NABCB Accredited Inspection Bodies
National Institute of Wind Energy
Address 657, 1A2, Velachery Tambaram Main Road, Pallikaranai, Chennai – 600100, Tamil Nadu, India
Contact Person Mr. S A Mathew
Designation Director & Division Head
Tel +91 44 22463992
Fax
Email ID mathew@niwe.res.in
Website https://niwe.res.in
Accreditation Cert. No.. IB 126
Valid From 26 April 2024
Valid Upto 25 April 2027
Accreditation Standard ISO/IEC 17020:2012
Type of Inspection Body Type A

IAF Scope /

Field of Inspection and Specific Item(s)

Stage and Range of Inspection(s)

Inspection Requirement(s)

Standards / Regulations / Methods / Procedures

Number identification with year of publication

Title

IAF Scope 18

Machinery and Equipment

 

 

 

Wind Turbine Tower

Final Inspection

IEC 61400 – 1: 2014

Wind Turbine – Part 1: Design Requirements

 

 

IS/IEC 61400 – 22:2010

Wind Turbine Conformity Testing and Certification

 

 

IEC 61400 – 6: 2020

Wind Energy Generation Systems – Part 6: Tower and Foundation design requirements

 

 

IS 15326 – 2: 2022

Quality Requirements for fusion welding of metallic materials – Part 2 – comprehensive quality requirements 

Wind Turbine Hub and Nacelle Assembly

Final Inspection

IEC 61400 – 1: 2014

Wind Turbine – Part 1: Design Requirements

 

 

IS/IEC 61400 – 22:2010

Wind Turbine Conformity Testing and Certification

Wind Turbine Rotor Blades

Final Inspection

IEC 61400 – 1: 2014

Wind Turbine – Part 1: Design Requirements

 

 

IS/IEC 61400 – 22:2010

Wind Turbine Conformity Testing and Certification

 

 

IEC 61400 – 5: 2020

Wind Energy Generation Systems –  Part 5: Wind Turbine Blades

 

 

IAF Scope 19

Electrical and Optical Equipment

 

 

 

Generators

Final Inspection

IEC 60034 – 1: 2022

Rotating electrical machines – Part 1: Rating and Performance

 

 

IS 4029: 2010

Guide for testing three phase induction motors

Power Transformers

Final Inspection

IS 2026 (Part 1): 2011

Power Transformer Part 1: General

 

 

IS 2026 (Part 2): 2010

Power Transformer Part 2: Temperature Rise

 

 

IS 2026 (Part 3): 2018

Power Transformer Part 3: Insulation levels, Dielectric tests and External Clearances in air

 

 

IS 2026 (Part 4): 1977

Power Transformer Part 4: Terminal markings, Tapping’s and Connections

 

 

IS 2026 (Part 5): 2011

Power Transformer Part 5: Ability to withstand short circuit

 

 

IS 2026 (Part 16): 2018

Power transformers: Part 16 transformers for wind turbine applications

 

 

IS 335: 2018

New insulating oils –Specification

Power Converters

Final Inspection

IEC 62477 – 1: 2022

Safety requirements for power electronic converter systems and equipment – Part 1: General

Wind Turbines installed at site

Final Inspection

NIWE / QAP / WT / 01 Rev: 00, Dated: 04.05.2023

Inspection of Wind Turbines

Location Address Key activities performed
Pune(Main Office)

Office No. 5 & 6 Clover Metropole, Near Clover Highlands, Pisoli – NIBM Road, Kondhwa, Pune, Maharashtra – 411048, India

Top Management functions, Quality Management System functions, administration & accounts, other key activities.

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.
 Print 
 Close 
Close Search Window