthing Switches

Stagewise / Finished product inspection

IS 9921-

Part 1 / 1981

Alternating Current Disconnectors ( Isolators ) and Earthing Switches for Voltages above 1000V. Part 1 : General and Definitions

 

 

IS 9921-

Part 2 / 1982

 

Alternating Current Disconnectors ( Isolators ) and Earthing Switches for Voltages above 1000V. Part 2 : Ratings

 

 

IS 9921-

Part 4 / 1985

Alternating Current Disconnectors ( Isolators ) and Earthing Switches for Voltages above 1000V. Part 4 : Type tests and Routine tests

 

 

 

 

IEC 62271-                102 / 2018

High Voltage Switchgear and Control gear  Part 102 :  Alternating Current Disconnectors  and Earthing Switches

 

 

 

OR any equipment standards        

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures.

Electrical relay for  power system protection

Stagewise / Finished product inspection

 

IS 3231

Part 3 / 1987  

 

Specifications for Electrical relay for power system protection

Part 3 : Requirements for particular group of relays.

 

 

IS 3842

Part 1 / 1967

Part 1. Application guide for electrical  relays for ac Systems.

 

 

IEC 60255-

1 / 2009

Measuring relays and protection equipment – Part 1 :  Common requirements.

 

 

 

 

 

OR any equipment standards       

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures.

Porcelain

Insulators

Bushings

Stagewise / Finished product inspection

IS 2099/1986 

(R2007) 

Specifications for Bushings for alternating voltages above 1000V 

 

 

IS 8603/2008

 

Dimensions for Porcelain transformer bushings for use in heavily polluted atmospheres 

12 / 17.5 KV, 24 KV and 36 KV

 

 

IS 3347-1-2 /1979

Dimensions for Porcelain transformer bushings for use in normal and lightly polluted atmospheres

Part 1 : up to and including 1 KV

Section 2:  Metal Parts

 

 

 

IS 3347-2-1 /1979

 

Dimensions for Porcelain Transformer Bushings for use in lightly polluted atmospheres .  Part 2 : 3.6 kV Bushings,    Section 1: Porcelain Parts.

 

 

IS 3347-5-1 /1979

Dimensions for Porcelain transformer bushings for use in normal and lightly polluted atmospheres

Part 1 : 36 KV Bushings

Section 2:  Metal Parts

 

 

IS 5621/1980

( R2004 ) 

Specification for hollow insulators for use in electrical equipment.

 

 

IEC 60137/2017

 

Insulated bushings for alternating voltages above 1000 V

 

 

 

OR any equipment standards        

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures.

CRGO Lamination

Stagewise / Finished product inspection

IS 3024 : 2015          AMD 1 2017

Specification for Grain Oriented Electrical     Steel  Sheet and Strip 

 

 

 

OR any equipment standards  

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures.

Transformer Oil

Stagewise / Finished product inspection

IS 335/1993 (R 2005)

New Insulating Oil - Specification

 

 

IS 6103 :1971 (R 2001)

Method of test for specific resistive (resistivity) of electrical insulating liquids

 

 

IEC 60296 : 2020

Fluids for electrotechnical applications – Mineral insulating oils for electrical equipment

 

 

IEC 60156 : 2018

Insulating Liquids- Determination of the breakdown Voltage at Power frequency – Test method

 

 

 

 

IEC 60247:2004  

Insulating Liquids - Measurement of relative permittivity, dielectric dissipation factor (tan d) and d.c. resistivity

 

 

IEC 60590:1977  

Determination of the aromatic hydrocarbon content of new mineral insulating oils

 

 

IEC 61619-1-1997  

Insulating liquids – contamination by Polychlorinated Biphenyls (PCBs) – Method of determination by capillary column gas Chromatography

 

 

 

OR any equipment standards        (All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures).

Lighting Fixtures

Stagewise / Finished product inspection

IS: 10322 ( Part 1)/1982 

Specification for Luminaries 

Part 1 : General Requirements 

 

 

IS: 10322 ( Part 4)/1984

Part 4 : Methods of Tests

 

 

IS: 10322 ( Part 5 - Section 1) 2012

Part 5: Particular Requirements 

Section 1: Fixed General Purpose Luminaries 

 

 

IS: 10322 ( Part 5 -       Section 4)  / 1987

Part 5: Particular Requirements 

Section 4 : Portable General Purpose Luminaries

 

 

IS: 10322 ( Part 5 -       Section 5)  / 1987

Part 5: Particular Requirements 

Section 5 : Flood Lights

 

 

IS: 10322 ( Part 5 -       Section 3)  / 2012

Part 5: Particular Requirements 

Section 3 : Luminaries for Road and Street Lighting

 

 

 

OR any equipment standards        

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures).

ACSR Conductors

Stagewise / Finished product inspection

 

IS: 398 Part 1  / 1996

 

ACSR Conductors for overhead transmission purposes. Part 1 : Aluminium stranded conductors 

 

 

IS: 398 Part 2  / 1996

 

ACSR Conductors for overhead transmission purposes.Part 2 : Aluminium  conductors Galvanized steel rein-forced

 

 

IS: 398 Part 3  / 1976 (R1991)

Part 3 : Aluminium  conductors aluminized steel reinforced.

 

 

IS: 398 Part 4  / 1994 (R2014)

 

Part 4:  Aluminium  alloy stranded conductors ( aluminium – magnesium-silicon type 

 

 

IS: 398 Part 5  / 1992 (R2002)

 

Part 5:  Aluminium  conductors – galvanized steel reinforced for extra high voltage ( 400 KV and above ) 

 

 

 

IEC 60888/1987

Zinc-coated steel wires for stranded conductors

 

 

IEC 61089/1997

Amendment 1  -     Round wire concentric lay overhead electrical stranded conductors

 

 

 

OR any equipment standards        

(All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific requirements / Internal Procedures).

IAF Scope 22

Rail Wagan- Wheels & Axles for Railway Coaches & rail wagons.

Stagewise / Finished product inspection

 

RDSO specifications G 72 latest issue, IRS- R-19-2012  for wheels & wheel sets & IRS R-16/1995  for axle reads with latest ammendments

RDSO specifications G 72 latest issue and approved QAP/RDSO approved drawing/RDSO approved check sheet/Client WO, 

RDSO specification IRS- R-19-2012  for wheels & wheel sets & IRS R-16/1995     for axle reads with latest ammendments

IAF Scope 25

Electric Supply 

 

 

 

Production & distribution of Electricity, Electricity Generation, Transmission,     

Distribution and supply.

Stagewise / Finished product inspection

 

National Electricity Act 2003.

 

National Electricity Act 2003 (EA 2003).

 

 

GERC - Gujarat Act No 24 of 2003. PGCIL (Power grid) and State Transmission Line Company (TLCS) rules: 1996

GERC (Gujarat Electricity Regulatory Commission) - Gujarat Act No 24 of 2003

PGCIL (Power grid) and State Transmission Line Company (TLCS) rules : (EA 1996) or any equivalent standards with latest amendments)

Wind Power Project site inspection & supervision                                  

 

Stagewise / Finished product inspection at site such as WTG/DG Commissioning 33KV Electrical Line VCB Unite

GERC (Gujarat Electricity Regulatory Commission) - 2003.

GERC (Gujarat Electricity Regulatory Commission) (EA - 2003).

IAF Scope 26

 

 

 

Gas Supply –NG Pipeline with item 26-A (ii)  

In-service

PNGRB GSR 808(E) dtd.11.11.2009  along with latest amendment

Technical Standards and Specifications including safety standards for Natural Gas Pipelines Regulations, 2009

Gas Supply –CGD with item 26-B (ii)  

In-service

PNGRB’s GSR 612(E) dated 27.08.2008 along with latest amendments, national/ international standards mentioned therein and relevant statutes

PNGRB’s “Technical Standards and Specifications including Safety Standards for City or Local Natural Gas Distribution Network” Regulations, 2008

Gas Supply –CGD with item 26-C (ii)  


 In-service

PNGRB’s Infra/IMP/CGD/1/2013 dated 16.05.2013 along with national/ international standards  mentioned therein and relevant statutes 

PNGRB’s “Integrity Management System for City or Local Natural Gas Distribution Network” Regulations, 2013 

Gas Supply –CGD with item 26-C (i)  


 In-service

PNGRB’s Notification No. Infra/NGPL/1/2010 dated 05.11.2012 along with national/ international standards  mentioned therein and relevant statutes 

 

 

PNGRB´s ”Integrity Management System for Natural Gas pipelines” Regulations 2012 

IAF Scope 27

Water Supply

 

 

 

Steam & Hot Water Supply, Collection, purification and distribution of water

Inspection (Stage / Final)

IS: 456:2000

SP 5:2007 (Part IV)

Plain & Reinforced concrete National Building Code of India 

 

IS : 516:1959

Method of test for strength of concrete

 

IS : 816:1969

Code of practice for use of Metal Arc Welding for General Construction in mild steel. 

 

 

IS : 13916:1994

Installation of Glass Fiberetnforced  Plastic (GRP) Piping System Welding & Brazing specifications.

 

 

ASME-Sec

IX:2019

Welding Procedure and Performance qualification

 

 

 

IAF Scope 28

 

 

 

Building pre-construction Process

Review of Design, Drawings, relevant Project documents and Site Survey

 

Customer Specified Methods

Building Construction Process

Stage-wise and Final Inspection and Review of Quality, Quantity and Construction Process

 

Customer Specified QAP, Central Public Works Department (CPWD) manuals, relevant National and International Codes of Practice etc.

 

 

 

 

Building Commissioning Process

 

Stage-wise and Final Inspection and review of Building components after completion of construction.

In-service inspection and Post-construction audit of building components. Witnessing of Geotechnical investigations.

Inspections (Stage/Final)

 

 

Building Post Construction Process

 

 

 

Roads – Quality Audit pre-construction Process

 

 

 

Roads – Quality Audit Construction Process

 

 

 

  • Embankment/Sub-grade

 

Section 300-2013

MORT&H Specifications -5th revision

  • Density/Field Moisture

 

IS 2720(8) -1983

 

Determination of water content -dry density relation using heavy compaction

  • Granular Sub-base

 

Clause 401-2013

MORT&H Specifications -5th revision

  • Wet Mix Macadam

 

Clause 406-2013

MORT&H Specifications -5th revision

  • Dense Bituminous Macadam

 

Clause 505-2013

MORT&H Specifications -5th revision

  • Bituminous Concrete

 

Clause 507-2013

MORT&H Specifications -5th revision

  • Dry Lean Concrete

 

Clause 601-2013

MORT&H Specifications -5th revision

  • Pavement Quality Concrete

 

Clause 602-2013

MORT&H Specifications -5th revision

Roads-Quality Audit Post Construction Process

Thickness of Crust, Quality of Wearing course

 

Customer specified Methods, related IS and MORT&H specifications

Bridges- Construction/Quality control Supervision

Inspections (Stage/Final)

 

 

 

  • Well Foundations

 

Section 1200 -2013

MORT&H Specifications -5th revision

 

 

IRC 78:2014

Standard Specifications and Code of Practice for Road Bridges

  • Stone /Concrete Block Masonary

 

Section 1400-2013

MORT&H Specifications -5th revision

 

 

IRC 78:2014

Standard Specifications and Code of Practice for Road Bridges

  • Formwork

 

Section 1500-2013

MORT&H Specifications -5th revision

 

 

IRC 78:2014

Standard Specifications and Code of Practice for Road Bridges

  • Pre-stressing

 

Section 1800-2013

MORT&H Specifications -5th revision

 

 

IRC 78:2014

Standard Specifications and Code of Practice for Road Bridges

  • Open Foundation

 

Section 2100-2013

MORT&H Specifications -5th revision

 

 

IRC 78:2014

Standard Specifications and Code of Practice for Road Bridges

  • Sub-structure

 

Section 2200-2013

MORT&H Specifications -5th revision

 

 

IRC 78:2014

Standard Specifications and Code of Practice for Road Bridges

  • Super-structure

 

Section 2300-2013

MORT&H Specifications -5th revision

 

 

IRC 78:2014

Standard Specifications and Code of Practice for Road Bridges

 
The following offices of SGS India Pvt. Ltd. is/are included under accreditation

S.No

Office(s)

Address

Key activities performed

  1.  
Main office

SGS House, 4B, Adi Shankaracharya Marg, Powai Road, Vikhroli (West), Mumbai - 400083

Top management functions, quality management system functions, administration & accounts, other key activities as applicable to main office.

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

  1.  

Branch office

Ecospace, Block - 3 A, 2nd Floor, East Wing, Premises IIF/11, Action Area - II, Rajarhat, New Town, Kolkata - 700156

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

  1.  

Branch office

Sumel 2, Office No 201, 202, 208, 209, 210 on 2nd Floor, SG Highway, Ahmedabad 380054

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

  1.  

Branch office

SGS India Pvt. Ltd., Door No. 45-56-3/5/1,1st Lane, Narasimha Nagar, NH5, Visakhapatnam - -530 024

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

  1.  

Branch office

R-12,1stFloor, Laxmi Nagar, Nagpur- 440022

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

  1.  

Branch office

Plot No - 160 & 95,Mouze No 169, Khata No. 12At-Tilakraydih, P.O Govindpur, Dhanbad- 828109

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

  1.  

Branch office

226, Udyog Vihar, Phase - I, Gurugram

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

  1.  

Branch office

NITCO BIZ PARK, 5th Floor, Plot No. C/19, Road # 19,Wagle Industrial Estate, MIDC, Thane (West ) - 400 604, Maharashtra, India

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

  1.  

Barbil
(Operations office)

At-Ramnagar,Sub-Jail Road,P.O.- Barbil,ist.-Keonjhar ,Odisha-758035

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

 Print 
 Close 
Close Search Window