NABCB Accredited Inspection Bodies
TUV India Pvt. Ltd., Industrial Services Division
Address 801, Raheja Plaza, LBS Marg, Ghatkopar (W), Mumbai – 400086
Contact Person Person 1 Mr. Sandeep Deshpande
Designation Associate VP – Ind. Services (India) & Operations (Mumbai)
Tel 022 – 67824100/1, 66477000
Mobile +91-9902044997
Fax 022 – 25791301, 66477009
Email ID sandeep@tuv-nord.com
Website www.tuvindia.co.in
Accreditation Cert. No.. IB 015
Valid From 18 April 2013
Valid Upto 17 Jul 2028
Accreditation Standard ISO/IEC 17020:2012
Type of Inspection Body Type A
Scopes of Accreditation

IAF Scope /

Field of Inspection and Specific Item(s)

Stage and Range of Inspection(s)

Inspection Requirement(s)

Standards / Regulations / Methods / Procedures

Number identification with year of publication

Title

IAF Scope 03

Food Products, Beverages and Tobacco

 

 

 

Food & food products

Inspection of a lot, Inspection of processes, sampling, In-process and Final Inspection

IS: 2491:2013 Reaffirmed:2018

Food Hygiene General Principles Codes of Practice

 

 

Is 1165:2002 Reaffirmed:2018

Milk Powder Specification

 

 

IS: 1166:1986 Reaffirmed:2018

Specification for condensed milk, partly skimmed milk and skimmed condensed milk

 

 

IS: 1656:2007 Reaffirmed:2018

Milk-cereal based complementary foods Specification

 

 

IS: 11536:2007 Reaffirmed:2012

Processed-cereal based complementary foods Specification

 

 

IS: 11546:2012 Reaffirmed:2018

Milk and milk products Guidance on Sampling

 

 

IS:13334 Part 1:2014 Reaffirmed:2019

Skimmed milk powder Specification Part 1 Standard Grade

 

 

IS:13334 Part 2 :2014 Reaffirmed:2019

Skimmed milk powder Specification Part 1 Extra Grade

 

 

IS 14433:2007 Reaffirmed:2018

Infant milk substitutes Specification

 

 

IS 15757:2007 Reaffirmed:2018

Follow-up formula complementary foods Specification

 

 

IS 14543: 2016

Packaged drinking water

 

 

IS 13428:2005 Reaffirmed:2018

Packaged Natural Mineral Water

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 04

Textiles and Textile Products

 

 

 

All Textile Products

Final Quality Inspection of Lot, Final Inspection/ Audit/ Vendor Evaluation/ Gap reporting

ANSI/ASQ Z1.4 2003 (R2018) or ISO 2859 or equivalent to the above standard

Sampling procedures for inspection by attributes — Part 1: Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection

Textiles

Final Quality Inspection of Lot, Final Inspection/ Audit/ Vendor Evaluation/

 

IS 15138: 2010

Textiles – Jute Bags for Packing 50 Kg Sugar

 

 

IS 16186: 2014

Textiles – Light Weight Jute Sacking Bags for Packing 50 Kg Food grains

 

 

IS 1943: 1995

Textiles—A—Twill Jute Bags

 

 

IS 2566:1993

Textiles—B—Twill Jute Bags for Packing Food grains

 

 

IS 11652: 2017

Textiles – High Density Polyethylene (HDPE) Polypropylene PP Woven Sacks for Packaging of 50 Kg Cement

 

 

IS 14252: 2015

Textiles – High Density Polyethylene (HDPE) / Polypropylene (PP) Woven Sack for Filling Sand

 

 

IS 14887: 2014

Textiles – High Density Polyethylene (HDPE) Polypropylene (PP) Woven Sacks for Packaging of 50 Kg Food Grains

 

 

IS 14968: 2015

Textiles – High Density Polyethylene (HDPE) Polypropylene PP Woven Sacks for Packing 50 Kg/ 25 Kg Sugar

 

 

IS 16187: 2014

Textiles – High Density Polyethylene (HDPE) Polypropylene PP Leno Woven Sacks for Packaging and Storage of Fruits and Vegetables

 

 

IS 16208: 2015

Textiles – High Density Polyethylene (HDPE) Polypropylene (PP) Woven Sacks for Packaging 10 Kg, 15 Kg, 20 Kg, 25 Kg and 30 Kg Food grains

 

 

IS 16703: 2017

Textiles – High Density Polyethylene (HDPE) Polypropylene PP Woven Sacks for Packaging of 25 Kg Polymer Materials

 

 

IS 5405: 2019

Sanitary Napkins

 

 

IS 17263: 2022

Textiles–Polyester Staple Fibre

 

 

IS 13489: 2000

Textiles – Bed Mattress

Mask for Nose and Mouth Protection

Final Quality Inspection of Lot, Final Inspection/ Audit/ Vendor Evaluation/ Gap reporting

IS 9473:2002

Respiratory Protective Devices – Filtering Half Masks to Protect Against Particles

Medical Textiles

Final Quality Inspection of Lot, Final Inspection/ Audit/ Vendor Evaluation/ Gap reporting

 

 

 

IS 17630: 2021

Medical Textiles — Bedsheet and Pillow Cover – Specification

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 12

Chemicals, Chemical Products and Fibres

 

 

 

Chemical and Chemical Products

Final Inspection of Lot, Quality Inspection of manufacturing process as per BIS requirements, Witness of Sample Testing, Review of Test Reports

Applicable BIS Scheme requirements for Factory Inspection” for following products:

 

 

IS 252:2013

Caustic Soda –Specification

 

 

IS 10116: 2015

Boric Acid – Specification

 

 

IS 15573: 2018

Poly Aluminum Chloride

 

 

IS 695: 2020

Acetic Acid

 

 

IS 2833:2019

Aniline

 

 

IS 517: 2020

Methanol

 

 

 

 

 

IS 5158: 1987

Specification for Phthalic Anhydride, Technical

 

 

IS 8058: 2018

Pyridine

 

 

IS 16113: 2013

Gamma Picoline

 

 

IS 16112: 2013

Beta Picoline

 

 

IS 12084: 2018

Morpholine

 

 

IS 297: 2001

Sodium Sulphide, Technical

 

 

IS 7129: 1992

Potassium Carbonate, Anhydrous

 

 

IS 170: 2004

Acetone

 

 

IS 4581: 1978

Phosphorous Trichloride, pure and Analytical Reagent

 

 

IS 11744:1986

Phosphorous Pentachloride, Technical

 

 

IS 11657:1986

Phosphorous Oxychloride, Technical

 

 

IS 2080:1980

Stabilized Hydrogen Peroxide

 

 

IS 3205:1984

Precipitated Barium Carbonate, Technical

 

 

IS 12928:1990

Precipitated Barium for Ceramic and Glass Industry

 

 

IS 4505:2015

Sodium Formaldehyde Sulphoxylate

 

 

IS 6100:1984

Sodium Tripolyphosphate, Anhydrous, Technical

 

 

IS 14709:1999

n- Butyl Acrylate

 

 

IS 336:1973

Ether

 

 

IS 5295:1985

Ethylene Glycol

 

 

IS 537:2011

Toluene

 

 

IS 15030:2001

Terephthalic Acid

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 17

Basic Metals and Fabricated Metal Products

 

 

 

Basic metals– Ferrous & Non Ferrous alloys, Steels in the shape of Billets, Blooms, Slabs.Raw materials in the form of plates, structural shapes, Castings, Cast Steel Pipes Forgings, pipes, rolled sections, Bars in

Stagewise/ Final inspection

ASTM Section 1

Iron & Steel Products

different shapes, Line pipes, tubes, flanges,

 

 

 

 

 

Fittings, Fasteners, metallic & non-metallic Gaskets,

Instrumentation Fittings. Welding consumables

 

 

 

 

Volume 01.02 :2019

Ferrous Castings; Ferroalloys

 

 

Volume 01.01 :2019

Steel–Piping, Tubing, Fittings

 

 

Volume 01.03 :2019

Steel–Plate, Sheet, Strip, Wire; Stainless Steel Bar

 

 

Volume 01.04 :2019

Steel–Structural, Reinforcing, Pressure Vessel, Railway

 

 

Volume 01.05 :2019

Steel–Bars, Forgings, Bearing, Chain, Tool

 

 

Volume 01.06 :2019

Coated Steel Products

 

 

ASME section II Part

A:2019

Ferrous Material Specifications

 

 

ASME section II Part B:2019

Non-Ferrous Material Specifications

 

 

IS 2062:2011

Specification for structural Steel

 

 

IS 1239:2011

Steel tubes & Tubulars

 

 

IS 3589:2001

Steel Pipes for water & sewage

 

 

ASME Section II Part C:2019

Specifications for welding rods, electrodes and filler metals

Pressurized & Unpressurized Vessels, Strainers, Steam Traps, Expansion Bellows,

Design appraisal, Stagewise/

Final inspection

ASME Section I:2019

Rules for Construction of Power Boilers

Flame arrestors, Demister Pads, Tower internals, Flare stacks, Chimneys, Gas cylinders

 

 

 

 

 

Section III:2019

Rules for Construction of Nuclear Facility Components

 

 

Section IV:2019

Rules for Construction of Heating Boilers

 

 

Section V:2019

Non-destructive Examination

 

 

Section VIII:2019

Rules for Construction of Pressure Vessels

• Division 1

• Division 2 — Alternative Rules

 

 

 

• Division 3 — Alternative Rules for Construction of High-Pressure Vessels

 

 

Section IX:2019

Welding, Brazing, and Fusing Qualifications

 

 

Section X:2019

Fiber-Reinforced Plastic Pressure Vessels

 

 

IS 2825:2017

Code for unfired pressure vessels

 

 

PD 5500:2019

Specification for unfired fusion welded pressure Vessels

Unfired Pressure Vessel Water tube boilers Standards Shell boilers

 

 

EN 13445:2018 EN 12952:2016 EN 12953:2012 EN 14359:2017

Gas-loaded accumulators for fluid power applications

 

 

AD 2000-Till 2019

European Pressure Equipment Directive

Heat Exchangers

Design appraisal/ Stagewise/ Final inspection

TEMA 9th Edition

Tubular exchangers manufacturers association

Storage Tanks

Design appraisal/ Stagewise/ Final inspection

API 620:2018

Design & construction of large welded low-pressure tanks

 

 

API 650:2018

Welded tanks for Oil Storage

 

 

API 653:2018

Tank Inspection, Repair, Alteration, and Reconstruction

Welded Structures for Onshore and Offshore Purpose

Design appraisal, Stagewise/ Final inspection

AWS D 1.1:2015

Structural welding code – Steel

Piping fabrication, installation & testing

Design appraisal, Stagewise/ Final inspection

ASME B 31.1:2018

Power Piping

 

 

ASME B 31.3:2018 (Or equivalent to the

Process Piping (Pipelines)

 

 

above standards e.g. EN 13480, API 1104)

 

 

 

 

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 18

Machinery and Equipment

 

 

 

Turbines

Stagewise/ Final inspection

API 616:2011

Gas Turbines for Refinery Services

 

 

API 611:2014

General Purpose Steam Turbines for Petroleum, Chemical, and Gas Industry Services

 

 

API 612:2014

Petroleum, Petrochemical and Natural Gas industries

– Steam Turbines

– Special Purpose Applications.

Centrifugal and Reciprocating Pumps

Design appraisal, Stagewise/ Final inspection

API 610:2011 & IS 5120:1977

Centrifugal Pumps

 

 

API 674:2016

Reciprocating pumps

 

 

API 675:2014

Positive Metering pumps

Compressors

Stagewise/

Final inspection

API 618:2016

Reciprocating compressors

Axial fans, Centrifugal Fans, Blowers

Design appraisal, Stagewise/ Final inspection

AMCA 210:2010

Testing of Fans

Gear boxes

Design appraisal, Stagewise / Final inspection

API 613:2007

Special Purpose Gear Units for Refinery Services

 

 

API 677:2016

General Purpose Gear Units for Refineries Services

Calibration of measuring & testing equipment

Final inspection

IS 1828 Part I:2015

Calibration of UTM

 

 

IS 1586 Part II:2012

Calibration of Rockwell Hardness testing machine

 

 

IS 3766:1977

Calibration of charpy impact testing machine

Dryer units

Stagewise/

Final inspection

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

Domestic appliances

(Electric & non-electric)

Final inspection

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

HVAC systems, 

Stagewise/

Final inspection

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

Diesel Generators 

Final inspection

ISO 8528-1/ISO 3046-1-2018

Reciprocating IC engine driven alternating current generating sets/Performance testing of DG sets

Industrial mixers, 

Agitators

Design appraisal, Stagewise/Final inspection 

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

Cooling tower package

Stagewise/

Final inspection 

BS ISO 16345:2014

Water-cooling towers — Testing and rating of thermal performance

All types of Cranes, Other lifting equipment and accessories

Design appraisal, Stagewise/ Final inspection

IS 14470:1997, Reaffirmed:2013

Cranes – Test code & procedures,

 

 

FEM 1.001:1998

Rules for the Design of Hoisting Appliances

Conveyor systems, Machine Tools, 

Stagewise/

Final inspection 

 

Approved drawings, datasheets, PO specs, PR, Mfr’s catalogue

FRP pressure vessels & tanks

Design appraisal, Stagewise/

Final inspection

BS 4994:1987

specification for the design and construction of vessels and storage tanks in reinforced plastics

Rotors 

Stagewise/

Final inspection

ISO 1940-1:2003

Mechanical vibration – Balance quality requirements for rotors in a constant (Rigid)state

Gratings

Stagewise/

Final inspection

ANSI/NAAMM MBG531:2009

Metal Bar Grating Manual

All types of valves

Design appraisal, Stagewise/

Final inspection

API SPEC 6D:2017

API 526:2018

API 527:2014

ANSI/API STD

594:2017

API 598:2016

ANSI/API599:2013

ANSI/API 600:2015

API 602:2015

ANSI/API603:2018

Inspection and testing of valves

 

 

ANSI/API 607:2016

API 609;2016

API 6FA:2018

ANSI/API574:2016

 

 

 

ANSI/API 576:2017

ANSI/API 608:2012 Or equivalent to the above standards

 

 

Design Appraisal

ASME B 16.34, EN 12516:2017

Valves Flanged, Threaded and Welding End

Heaters 

Design appraisal, Stagewise/

Final inspection

API 560:2016 Or equivalent to the above standards

Fired Heaters for General Refinery Service

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 19

Electrical and Optical Equipment

 

 

 

Insulated wires & cables

Stage & Final inspection

IS 7098 Part 1:1988, 2:2011 and 3:1993

Specification For Cross-linked Polyethylene Insulated PVC Sheathed Cables

 

 

IS 694:2010 Reaffirmed:2020

PVC insulated cables for working. Voltages up to and including. 1100 volts

 

 

IS 694:2010 Reaffirmed:2015

PVC insulated 450/750V electric cables

 

 

IEC-60227-1, 2, 3, 4, 6 & 5

PVC insulated (heavy duty) electric cables

 

 

IS 1554 Part 1 & 2:1988

Reaffirmed:2015

Aerial Bunched Cables for working Voltages upto and including 1100 Volts

 

 

IS 14255:1995 Reaffirmed:2015

Power cables with extruded insulation and their accessories for rated voltages

 

 

IEC 60502-1:2021

from 1 KV (Um = 1,2 KV) up to 30 KV (Um = 36 KV) – Part 1: Cables for rated voltages of 1 KV (Um = 1,2 KV) and 3 KV (Um = 3,6 KV)

 

 

IEC 60502-2:2014, AMD1:2024

Power cables with extruded insulation and their accessories for rated voltages from 1 KV (Um = 1,2 KV) up to 30 KV (Um = 36 KV) – Part 2: Cables for rated voltages from 6 KV (Um = 7,2 KV) up to 30 KV (Um = 36 KV)

 

 

IEC 60840:2020, AMD1:2023

Power cables with extruded insulation and their accessories for rated voltages above 30 KV (Um= 36 KV) up to 150 KV (Um = 170 KV) – Test methods and requirements

 

 

IEC 60840:2020, AMD1:2023 

Power cables with extruded insulation and their accessories for rated voltages above 30 KV (Um= 36 KV) up to 150 KV (Um = 170 KV) – Test methods and requirements

 

 

AS/NZS IEC 60840:2020

Power cables with extruded insulation and their accessories for rated voltages above 30 KV (Um = 36 KV) up to 150 KV (Um = 170 KV) – Test methods and requirements

 

 

AS/NZS : 1429:2006

Electric cables – Polymeric insulated, Part 1: For working voltages 1.9/3.3 (3.6) KV up to and including 19/33 (36) KV

Electric cables – Polymeric insulated, Part 2: For working voltages above 19/33 (36) KV up to and including 87/150 (170) KV

 

 

AS/NZS : 5000.1:2005

Electric cables – Polymeric insulated, Part 1: For working voltages up to and including 0.6/1 (1.2) KV

 

 

BS : 6724:2016

Electric cables. Thermosetting insulated, armoured cables of rated voltages of 600/1 000 V and 1 900/3 300 V for fixed installations, having low emission of smoke and corrosive gases when affected by fire.

 

 

 

 

 

BS : 7846:2015

Electric cables. Thermosetting insulated, armoured, fire-resistant cables of rated voltage 600/1 000 V for fixed installations, having low emission of smoke and corrosive gases when affected by fire.

 

 

BS : 6622:2007

Electric cables. Armoured cables with thermosetting insulation for rated voltages from 3.8/6.6 KV to 19/33 KV Requirements and test methods

 

 

BS : 5467:2016

Electric cables. Thermosetting insulated, armoured cables of rated voltages of 600/1 000 V

 

 

 

and 1 900/3 300 V for fixed installations.

 

 

BS : 50525

Part1 covers General requirements

Part 2 covers cables for General applications

Part 3 covers cables with Special fire performance

Including all Sub Parts

Electric cables

Low voltage energy cables of rated voltages up to and including 450/750 V (U0/U):  Requirements for rigid and flexible energy cables of rated voltages U0/U up to and including 450/750 V a.c., used in power installations and with domestic and industrial appliances and equipment. 

 

 

BS 6004:2012+A1:2020

Electric cables. PVC insulated and PVC sheathed cables for voltages up to and including 300/500 V, for electric power and lighting

 

 

BS : 7835:2007

Electric cables. Armoured cables with thermosetting insulation for rated voltages from 3.8/6.6 KV to 19/33 KV having low emission of smoke and

 

 

 

corrosive gases when affected by fire. Requirements and test methods

 

 

BS : 7870

Including all Sub Parts

LV and MV (Medium Voltage cables) polymeric insulated cables for use by distribution and generation utilities.

 

 

BS/EN : 50618:2014

Electric cables for photovoltaic systems

 

 

IEC : 62930:2017

Electric cables for photovoltaic systems with a voltage rating of 1,5 kV DC

 

 

BS 7629-1:2015+A1:2019

Electric cables. Specification for 300/500 V fire resistant, screened, fixed installation cables having low emission of smoke and corrosive gases when affected by fire – Multicore cables

 

 

BS 7211:2012+A1:2020

Thermosetting insulated and thermoplastic sheathed cables for voltages up to and including 450/750 V for electric power and lighting and having low emission

 

 

 

of smoke and corrosive gases when affected by fire

 

 

BS 7884:1997

Specification for copper and copper-cadmium stranded conductors for overhead electric

 

 

 

traction and power transmission systems

 

 

BS 7889:2012

Electric cables. Thermosetting insulated, non-armoured cables with a voltage of 600/1 000 V, for fixed installations

 

 

BS 7917:1999

Elastomer insulated fire resistant (limited circuit integrity) cables for fixed wiring in ships and on mobile and fixed offshore units. Requirements and test methods

 

 

BS ISO 7919-3:2009 + A1:2017

Electric cables. Flexible cables rated up to 450/750V, for use with appliances and equipment intended for industrial and similar environments

 

 

 

Reactors

 

IS 5553 Part 1:1989, 2:1990, 3:1990,

4:1989, 5:1989,

6:1990, 7:1990 and

8:1990

Shunt reactors, Current limiting and neutral earthing reactors, Damping reactors, Tuning  Reactor, Earthing

Transformers (Neutral couplers )

Arc suppression reactors  Smoothing reactors

Relays

 

IS 3231:1986 Reaffirmed:2014

Specification for electrical relays for power system protection

Thermocouple Extension & Compensating Cable

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 584:1982

Thermocouple Extension & Compensating Cable

Aluminium Conductor for Overhead Transmission Purpose (HTLS)

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 398 (Part 1):1996

(R:2018)

Aluminium conductors for overhead transmission purposes – Part 1 Aluminium stranded conductors

 

 

IS 398 (Part 2):1996 (R:2018)

Aluminium conductors for overhead transmission purposes – Part 2 Aluminium conductors, galvanized steel reinforced

 

 

IS 398 (Part 3):1976 (R:2019)

Aluminium conductors for overhead transmission purposes – Part 3 Aluminium conductors, aluminized steel reinforced

 

 

 

 

IS 398 (Part 4):1976 (R:2019)

Aluminium conductors for overhead transmission purposes – Part 4 Aluminium conductors, aluminized steel reinforced

 

 

IS 398 (Part 5):1992 (R:2018)

Aluminium conductors for overhead transmission purposes – Part 5 Aluminium conductors – galvanized steel reinforced for extra high voltage (400 KV and above)

 

 

IS 398 (Part 6):2021

Aluminium Conductors For Overhead Transmission Purposes – Part 6 High conductivity aluminium alloy stranded conductors

 

 

Technical Specification of Power Transmission Utility

State Transmission Utilities (GETCO, DTL, MPMKVVCL etc.) Technical Specification and

PGCIL Technical Specification

SECTION-VII (VOLUME-II)

Elastomer Insulated Cables

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS-9968 (Part 1):1988 (R:2000)

Elastomer Insulated Cable for Working Voltage Up to Including 1100 Volts

 

 

IS-9968 (Part 2):1988 (R:2000)

Elastomer Insulated Cable for Working Voltage From 3.3KV Up to Including 33KV

Elastomer Insulated Flexible Cables for Use in Mines

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 14494: 2019

The standard for the requirements of flexible cables of the following voltage grades for use in coal mines, quarries and other miscellaneous mines: 1.1, 3.3. 3.8/6.6 and 6.35/11 KV

Specification for Shot Firing Cables

(for use other

than in shafts)

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS: 5950:1984

shot firing cables for use other than in shafts

Type-I Twin cable (Parallel twin) for single-shot and multi-shot firing.

Type-II Single-core cable for multi-shot firing.

Transformers

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 60076 SER

Power Transformers (All Parts) including Technical Specifications.

 

 

IEC 60726:1982

Power transformers

 

 

IS:2026 Part 1:2011, 2:2010, 3:2009,

4:1977, 5:2011,

6:2017, 7:2009 to

8:2009

Power Transformers

 

 

IS:1180 Part 1 & 2:2014

Outdoor type three-phase distribution transformers

 

 

IS 12021:2015

Control Transformers for Switchgear and Control gear for Voltages not Exceeding 1000 V ac

 

 

IEC 60296: 2003

IS 11171:2016

(Reaffirmed)

Dry Type power transformers

 

 

IEC 60044 part

1, 2, 5, 6

Fluids for electro technical applications-Unused mineral insulating oils for transformers

 

 

IEC 61869-1:2007

Additional requirements for current transformers Instrument transformers – Part 1: General requirements

 

 

IEC 61869-2:2012

Instrument transformers – Part 2: Additional requirements for current transformers

 

 

IEC 61869-3:2011

Instrument transformers – Part 3: Additional requirements for current transformers

 

 

IEC 61869-5:2011

Instrument transformers – Part 5: Additional requirements for current transformers

 

 

IEC 61869-6:2011

Instrument transformers – Part 6: Additional general requirements for low-power instrument transformers

Instrument Transformer

Current Transformer, Voltage Transformer, Capacitive & Inductive Voltage Transformer,

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS:2705:1992, IEC:61869, IS 2705,

IS 16227 & IS:3156:1992

IS 3156 Part 1 to

4:1992

(Reaffirmed:2012)

Current Transformer, Voltage Transformer, Capacitive & Inductive Voltage Transformer

Isolation Transformer

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS:12290:2013

Series isolating transformers for use in airport lighting systems.

Manual on Transformers

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

CBIP Publication No. 317

Amendments issued in July 2019 – III

CBIP Manual on Transformers

CRGO Lamination

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

 IS 3024 : 2015

(Rev. 2021)

Specification for Grain Oriented Electrical Steel Sheet and Strip OR any equipment standards (All the above standards with latest amendments) Other applicable National / International Specifications / standards / Client specific

 

 

 

requirements / Internal Procedures.

Transformer Oil

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 335: 2018

New Insulating Oil – Specification

Insulating Liquids

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 60296: 2020

Fluids for electro technical applications – Mineral insulating oils for electrical equipment

 

 

IEC 60156: 2018

Insulating Liquids- Determination of frequency – Test method

 

 

IEC 60247:2004

Insulating Liquids – Measurement of relative permittivity, dielectric dissipation factor (tan d) and d.c. resistivity

 

 

IEC 60590:1977

Determination of the aromatic hydrocarbon content of new mineral insulating oils

 

 

IS 16082 : 2013/ IEC 61619 : 1997 Reviewed In : 2018

Insulating liquids – contamination by Polychlorinated Biphenyls (PCBs) – Method of determination by capillary column gas Chromatography

 

 

IS 6855 : 2023 IEC 60475:2022

Method of sampling insulating liquids

 

 

IEC 62535:2008

Insulating liquids – Test method for detection of potentially corrosive sulphur in used and unused insulating oil

 

 

IEC 61125:2018

Insulating liquids – Test methods for oxidation stability – Test method for evaluating the oxidation stability of insulating liquids in the delivered state

 

Electric Motors

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 12615:2018

Energy efficient Induction Motors Three-phase Squirrel cage

HT & LT motors

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 4029:2010, Reaffirmed:2016

Guide for Testing Three Phase Induction Motors

 

 

IS 7538: 1996

Three-phase squirrel cage induction motors for centrifugal pumps for agricultural applications

 

 

IS 325: 1996

GUIDE FOR TESTING THREE PHASE INDUCTION MOTORS

 

 

IEC 60034:2024 SER

& Equivalent IS 15999 Standards

Rotating Electrical Machines (Series)

Title as per respective standards

 

 

IEC 60034:2017

Rotating Electrical machines

 

 

BS 2613:1970

The Electrical Performance of Rotating Electrical Machinery

 

 

IS 9283: 2013

(R:2018)

Motors for Submersible Pump sets

Motors Starters

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 12661:2005

High voltage motor-starter: Direction-line (full voltage) ac starters

LT & HT Switchgears

Control Panels, Switch Gears, electricity distribution and control apparatus e.g. Switchgear (HT/LT), Panels, PCC, MCC, APFC VFD, Flameproof & Weather proof equipment, Junction Boxes, Lighting, equipment, Push Button Stations and Electrical lamps, Outdoor units and IPMS for Telecom sector, Pressure Gauges, earthing, electrical resistance, Flameproof enclosure, luminaires and electrical installation classification

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 8623-1:1993

 

IS 8623-1:1993

(Sup. By IS/IEC 61439-2: 2011)

Low-Voltage Switchgear and Control Gear Assemblies, Part 1: Requirements for Type-Tested and Partially Type-Tested Assemblies

Low-Voltage Switchgear and

Control gear Assemblies

Switch Gear

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 732: 1989

Code of Practice for Electrical Wiring Installations

 

 

IEC 62790: 2021

Junction boxes for photovoltaic modules – Safety requirements and tests

 

 

IEC 61439-1&2: 2021

Part 1: General rules

Part 2: Power switchgear and controlgear assemblies

Low-voltage switchgear and control gear assemblies –

Part 1: General rules

Part 2: Power switchgear and controlgear assemblies

 

 

IS 13947 Part 1:2004

IS 13947-5:2004

IS 12729/IEC

60298-2004 Reaffirmed:2014

IS 13947, IS/IEC 60947-1:1993

Reaffirmed 2018

Low-Voltage Switchgear and Control gear, Part 5: Control Circuit Devices and Switching Elements, Section 2: Proximity Switches [ETD 7: Low Voltage Switchgear and Control gear]

HV Switch gears & Control gears

LV switch gear & control gear

 

 

IS 9921: 1985

Alternating Current Disconnectors (isolators) and Earthing Switches for Voltages

 

 

IS 8623:1993

BIS/IS:13947-1:1993 (R 2004)

IS 8623-Part 1 to

3:1993

Reaffirmed:2013

Low-Voltage Switchgear and Control gear Assemblies, Part 1: Requirements for Type-Tested For Low-Voltage Switchgear And Control gear

Low-Voltage Switchgear and

Control gear Assemblies

 

 

 

 

IEC 62271:2024

IS 62271-1:2008

Reaffirmed:2013

High-voltage switchgear and control gear – ALL PARTS

High-Voltage Switchgear and

Control gear

 

 

IEC 60947:2024 SER 

Low-voltage switchgear and controlgear – ALL PARTS

 

 

IS 2071 (Part 1): 2016

IEC 60060-1: 2010

High – Voltage test techniques: Part 1 general definitions and test requirements

 

 

IS 2148:2004

Electrical Apparatus For Explosive Gas Atmospheres – Flameproof Enclosures “d”.

 

 

EN 837:1998

Stainless steel diaphragm pressure

Flame proof enclosures

Stage & Final inspection

IEC 60079:2024 SER

Explosives Atmospheres-Equipment -Series of specific Type of Protection

 

 

IEC 60529:1989 + A1:1999 +A2:2013

Applies to the classification of degrees of protection provided by enclosures for electrical equipment

 

 

BS EN IEC 62646:2019

Nuclear power plants – Control rooms – Computer based procedures

Fuse or fuse-link

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

 

IS 9385: Part 1: 2018/ IEC 60282-1:2020

high voltage expulsion fuses alternating current systems of 50 Hz of rated voltages exceeding 1000 V

Electrical accessories – Circuit-breakers for overcurrent protection for household and similar installations

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 60898-1:2015+ AMD1:2019

Part 1: Circuit-breakers for a.c. operation

 

 

IEC 60898-2:2016 

Part 2: Circuit-breakers for AC and DC operation

 

 

IEC 60898-3:2019+AMD1:2022

Part 3: Circuit-breakers for DC operation

Porcelain Insulators and Bushings

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 60137:2017

IS 731:1971 (Reviewed in 2021)

Bushing for Three-Phase Alternating Current System, Having rated Voltage above 1000V and Frequency Between 15 to 60Hz

 

 

IS 8603: 2008

(R:2019)

Lays down the dimensions of the porcelain parts of the transformer bushings of 52 KV for use in heavily polluted atmospheres

 

 

IS 3347-1:1979

(R:2019)

IS 3347-2: 1979

(R:2019)

IS 3347-3-1: 1988

(R:2019)

IS 3347-3-2: 1982

(R:2019)

IS 3347-4-1: 1988

(R:2019)

Dimensions for porcelain transformer bushings for use in normal and lightly polluted atmospheres:

Part I- Up to and including 1 KV bushings

Part II- 3.6 kV Bushings

Part III- 12 and 17.5 KV Bushings

Part IV- 24 KV Bushings

 

 

IS 3347-4-2: 1982

(R:2019)

IS 3347-5: 1979

(R:2019)

IS 3347-8-1:1978

(R:2019)

IS 3347-8-1:1992

(R:2019)

Part IV- 36 KV Bushings

Part VIII- 52 KV Bushings

 

 

IS 5621/1980

(R:2004)

Specification for hollow insulators for use in electrical equipment

 

 

IEC 60383-1:1993

Insulators for overhead lines with a nominal voltage above 1000 V – Part 1: Ceramic or glass insulator units for a.c. systems – Definitions, test methods and acceptance criteria

 

 

IS 1445:1977

(Reaffirmed 2019)

Porcelain Insulators For Overhead Power Lines With A Nominal Voltage Up To And Including 1 000 V

 

 

IS/IEC 60168 : 2000/IEC 60168 : 2000

Tests on indoor and outdoor post insulators of ceramic material or glass for systems

 

 

IS/IEC 62155 : 2003/IEC 62155 : 2003

Hollow pressurized and unpressurized ceramic and glass insulators for use in electrical equipment with rated voltages greater than 1 000 v

 

 

 

IEC 61109:2008

Insulators for overhead lines – Composite suspension and tension insulators for a.c. systems with a nominal voltage greater than 1000 Volts – Definitions, test methods and acceptance criteria

Polymer Insulators

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 62217:2012

Polymeric HV insulators for indoor and outdoor use – General definitions, test methods and acceptance criteria

PV Module/ Solar Module

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 61215-1:2021

IEC 61215-1-1:2021

IEC 61215-1-2:2021

IEC 61215-1-3:2021

IEC 61215-1- 4:2021

IEC 61730 (I & II),

IEC 62804, IEC 60068, IEC 62716,

IS 14286 (BIS),

UL 61730, CEC

Terrestrial photovoltaic (PV) modules – Design qualification and type approval

Part 1-2: Special requirements for testing of thin-film Cadmium Telluride (CdTe) based photovoltaic (PV) modules, Photovoltaic (PV) Module Safety Qualification and Customer requirements in the form of QAP

Lighting Arresters/ Surge Arresters & Isolators

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC:60099-4(2014)

IEC 60099-5:2018

IEC 60099-6:2019

IEC 60099-7:2017

IEC 60099-8:2017

IEC 60099-9:2014

IS:3070-1993 Part-3

(R:2004)

Metal-oxide surge arresters without gaps for A.C. systems, voltage of 52 KV and less, Metal-oxide surge arresters with external series gap (EGLA) for overhead transmission and distribution lines of A.C systems above 1 KV and Metal-oxide

 

 

 

surge arresters without gaps for HVDC converter stations

Generators

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 13364: Part 1: 1992

Ac generators driven by reciprocating internal combustion engines – Specification: Part 2 alternators rated up to 20 KVA

 

 

IS 13364: Part 2: 1992

Ac generators driven by reciprocating internal combustion engines – Specification: Part 2 alternators rated above 20 KVA and up to 1250 KVA

 

 

CBIP latest Publication

Manual on standardization

 

 

BS 2613:1970

The Electrical Performance of Rotating Electrical Machinery

 

 

ISO: 8528: 2005

(Part 1 to 10)

Reciprocating Internal Combustion Engine Driven Alternating Current Generating Sets OR any equipment standards National / International Specifications / standards / Client specific requirements / Internal Procedures

Smart Meter

 

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 16444(Part 1): 2015 Reaffirmed:2020

IS 13779: 2020

A.C. Static Direct Connected Watthour Smart Meter – Class 1 And Class 2

AC Static Watt-Hour Meters

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 16444 (Part 2): 2017

IS 14697: 2021

AC static transformer operated watthour and var – Hour smart meters, class 0.2 S, 0.5 S and 1.0 S: Part 2 specification transformer operated smart meters

 

 

IEC 62052 :2020

IEC 62053 :2020

Electricity metering equipment (a.c.) – General requirements, tests and test conditions Metering equipment & AC active energy Meter (classes 0.5, 1, 2,3 for KVA and KVAR)

Pre-Paid Energy Meter

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 15884:2010 (R:2015)

Alternating Current Direct Connected Static Prepayment Meters For Active Energy (Class 1 And 2)

Electricity metering

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 62055- 31:2005

Electricity metering – Payment systems – Part 31: Particular requirements – Static payment meters for active energy (classes 1 and 2)

 

Smart Energy Meter

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 13875: Part 1:1993 (Reaffirmed:2020)

AC static transformer operated watthour and var – Hour smart meters, class 0.2 S, or Measurement & Control: Part 1 General Specifications Concerning Terms, Tests & Data Sheet Details

 

 

IS 13875: Part 2:1993 (Reaffirmed:2020)

IS 13875: Part 3:1993 (Reaffirmed:2020)

Digital Measuring Instruments For Measurement & Control: Part 2 Terms, Tests & Data Sheet Details Of Instruments For Measuring Analog Quantities

Electricity meters

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 15707: 2006

Testing, Evaluation, Installation And Maintenance Of Ac Electricity Meters — Code Of Practice

Flood Lights

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS: 10322

(Part S/Set 5) :1987

Reaffirmed:2005

Flood Lights

AC Disconnectors (Isolators) & Earthing

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 9921- Part 1:1981

IS 9921- Part 2:1982

IS 9921- Part 4:1985

Alternating Current Disconnectors (Isolators) and Earthing Switches for Voltages above 1000V. Part 1 : General and Definitions, Rating and Type & Routine Test

 

 

IEC 62271- 102:2018

High-voltage switchgear and control gear – Part 102: Alternating current disconnectors and earthing switches

 

 

IS 3842 Part 1:1967

Part 1. Application guide for electrical relays for ac Systems.

Manufacture of accumulators, primary cells and primary batteries like (UPS, Battery, Battery chargers)

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

BIS IS 1651:1991 (R:2002)

BIS IS 1652:1991 (R:2002)

IS 15549:2005

IS 13369:1992

Specification for stationary cells and batteries, lead-acid type with tubular positive plates

 

 

IEC 62133-1:2017

IEC 62133-2:2017

IS 16046 (Part 1): 2018/IEC 62133-1:2017

IEC 61427- 1:2013

IS 15549:2005

IS 16220 (Part 2) :2017 IEC 61056-2

Secondary cells and batteries containing alkaline or other non-acid electrolytes – Safety requirements for portable sealed secondary cells, and for batteries made from them, for use in portable applications – Part 2: Lithium Batteries and VRL Batteries

 

 

EN 50091-1-2:1998

IS 13314:1992

IS 11260:2010

Uninterruptible Power Systems (ups) – General And Safety Requirements For Ups Solid state inverters run from storage Batteries

 

 

ISA 5.2:1976 (R1992)

Binary Logic Diagrams For Process Operations Gives a method of logic diagramming of binary interlock and sequencing systems

Accumulators, primary cells & batteries

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 7372:1995 (R:2017)

IS 6303:2018

Lead acid batteries for motor vehicles

General requirements and methods of tests for dry cells and batteries

 

 

IS 15549:2005 (R:2020)

Stationary Regulated Lead Acid Batteries

 

 

IS 14782:2000 (R:2020)

Code of Practice for Maintenance and Testing of Large Lead Acid Batteries for Generating Stations and Substations

 

 

IS 10918:1984

(R:2018)

Specification for vented type nickel cadmium batteries

Battery charger, Invertors, Convertors

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 146:2009

IS 16242:2014

IS 13314:1992 Reaffirmed:2013

Rectifiers & Invertors

Uninterruptible Power Systems (UPS)

Solid state invertors run from storage batteries

Industrial Process Control Equipment (PLC, DCS, SCADA, CCTV, F&G, Pressure Transmitter, Ultrasonic Level Transmitter, F&G Dectors, Gas Leak Detectors)

Gas leak detectors

Industrial process control equipment

(PLC, DCS, SCADA, CCTV)

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

NFPA 72:2016

 

IS 13432-1:1992

Reaffirmed:2013

 

 

IEC 61511:2018

 

 

 

IEC 61131:2013

 

IEEE 472:1974

 

Approved drawings,

datasheets, PO specs,

PR, Mfr’s catalogue,

National Fire Alarm and Signalling Code

Gas leak detector for use with low pressure Liquefied Petroleum Gas burning appliances

Functional safety of instrumented

system for process industry

 

Programmable controllers

 

Electrical surge protection

 

Instrumentation products

 

Industrial process Control

 

 

CCOE, DMRI, FM,

BASSEFA, BIS standards

FAT procedure approved

by client/DEC

equipment (PLC, DCS, SCADA,

CCTV, Fire & Gas detection

systems)

Transmitters

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 13122-2:1991 reaffirmed 2016

Transmitters for use in industrial process control systems

Analyzers

Stage & Final Inspection/ Doc. Review/Audit/

IS 13673-5:1999 Reaffirmed:2019

Expression of Performance of Electrochemical Analyzers

 

Vendor Evaluation/ Gap reporting

 

 

Flow meters

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 15672: 2006 Reaffirmed:2017

Flow measurement of natural gas and fluids by coriolis meters

 

 

IS 15674:2006 Reaffirmed:2017

Flow measurement of natural gas by ultrasonic meter

Level switches

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

 

 

ASTM F 2045:2018

Standard Specification for Indicators, Sight, Liquid Level, Direct and Indirect Reading, Tubular Glass/Plastic

Smoke detectors

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 11360:2015

Specification for smoke detectors for use in automatic electrical fire alarm system

Heat detectors

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 2175:2015

Specification for heat sensitive fire detectors for use in automatic fire alarm system

Transducer

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

ASTM F2070:2017

Standard specifications for transducers, pressure and differential pressure, electrical and optical fibre

Connectors

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 60874

Connectors for optical fibres

 

 

IEC 60603

Connectors for frequencies below 3 MHz for use with printed boards

 

Capacitors

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

 

IS 2993:2006

AC motor capacitors

 

 

IS 13925:2012

Shunt capacitors for AC power system having a rated voltage above 1000v

PLC (programmable logic controller)

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 61508:2010

Functional Safety of Electrical/Electronics/Programmable elements

 

 

ISA 5.3:1983

Graphic symbols for distributed controls/shared display instruments

 

 

IEC 61131 PARTS 1- 4:2013

Programmable Controllers

VFD drive systems

 

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 6297 Part 1 :1971 Reaffirmed:2017,

2:1973 Reaffirmed:2017, 3 and 4 :1972

Reaffirmed:2017

 

IEC 60146 Part 1 -2009 & 2:2011

IEC 61800-1:2021

 

Specification for Transformers and

Inductors (Power, Audio, Pulse and Switching) for Electronic Equipment

 

 

Semiconductor convertors

 

DC power drive systems, which include semiconductor power conversion and the means for their control, protection, monitoring, measurement and the DC motors.

 

 

DCS (Distributed control system)

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 61508:2010

Functional Safety of Electrical/Electronics/Programmable elements

 

 

ISA 5.3:1983

Graphic symbols for distributed controls/shared display instruments

Cable tray

 

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 61537:2023

 

Cable management – Cable tray systems and cable ladder systems

Electrical measuring instruments

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS 1248 Part 1 to 9:2003

Reaffirmed:2018

 

IS 12346:1999 Reaffirmed -2014

Direct Acting Indicating Analogue

electrical measuring instruments

and their accessories

Testing Equipment for AC Electrical Energy Meters

Fibre optic cabling

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 61280-4-5

Fibre-optic communication subsystem test procedures

 

 

IEC 60794-1- 1:2015 RLV

ITU-T- G.652: 2016

 

Characteristics of a single- mode optical fibre and cable

Lamp, Luminaires & Accessories

Stage & Final Inspection/ Doc. Review/Audit/

IS 10322 : Part 1 : 2014

Luminaires: Part 1 general Requirements and tests (First Revision)

 

Vendor Evaluation/ Gap reporting

 

 

 

 

IS 10322: Part 5:

Sec 1: 2012

Luminaires: Part 5 particular requirements: Sec 1 fixed general purpose luminaires

 

 

IS 6665 : 2005IS 10322: Part 5:

Sec 2 : 2012

Luminaires: Part 5 particular requirements: Sec 2 recessed luminaires

 

 

IS 10322: PART 5:

SEC 3 : 2012

Luminaires: Part 5 particular requirements: Sec 3

luminaires for road and street

lighting

 

 

IS 10322: Part 5:

Sec 5 : 2013

Luminaires: Part 5 particular requirements: Sec 5 Customer requirements in the form of QAP, Approved

 

 

IEC 62612:2013+ AMD1:2015+ AMD2:2018 IS 16102(Part 2):2017

Self-ballasted LED lamps for general lighting services with supply voltages > 50 V – Performance requirements

 

 

IEC 62717: 2014

IS 16103

LED modules for general lighting – Performance requirements

 

 

IEC 62722-1:2022

IEC 62722-2-1:2023

Luminaire performance – Part 1: General requirements

Luminaire performance – Part 2-1: Particular Requirements for LED luminaires

 

 

IS 16107 (Part 1)

: 2012

Reviewed In: 2024 (Active)

Luminaires performance: Part 1 general requirements

 

 

IS 16107

(Part 2/Sec 1): 2012

Reviewed In: 2024 (Active)

Part 2 particular requirements: Sec 1 led luminaire

 

 

IS 16107

(Part 2/Sec 2): 2017

Luminaries Performance Part 2 Particular Requirements Section 2 LED Street Lighting Luminarie

 

 

IEC 60969:2016

EN 60969:1993

IS 15111(Part 2):2002

Self-ballasted compact fluorescent lamps for general lighting services – Performance requirement

 

 

IEC 62384: 2006

IS 16104: 2012

DC or AC supplied electronic control gear for LED modules – Performance requirements

 

 

IEC 60968:2015

IS 15111(Part1): 2014

Self-ballasted LED-lamps for general lighting services by voltage >50 V – Safety specification

 

 

IEC 62560:2011+ AMD1:2015

IS 16102(Part-1): 2012

LED modules for general lighting – Safety specifications

 

 

IEC 62031:2018

IS 16103(Part1):2012

Lamp control gear – Part 1: General and safety requirements

 

 

 

IEC 61347- 1:2015 IS 15885(Part1):2015

Lamp control gear – Part 2-13: Particular requirements for d.c. or a.c. supplied electronic control gear for LED modules

 

 

IEC 60598-1:2020

Luminaires – Part 1: General requirements and tests

 

 

IEC 60598-2- 1: 1979

IS 10322

(Part 5/ Sec 1):2012

Luminaires – Part 2-2: Particular requirements – Recessed luminaires

 

 

IEC 60598-2- 2:2011

IS 10322

(Part 5/ Sec 2):2014

Luminaires – Part 2-3: Particular requirements – Luminaires for road and street lighting

 

 

IEC 60598-2- 3:2002

IS 10322

(Part 5/ Sec 3): 2012

Luminaires – Part 2-4: Particular requirements – Portable general purpose luminaires

 

 

IEC 60598-2- 4: 2017

IS 10322

(Part 5/ Sec 4): 1987

Luminaires – Part 2-5: Particular requirements – Floodlights

 

 

IEC 60598-2- 5: 2015

IS 10322

(Part 5/ Sec 5):2013

Luminaires – Part 2-8: Particular requirements – Hand lamps

 

 

IEC 60598-2- 8:2013

IS 10322 (Part 5/ Sec 6):2013

Luminaires – Part 2-20: Particular requirements – Lighting chains

 

 

IEC 60598-2- 22: 2014 / IS 10322

(Part 5/ Sec 8): 2013

Electrical and Photometric Measurements of Solid State Lighting products

 

 

 

 

IES LM 79 – 19

IS 16106: 2012

method of electrical and photometric measurements of solid state lighting (led) products

Cable jointing Kits & End Termination Kits for HT and LT cable

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IS:13573(P-2):2011

joints (straight joints

and branch joints), terminations, screened and

unscreened separable terminations and stop ends for

all designs of screened solid di-electric power cables

for voltage grade from 3.3 KV (UE) up to and including

33 KV (E)

AV Appliances

Witness of testing, Review of documents/records, Stagewise/Final

IEC 60065:2014,

IS 616:2017/

Audio, video and similar electronic apparatus –

Safety requirements

Switches &

Couples

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 61058-1: 2016, IS/IEC 61058 : PART 1: 2000

Switch for Appliances Part 1: General requirements

Appliance couplers for household and similar

 

 

 

General purposes – Part 1: General requirements

Appliance couplers

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 60320-1:  2021, IS/IEC 60320:

PART 1:2001,

General requirements for appliance couplers for two poles and two poles with earth contact and for the connection of electrical devices for household and similar onto the mains supply.

Heating cables

Stage & Final Inspection/ Doc. Review/Audit/ Vendor Evaluation/ Gap reporting

IEC 60800:2021

Heating cables with a rated voltage up to and including 300/500 V for comfort heating

Plug & Sockets

Witness of testing, Review of documents/records, Final and Stage-wise inspection

IEC 60884-1:2022

IS 1293: 2019

Plugs and fixed or portable socket-outlets for A.C. only, with or without earthing contact.

Portable socket-outlets for ac only, with and without earthing contact, with a rated voltage not exceeding 250 V and a rated current not exceeding 16 A intended for household and similar purposes, either indoors or outdoors.

Household Appliances

Witness of testing, Review of documents/records, Stage-wise/Final inspection

IEC 60335

All Parts

Household and similar electrical appliances

Fire detection systems

Witness of testing, Review of documents/records, Stagewise/Final inspection

 

 

 

 

IS 2189:2008 Reaffirmed:2013

Selection, Installation and Maintenance of Automatic Fire Detection and Alarm System Code of Practice

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 21

Other

 

 

 

Aerospace Components, Aerospace Assembly, Machined Components, Sheet Metal, Pipe and Weld Assembly, Interchangeability Criterion for Yokes / Yield (ICY) and Non-ICY Pipe jigs, Tools, Ground Support Equipment (GSE) / Ground Handling Equipment (GHE) Components.

Stage-wise / final inspection

CQAG 9006 Issue: Nil, Dt.22.02.2018

  Policy Document on Utilization of TPI Services

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

 

IAF Scope 22

Other Transport Equipment

 

 

 

Other transport Equipment Manufacture of railway and tramway locomotives & rolling stock

Stagewise and finished (assembled) products, railways coaches, wagons, mechanical electromechanical signalling & telecommunication, safety and traffic control equipment for railways inspection, including machining, assembly,

non-destructive, welding Inspection

Client requirements in the form of approved QAP, ITP, Technical work instructions, project specifications & requirements based on National codes and Standards as mentioned below

 

 

 

IS:813:1986 Reaffirmed:2013

Scheme for symbols for welding

 

 

IS:817:1966 Reaffirmed:2019

Code of Practice for training and testing of metal arc, welders

 

 

IS:2074:1992 Reaffirmed:2014

Ready Mixed paint, air drying, red oxide, zinc chrome priming specification

 

 

IS:2932:2003 Reaffirmed:2014

Enamel, synthetic exterior: (a)Undercoating, (b) Finishing

 

 

IS:3658:1999 Reaffirmed:2014

Code of practice for liquid penetrant flaw detection,

 

 

IS:5334: 2014

Code of Practice for magnetic particle flaw detection of welds

 

 

IS:9595:1996 Reaffirmed:2019

Metal arc welding of carbon and manganese steels – Recommendation

 

 

AWS D1.1:2015

Structural welding, Steel; Certification 

 

 

IS:7307:1974 Reaffirmed:2019

Approval tests for welding Procedure — Fusion Welding of Steel

 

 

ASTM A 435:2017

Straight beam ultrasonic examination of steel plates

 

 

IS 14846: 2000 Reaffirmed:2010

sluice valve for water works purposes

 

 

IS 1364 (Part 1) :2002

hexagon head bolts, screws and nuts of product grades a and b

 

 

E 505 – 01 (Reapproved:2006)

inspection of aluminum and magnesium die castings

 

 

IS 5: 2007

colours for ready mixed paints and enamels

 

 

IS 2062:1999 (Reaffirmed:2004)

Steel for general structural purposes-specification

 

 

IS: 6307 :1985 (Reaffirmed:2003)

specification for rigid pvc sheets

 

 

IRS R-48:1988

rubber componenets used in air brake equipment of diesel and electric locomotives

 

 

IRSIT-1:2012

specification for fishplates and fishplate bans

 

 

IS: 6913:1973 (Reaffirmed:1998)

specification for stainless steel tubes

 

 

IS 6603: 2001 (Reaffirmed:2004)

stainless steel bars and flats specification

 

 

IS: 1862: 1675 (Reaffirmed:2006)

specification of studs

 

 

IS 1879: 2010

malleable cast iron pipe fittings —specification

 

 

IS 3098: 1983 (Reaffirmed:2004)

specification for oil, hydraulic, mineral oil type

 

 

IS: 306:1983 (Reaffirmed:2004)

specification for tin bronze ignots and castings

 

 

IS 7906 (Part 5) :2004

helical compression springs

 

 

IS 3823: 1988 (Reaffirmed:1999)

rolling bearings

 

 

IS 5456 : 2006

testing of positive displacement type air compressors and exhausters —code of practice

 

 

 

MDTS-10263: 2014

technical specification for bogie bolster, body bolster & l.s beam

 

 

RDSO/2011/CG-04: 2018

axle mounted disc brake system for lhb type bg mainline coaches

 

 

TM/SM/2: 2007

specification of abrasive rail cutting wheel

 

 

IS 11159 (Part 7): 2012

lubricants, industrial oils and related products

 

 

RDSO/PE/SPEC/AC/0055-2003: 2014

specification for dry type air filter for air-conditioned coaches

 

 

IS 1964:2001 (Reaffirmed:2006)

textiles — methods for determination of mass per unit length and mass per unit area of fabrics

 

 

IRS T-23:2021

specification for track bolts and nuts (having metric screw threads with iso profile)

 

 

IRS:T-29

(Revised:2023)

indian railways standard specification for cast manganese steel (cms) crossings and weldable cast manganese steel (wcms) crossings

 

 

IRS:T-31:2021

indian railway standard specification for elastic rail clips (fifth revision) with corrigendum no. 2

 

 

IRS: T-10:2023

indian railway standard specification for fabricated switches and crossings, welded/heat treated crossings and switch expansion joints (sej)

 

 

IRS:T-51: 2020

technical specification for zinc aluminium metallisation of rails (feb-2020)  .

 

 

IRS:T-52: 2020

indian railway standard specification for ultrasonic testing of rails / welds using vehicular systems, revised-2020  

 

 

IRS:M-28:2020

mmaw electrodes and welding rods

 

 

IRS:M-46:2020

filler wire for mig/mag welding

 

 

IRS- M: 39 -2020

wire and flux for submerged arc welding

 

 

RDSO/CG-18001

(REV 2)

papis

 

 

RDSO/SPN/199/2010 Rev. 1.1

led lights

 

 

RDSO/SPN/165/2012, Version 3

smps based ips

 

 

RDSO/SPN/TC/107/

2018 ver. 2.0

25w digital radio set

 

 

RDSO/SPN/TC/110/2020

fibre optic cable

 

 

RDSO/SPN/153/2023 Revision 5.0

led signal lighting units

 

 

RDSO/SPN/ TC/51/11 Revision 3.0.

electronic lc gate telephone system

 

 

RDSO/SPN/175/2005

solid state block proving by axle counter

 

 

IRS: TC 77:2012

thermoshrink jointing kit for jointing underground quad cable

 

 

RDSO/SPN/TC/109/

2019 Rev 0.0 RDSO/SPN/TC/109/2023 Ver. 1.0

integerated communication system vhf (simplex)/specification of integrated communication system for tunnels

 

 

RDSO/SPN/192/2019, Ver.2

electronic interlocking

 

 

RDSO/SPN/203/2011/Ver.01

specification for electronic interlocking for big yards

 

 

RDSO/SPN/211/2022 Ver. 1.0

specificaton for failsafe network multiplexer (fnmux)

 

 

RDSO/SPN/153/2023 Rev. 5.0

specification for led signal lighting units for subsidiary colour light signals (route, shunt, calling on and tunnel signals) for railway signalling

 

 

RDSO/SPN/144/2006 Rev. 2

safety and reliability requirement of electronic signalling equipment

 

 

RDSO/SPN/165/2023 Ver. 4.0

smps based integrated power supply

 

 

S 99 : 2006

data logger system for railway

s & t installation

 

 

 

S 37 :2022 Version 2.0

motor for electric point machine

 

 

RDSO/SPN/153/2011 Rev. 4.1

led signal- lighting units for railway signalling

 

 

RDSO/SPN/199/2010 Rev1.1

led signal lamps for main color light signal for railway signalling

 

 

RDSO/SPN/200/2010 Rev-2.0

battery operated led based flashing tail lamp for railway vehicles

 

 

RDSO/SPN/201/2010 Ver.2.0

fog pilot assistance system for safety (fog pass)

 

 

RDSO/SPN/189/2004 Rev.3.0

modular terminal blocks, fuse

 

 

RDSO/SPN/165/2012 (Ver.3.0)

smps based integrated power supply (ips)

 

 

RDSO/SPN/256/2002

earth leakage detector

 

 

RDSO/SPN/197, Ver.1.0

code of practice for earthling and bonding system for signaling equipment

 

 

RDSO/SPN/173/2002 (Amdt-2)

fail- safe electronic flasher device

 

 

RDSO/SPN/146/2001

audio frequency track circuit

 

 

RDSO/SPN/177/2012 (Ver.3)

high availability single section digital axle counter

 

 

RDSO/SPN/191/2005 ( Ver.0)

dtmf based block bell and telephone equipment

 

 

RDSO/SPN/176/2013 Ver.-3

multi section digital axle counter

 

 

RDSO/SPN-168/2005 Rev.2

thermoplastic poly urethane insulators for railway signalling

 

 

RDSO/SPN/192/2019 Ver.2.0 & RDSO/SPN/203/2011

electronic interlocking

 

 

RDSO/SPN/196/2012 Ver.-3.2

train collision avoidance system (tcas)

 

 

RDSO/SPN/213/2014 Ver.1.0

advanced auxiliary warning system (aaws)

 

 

RDSO/SPN/208/2012 (Ver 2.0) Without hand generator

electric lifting barrier

 

 

RDSO/SPN/217/2018 Ver.2.0

automatic fire detection & alarm system for signalling installations (afdas)

 

 

RDSO/SPN/215/2018 Ver 2.0

power supply arrangements for level crossing gate/intermediate block working/intermediate relay hut

 

 

RDSO/SPN/194/2006 Rev.2.0

non-metallic colour light signal housings of various types for railway signalling

 

 

RDSO/SPN/175/2005 Ver-1

ssbpac (digital) for double line and single line

 

 

RDSO/SPN/114/91

single line neale’s ball token, type ‘a

 

 

RDSO/SPN/84 ver.2.0

relays – special type ( metal-to carbon )

 

 

IRS:TC:18-75

cable termination boxes (indoor) for railway electrified area.

 

 

IRS:TC:22-2021 Ver. 1.1

v.f. and signaling transformers used for derivation and termination of underground telecommunication cable circuits.

 

 

IRS:TC:30-05  Amdt. 5

underground rly jelly filled quad cables for signaling and telecom installation.

 

 

IRS:TC:32-2007 Amdt. 1

light weight unbreakable plastic insulator for overhead telegraph and telephone lines.

 

 

IRS:TC:36-97 Amdt. 2

magneto telephone with electro-dynamic transducer.

 

 

IRS:TC:37-97 Amdt. 2

2wire way station control telephone

 

 

IRS:TC: 38-97 Amdt. 2

4 wire way station control telephone

 

 

IRS:TC: 42/20 Ver. 1.0

six – pin emergency plug and socket.

 

 

IRS:TC: 50-90

repeater station equipment.

 

 

IRS:TC: 55:2006 Amdt. 3

indian railways standards specification for 24 fibre armoured optical fibre cable

 

 

IRS:TC: 59-93

automatic radio patching system for control circuit using dtmf signalling in optic fiber communication

 

 

IRS:TC: 60:2007

Amdt. 1

4 wire/ 2 wire train traffic control equipment with duel tone multi frequency (dtmf ) signalling.

 

 

IRS:TC: 61-93 Amdt. 2

emergency control room equipment.

 

 

IRS:TC: 68-2012 Amdt. 1

primary digital multiplexing equipment.

 

 

IRS:TC: 72-97

Amdt. 1

power supply unit (psu) for telecom installation at way side stations in 25 kv electrified area.

 

 

IRS:TC: 75-99 Amdt. 4

4wire/2wire portable emergency control telephone.

 

 

IRS:TC: 76-2021

two/three v.f. transformers (2t/3t) for derivation and termination of underground telecom cable circuit

 

 

IRS:TC: 77-2012 Amdt. 3

thermo shrink jointing kits for jointing underground quad cable.

 

 

IRS:TC: 78/20 Ver. 1.1

light weight portable control telephone  (4wire/2wire)

 

 

IRS:TC: 79-2000 Amdt. 4

desk type electronic megneto telephone.

 

 

IRS:TC: 80-2000 Amdt. 3

desk type 2wire 12 way dtmf telephone.

 

 

IRS:TC: 82-2005 Amdt. 3 

universal way side dtmf  control telephone.

 

 

IRS:TC: 83-20 Ver. 1.0

auto dialling system for emergency socket

 

 

RDSO/SPN/TL/23/

1999 Ver.4 Amdt. 1

smps based power plant for telecom equipment.

 

 

 

RDSO/SPN/TC/27/07 Ver.1

specification of digital/isdn and ip ready epabx system & attendant console-for more than 256 ports & up to 5000 ports.

 

 

RDSO/SPN/TC/34/

2002 Amdt. 1

specification for voice frequency communication system for underground quad cable.

 

 

RDSO/SPN/TC/038-2002 Ver. 2.0

voice data logger/monitor for control circuits.

 

 

RDSO/SPN/TC/44/

2002 Ver. 3.0

emergency socket box of frp material.

 

 

RDSO/SPN/TC/45/

2013 Amdt. 2

rdso specification of permanently lubricated hdpe duct

 

 

RDSO/SPN/TC/48/

2003, Rev.0

quality manual for telecom transmission equipment.

 

 

RDSO/SPN/TC/49/

2020 Ver. 1.0

specification for level crossing gate control and monitoring equipment based on wired & wireless (vhf) communication

 

 

RDSO/SPN/TC/51/

2021, Rev.1.0

electronic l.c.gate telephone system.

 

 

RDSO/SPN/TC/55/

2011 Amdt. 1

specification for accident site communication system

 

 

RDSO/SPN/TC/57/

2015 Amdt. 1

specification for thermoshrink jointing kit for jointing underground pijf cable

 

 

RDSO/SPN/TC/62/

2008 Amdt. 2

specification of digital clock with gps synchronization

 

 

RDSO/SPN/TC/63/

2006 Ver.1

rdso specification of public announcement system (analog)

 

 

RDSO/SPN/TC/65/

2021 Ver. 6.0

rdso specification of ip based video surveillance system

 

 

RDSO/SPN/TC/66/

2007 Ver. 1.0 

specification for control communication equipments for ofc using 2 wire telephones (cceo)

 

 

RDSO/SPN/TC/68/

2014 Amdt. 1

specification of joint enclosure for armoured optical fibre cable

 

 

RDSO/SPN/TC/69/

2007 Rev.0

specification of patch cord and pig tails

 

 

RDSO/SPN/TC/72/

2007 Amdt. 2

rdso specification for 1.4 mm dia copper conductor 4/6 quad cable.

 

 

RDSO/SPN/TC/73/2008 Ver.-1.0

vhf based seccured station communication equipment (ssce)

 

 

RDSO/SPN/TC/80/2020 Rev. 2.0

digital modem(nx64kbps) upto 2mbps (line driver)

 

 

RDSO/SPN/TC/82/2020 Rev. 2.0

 lan extender

 

 

RDSO/SPN/TC/83/2020 Rev. 2.1

lan switch

 

 

RDSO/SPN/TC/84/2008 Rev.0

specification of router

 

 

RDSO/SPN/TC/85/2010 Amdt. 2

rdso specification for suitcase type portable auto-acquiring vsat terminal

 

 

RDSO/SPN/TC/86/2008 Amdt. 1

specification for portable    vsat terminal

 

 

RDSO/SPN/TC/87/2021 Rev. 1.0

fixed vsat terminal

 

 

RDSO/SPN/TC/88/2021 Ver. 2.0

mobile train radio communication system (global system for mobile communications – railways)

 

 

RDSO/SPN/TC/93/2010 Rev.0

access control system

 

 

RDSO/SPN/TC/97/2012 Rev.1

telecom cable termination box (non metallic) for indoor use

 

 

RDSO/SPN/TC/98/2011 Amdt. 1

rdso specificatio for surge protective devices for telecommunication equipments

 

 

RDSO/SPN/TC/99/2012 Rev. 2

voip based train control communication system

 

 

RDSO/SPN/TC/100/2020 Rev. 1.0

video conferencing system

 

 

RDSO/SPN/TC/101/2012 Amdt. 1

silicone gel based cable jointing kit

 

 

RDSO/SPN/TC/103/2013 Rev.2

managed media converter (ethernet/e1 to optical)

 

 

RDSO/SPN/TC/105-2015 Ver. 2.1

specification for vhf based approaching train warning system for track maintainers

 

 

RDSO/SPN/TC/106/2022 Ver. 2.1

rdso specification for lp based closed circuit television (cctv) surveillance system in coaches of lndian railways

 

 

RDSO/SPN/TC/107/2018 Ver.- 2.1

vhf sets to be used on indian railways

 

 

RDSO/SPN/TC/108/2019 Amdt.1

ip based integrated passenger information system

 

 

RDSO/SPN/TC/109/2023 Ver. 1.0

rdso specification for integrated communication system for tunnels

 

 

RDSO/SPN/TC/110/2020 Rev. 0

specification of  24/48 fibre armoured optical fibre cable

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 25

Electricity supply

 

 

 

Electric power Generation, Transmission and Distribution- Renewable (Solar & Wind) and Transmission Line

Design Appraisal, Stage-wise, Final Inspection, Safety/Quality/Field 

 

 

IEC 62446- 1:2016 + AMD1: 2018

Photovoltaic (PV) System-Requirements for testing, documentation and maintenance – Part 1: Grid connected systems – Documentation, commissioning tests and inspection;

Inspection of Construction, Commissioning, operation of Systems and associated components

 

 

 

 

 

IEC 62446- 3:2017

Part 3: Photovoltaic modules and plants – Outdoor infrared thermography

 

 

IEC 61215- 1:2021

Terrestrial photovoltaic (PV) modules – Design qualification

 

 

 

and type approval – Part 1: Test requirements. 

 

 

IEC 61215- 2:2021

Part 2: Test procedures

 

 

IEC 61730- 1:2016

Photovoltaic (PV) module safety qualification – Part 1: Requirements for construction. 

 

 

IEC 61730- 2:2016

Part 2: Requirements for testing

 

 

IEC 62109- 1:2010 

Safety of power converters for use in photovoltaic power systems – Part 1: General requirements. 

 

 

IEC 62109- 2:2011

Part 2: Particular requirements for inverters

 

 

IEC 62817:2014 + AMD1: 2017

Photovoltaic systems – Design qualification of solar trackers

 

 

IEC 61724- 1:2021

 

Photovoltaic system performance – 

Part 1: Monitoring

 

 

 IEC 61724- 2:2016

Part 2: Capacity evaluation method

 

 

 

Part 3: Energy evaluation method 

 

 

IEC 62093:2005

Balance-of-system components for photovoltaic systems – Design qualification natural environments

 

 

IEC 62548:2016

Photovoltaic Arrays Design requirements

 

 

IEC TS 62738:2018

Ground-mounted photovoltaic power plants – Design guidelines and recommendations

 

 

IEC 62817:2014 + AMD1: 2017

Photovoltaic systems – Design qualification of solar trackers

 

 

BS 2456:1990

Specification for floats (plastics) for float operated valves for cold water services

 

 

IEC 62446-1:2016 + AMD1: 2018

Photovoltaic (PV) systems – Requirements for testing, documentation and

 

 

 

maintenance – Part 1: Grid connected systems – Documentation, commissioning tests and inspection

 

 

IEC/TS 63049:2017

Terrestrial photovoltaic (PV) systems – Guidelines for effective quality assurance in PV systems installation, operation and maintenance

 

 

IEC 61400-1:2019

Wind energy generation systems – Part 1: Design requirements

 

 

IEC 61400-3-1:2019

IEC 61400-3-2:2019

Wind energy generation systems – Part 3-1: Design requirements for fixed offshore wind turbines. 

Part 3-2: Design requirements for floating offshore wind turbines

 

 

IEC 61400-12-1:2017

Wind energy generation systems – Part 12-1: Power performance measurements of electricity producing wind turbines.

 

 

IEC 61400-12-2:2013

Part 12-2: Power performance of electricity-producing wind

 

 

 

turbines based on nacelle anemometry

 

 

IEC 61400-21:2019

Wind energy generation systems – Part 21-1: Measurement and assessment of electrical characteristics – Wind turbines

 

 

National Electricity Act 2003

National Electricity Act 2003

 

 

IEC 60204-1:2016

Safety of machinery – Electrical equipment of machines – Part 1: General requirements

 

 

IEC 60204-11:2018

Safety of machinery – Electrical equipment of machines – Part 11: Requirements for HV equipment for voltages above 1 000 V a.c. or 1 500 V d.c. and not exceeding 36 KV

 

 

IEC 61936-1:2021

Power installations exceeding 1 KV a.c. – Part 1: Common rules

 

 

IEC 60076-1:2011

Power transformers – Part 1: General

 

 

IEC 60947-1:2021

Low voltage switchgear and control gear-Part 1: General rules

 

 

IS: 432-1982-1 & : 1982

Mild steel & medium tensile steel bars & hard drawn steel wire for concrete reinforcement.

 

 

IS: 802:1:2015

Code of practice for use of structural steel in overhead transmission line

 

 

`IS:802:2:1978

 

Part 2: Fabrication, Galvanizing, Inspection and Packing

 

 

IS: 802:3:1978

Part 3:Testing

 

 

IS: 800:2007

General Construction In Steel – Code of Practice

 

 

IS: 4091:1979

Code of practice for design and construction of foundations for transmission line towers and poles

 

 

IS: 5613: Part-1:1985 

Code of practice for design, Installation and maintenance of overhead power lines. Part-1 Lines up to and including 11 KV.

 

 

IS: 5613: Part-2:1985

Part: 2 Lines above 11 KV and up to and including 220 KV

 

 

IS: 5613: Part-3:1989

Part 3 Lines above 220 KV

 

 

IS: 3043:2018

Code of Practice for Earthing

 

 

IS: 1255:1983

Code of practice for installation and maintenance of power cables up to and including 33 KV rating 

 

 

IS: 7215:1974

Specification for Tolerance for Fabrication of steel structures

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 26

Gas supply

 

 

 

Gas Supply-NGPL with item 26-A (iii)

Stagewise/

In-service

1)PNGRB’s GSR 808(E) dated 11.11.2009 along with latest amendments, national/ international standards mentioned therein and relevant statutes

1)PNGRB’s “Technical Standards and Specifications including Safety Standards for Natural Gas Pipelines” Regulations, 2009

Gas Supply–CGD with item 26-B (iii)  

Stagewise /

In-service 

2)PNGRB’s GSR 612(E) dated 27.08.2008 along with latest amendments, national/ international standards mentioned therein and relevant statutes

2)PNGRB’s “Technical Standards and Specifications including Safety Standards for City or Local Natural Gas Distribution Network” Regulations, 2008

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

IAF Scope 28

Construction

 

 

 

Site survey & infrastructure

Stagewise/

Final inspection

Client specifications

Site survey & infrastructure

Excavation, soil classification & testing, backfilling, Compaction

Stagewise/ Final inspection

IS 2720 Part 1 – 28 – Reaffirmed:2016

Excavation, soil classification & testing, backfilling, Compaction

 

 

IS 3764: 1992 Reaffirmed 2017

Code of safety for excavation work

 

 

IS 1498: 1970 Reaffirmed:2016

Classification and identification of soils for general engineering purposes

 

 

 

 

IS 10379:1982 Reaffirmed:2015

Code of practice for field control of moisture and compaction of soils for embankment and subgrade 

Plain cement concrete, Reinforced cement concrete & High-performance concrete

Stagewise inspection of PCC, RCC, HPC before, during & post concreting

IS 456:2000 Reaffirmed:2016

Plain and Reinforced Concrete – Code of Practice

 

 

IS 3935:1966 Reaffirmed:2017

Code of practice for composite construction

 

 

IS 13311 part 1 & 2: 1992 Reaffirmed:2013

Method of non-destructive testing of concrete

 

 

IS 13311 part 1 & 2: 1992 Reaffirmed:2013

Method of non-destructive testing of concrete

 

 

IS 10262– 2019

Concrete Mix design

 

 

IS 516:1959 Reaffirmed:2013

Test for strength of concrete

 

 

IS 9103:1999 Reaffirmed:2013

Specification for Concrete Admixtures 

 

 

IS 4925:2004 Reaffirmed:2015

Concrete Batching and Mixing Plant

 

 

IS 4926:2003 Reaffirmed:2017

Code of Practice Ready-Mixed Concrete

 

 

IS 1642:2013

Code of practice for fire safety of buildings

Pile driving & testing

Stagewise/

Final inspection

IS 2911 Part 1 to 4:2010 Reaffirmed :2015

Design and construction of pile

Drainage systems

Stagewise/

Final inspection

IS 1742:1983 Reaffirmed:2017

Code of practice for building drainage

 

 

IS 12251:1987 Reaffirmed:2014

Code of practice for drainage of building basements

Mechanical Electrical & Plumbing (MEP) works

Stagewise/

Final inspection

IS 12183:1987 Reaffirmed:2014

Code of practice for plumbing in multi-storied buildings

 

 

IS 2065;1983 Reaffirmed:2017

Code of practice for water supply in buildings

 

 

IS 732:2019

Code of Practice for Electrical Wiring Installations 

 

 

IS 12183:1987 Reaffirmed:2014

Code of practice for plumbing in multi- storeyed building

Firefighting systems

 

Stagewise/

Final inspection

IS 3844:1989 Reaffirmed:2015

Code of Practice for Installation and Maintenance of Internal Fire Hydrants and Hose Reels on Premises

 

 

IS 2189:2008 Reaffirmed:2013

Selection, Installation and Maintenance of Automatic Fire-Detection and Alarm System – Code of Practice

 

 

National building code part IV :2016

Fire & Life Safety

Firefighting systems

Stagewise/

Final inspection

IS 3844:1989 Reaffirmed:2015

Code of Practice for Installation and Maintenance of Internal Fire Hydrants and Hose Reels on Premises

Bridges, Roads, pre-stressed concrete

Stagewise/

Final inspection

IRC 40:2002

Standard Specifications and Code of Practice for Road. Bridges

 

 

IRC 6:2017

Standard specifications and code of practice for road bridges.

Dams, metro/mono rail & other massive structures 

Stagewise/

Final inspection

IS 457:1957 Reaffirmed:2019

Code of Practice for General Construction of Plain and Reinforced Concrete for Dams and Other Massive Structures

Masonry work.

Stagewise/

Final inspection

IS 2212:1991 Reaffirmed:2014

Code of practice for brickworks

 

 

IS 2572:2005 Reaffirmed:2015

Construction of hollow and solid concrete block masonry

 

 

IS 1905:1987 Reaffirmed:2017

Code of Practice for Structural use of Unreinforced Masonry

 

 

IS 1641, 1642, 1643:2013

Code of practice for fire safety of building

 

 

IS 9103:1999 Reaffirmed:2013

Admixtures for concrete

Building Finishing works (Stagewise)

Final inspection

Client specifications

Building Finishing works (Stagewise)

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

 

 

 

IAF Scope 29

Wholesale and Retail Trade; Repair of Motor Vehicles, Motorcycles and Personal and Household Goods

 

 

 

Wholesale & retail trade: Pre-shipment Inspection and Certificate of Conformity (CoC / VoC / CoI) for export.

Packaging and artwork verification, Quantity verification, Marking Verification, Visual Inspection, Measurements, Document Check. 

As per Inspection Checklist, Work Instruction and Client’s PO Specification as detailed in 

1.WI/INSP/01/VOC Rev 00 

2. WI/INSP/02/VOC Rev 00  

1. Verification of Conformity (VOC) Procedure for Egypt

 

2.Pre shipment Inspection Work Instruction for Egypt covering the following products: 

Regulated Textile Products 

Ready-Made Garments including accessories like scarves, handkerchiefs, hats, gloves, etc.

Home Textiles

Carpets, Rugs and Floor Coverings

Bags and purses made of textile

Regulated Leather and Footwear Products

Regulated other Products:

Bags and purses made of leather

Dairy products

Canned and dried fruits

Edible oils & Fats

Chocolate and CoIa products

Sugar products, Pasta, grain products (bread) and bakery products

Fruit juice

Mineral, natural, sparkling water and perfume ingredients

Soap and detergents

Floor cover

Tableware, cutleries and utensils

Sanitary ware, tubs, sinks, toilet and toilet seatsToilet paper, sanitary & cosmetic paper and baby diapers

Household tiles

Table glassware

Reinforced steel bars

Household appliances (stoves, blinders, AC system, fans, washing machines, fryers, heaters)

Offices & household furniture

Bicycles and motorcycles

Watches, Household lighting equipment, Toys

Petroleum, Chemical and Gas Cargo Inspection – Break Bulk Dry Cargo Inspection of Purified perthalic Acid (PTA), Polypropylene (PP),

Import Export Cargo Inspection – Break Bulk Dry Cargo Import / Export

WI-

01/PCG/BBDC/SOP/Rev. 02 Revision Date : 5.12 2023

Work Instruction for Inspection of Import & Export Cargo Inspection – Break Bulk Dry Cargo

Ammonia, PVC Resin Bags)

 

 

 

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date : 5.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date : 5.12.2023

 

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date : 5.12.2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Cargo Inspection of Break Bulk : Petroleum (Petrol, Diesel, Naphtha, Fuel Oil, Kerosene, Light Diesel Oil (LDO), Aviation Turbine Fuel (ATF), Crude Oil, Reformate)

Import Export Cargo Inspection – Break Bulk Liquid Cargo Import / Export

 

WI – 02/PCG/BBLC/SOP/Rev. 03 Revision Date : 03.11.2023

Work Instruction for Inspection & Sampling Import & Export Break Bulk Liquid Cargo – Products

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 5.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 5.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 5.12.2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Sampling  of Break Bulk : Petroleum (Petrol, Diesel, Naphtha, Fuel Oil, Kerosene, Light Diesel Oil (LDO), Aviation Turbine Fuel (ATF), Crude Oil, Reformate)

Import Export Cargo Inspection – Break Bulk Liquid Cargo Import / Export

WI – 02/PCG/BBLC/SOP/Rev. 03 Revision Date: 03-11-2023 

Work Instruction for Inspection & Sampling Import & Export Break Bulk Liquid Cargo – Products

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Cargo Inspection of Break Bulk Petrochemical (of Toluene,

 

 

Import Export Cargo Inspection – Break Bulk Liquid Cargo Import / Export

 

WI – 03/PCG/BBLC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & Sampling of Import & Export Break Bulk Liquid Cargo – Petrochemicals

Benzene, Para-xylene,Acetone, Mix-xylene, Methanol, Ethyl Alcohol, Methyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxide, n-Butene)

 

 

 

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R

Work Instruction for collecting all Vessel Documents

 

 

Rev. 02 Revision Date: 05-12-2023

 

 

 

WI – 03/PCG/BBLC/SOP/Rev. 3 Revision Date: 05-12-2023

Work Instruction for Inspection & Sampling of Import & Export Break Bulk Liquid Cargo – Petrochemicals

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Cargo Inspection of Break Bulk :

Import Export Cargo Inspection – Break Bulk Liquid Cargo Import / Export

WI – 03/PCG/BBLC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & Sampling of Import & Export Break Bulk Liquid Cargo – Petrochemicals

Chemical (of Sulphuric Acid, Phenol, Mono Ethyle Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate,

 

 

 

Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Analine Oil, Lauryl Alcohol, Alfa Olifine)

 

 

 

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

 

 

WI – 03/PCG/BBLC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & Sampling of Import & Export Break Bulk Liquid Cargo – Petrochemicals

 

 

WI – 03/PCG/BBLC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & Sampling of Import & Export Break Bulk Liquid Cargo – Petrochemicals

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Cargo Inspection of Break Bulk :  Edible Oil/Base Oil (of Refine blend Palm Oil (RBD), Crude Sunflower Oil (CSFO), Crude Degummed Soyabean Oil (CDSBO), Ultra – 2/3/4/6/8, SK70N, 150N, 500N, 500S, BS150, H150)

Import Export Cargo Inspection – Break Bulk Liquid Cargo Import / Export

 

WI- 05/PCG/BBLC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & sampling of Import & Export Break Bulk Liquid Cargo – Oils

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date:

05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

 

 

WI- 05/PCG/BBLC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & sampling of Import & Export Break Bulk Liquid Cargo – Oils

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Cargo Inspection of Break Bulk :

Import Export Cargo Inspection – ISO Container Cargo Import / Export

WI- 07/PCG/ICC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & sampling of Import & Export ISO Container

Petroleum (Petrol, Diesel, Naphtha, Fuel Oil, Kerosene, Light Diesel Oil (LDO), Aviation Turbine Fuel (ATF), Crude Oil, Reformate, Jet A1)

 

 

 

 

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

 

 

WI- 07/PCG/ICC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & sampling of Import & Export ISO Container

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Cargo Inspection of Break Bulk Petrochemical (of Toluene, Benzene, Para-xylene, Acetone, Mix-xylene, Methanol, Ethyl Alcohol, Methyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxide, n-Butane)

Import Export Cargo Inspection – ISO Container Cargo Import / Export

WI- 07/PCG/ICC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & sampling of Import & Export ISO Container

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

 

 

WI- 07/PCG/ICC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & sampling of Import & Export ISO Container

 

 

WI – 13/PCG/HP/SOP/Rev.

Work Instruction for Cargo’s Handling Procedure

 

 

02 Revision Date: 05-12-2023

 

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Cargo Inspection of Break Bulk :  Chemical (of Sulphuric Acid, Phenol, Mono Ethyle Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate, Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Analine Oil, Lauryl Alcohol, Alfa Olifine)

 

 

Import Export Cargo Inspection – ISO Container Cargo Import / Export

WI- 07/PCG/ICC/SOP/Rev.03 Revision Date:

05-12-2023

Work Instruction for Inspection & sampling of Import & Export ISO Container

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Sampling  of Break Bulk : Chemical (of Sulphuric Acid, Phenol, Mono Ethyle Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate, Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Analine Oil, Lauryl Alcohol, Alfa Olifine)

Import Export Cargo Inspection – ISO Container Cargo Import / Export

 

WI- 07/PCG/ICC/SOP/Rev. 03 Revision Date: 05-12-2023

Work Instruction for Inspection & sampling of Import & Export ISO Container

 

 

 

 

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05-12-2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05-12-2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Inspection of Dry Chemical of (Rock Phosphate, Zinc, Caustic in Powder form, Polypropylene (PP), Ammonia, PVC Resin Bags) 

Import Export Cargo Inspection – Box Container Cargo Import / Export

WI – 08/PCG/BDC/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Inspection of Import & Export Cargo Inspection – Box Container Dry Cargo

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Inspection of Liquid Chemical (Caustic soda,  Lube Oil, Base oil, Toluene, Benzene, Para-xylene, Mix-xylene, Methanol, Ethyl Alcohol, EthanolMethyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxidePhenol, n-Butane)

Import Export Cargo Inspection – Box Container Cargo Import / Export

WI – 04/PCG/BBLC/SOP/Rev. 03 Revision Date: 05.12.2023

Work Instruction for Inspection & sampling of Import & Export Box Container – Chemicals

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

 

 

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

Work Instruction for collecting all Vessel Documents

 

 

WI – 04/PCG/BBLC/SOP/Rev. 03 Revision Date: 05.12.2023

Work Instruction for Inspection & sampling of Import & Export Box Container – Chemicals

 

 

 

 

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Inspection of Flexi-Bag (Lube Oil, Base

 

Import Export Cargo Inspection – Box Container Cargo Import / Export

WI – 10/PCG/BCF/SOP/Rev. 03 Revision Date: 05.12.2023

Work Instruction for Inspection & sampling of Import & Export Box Container- Flexi Bags

oil, MEG, DEG, Propylene Glycol Industrial)

 

 

 

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

Work Instruction for collecting all Vessel Documents

 

 

WI – 10/PCG/BCF/SOP/Rev. 03 Revision Date: 05.12.2023

Work Instruction for Inspection & sampling of Import & Export Box Container- Flexi Bags

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

 

 

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Inspection of Gas Cargo Ship (Liquefied Petroleum Gas (LPG), Propane, Butane)

 

Import Export Cargo Inspection – Gas Cargo Ship

Cargo Import / Export

WI – 06/PCG/GC/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Inspection & Sampling of Import & Export Gas Cargo – LPG

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

 

 

 

Work Instruction for collecting all Vessel Documents

 

 

WI – 06/PCG/GC/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Inspection & Sampling of Import & Export Gas Cargo – LPG

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Inspection of Shore Line,

Terminal Operation Import / Export -Shore Line Inspection

Terminal & Shore Tank Inspection

WI – 11/PCG/STSL/SOP/Rev. 03 Revision Date: 05.12.2023

Work Instruction for Inspection of Import & Export Shore Tank & Shore Line

pigging operation, checking cleanliness and compabilities prior to import / export of shipment. Shore Tank Inspection, Empty tank Inspection, Gauging, Sampling,

 

 

 

Outturn Report, Dispatch and Delivery Inspection.

 

 

 

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

Work Instruction for collecting all Vessel Documents

Petroleum, Chemical and Gas Cargo Inspection – Receipt Inspection (of Toluene,

Benzene, Para-xylene, Acetone, Mix-xylene, Methanol, Ethyl Alcohol, Methyl tert-butyl ether (MTBE), Linear alkyl benzene (LAB), Vinyl acetate monomer (VAM), Propylene oxide, n-Butene, Sulphuric Acid, Phenol, Mono Ethyle Glycol, DI- Chloromethane, Styrene Monomer, Butyl Acrylate, Phosphoric Acid, Propylene Glycol Industrial, Nitric Acid, Acetic Acid, N-butanol, Analine Oil, Lauryl Alcohol,Alfa Olifine, Refine blend Palm Oil (RBD), Crude Sunflower Oil (CSFO), Crude Degummed Soyabean Oil (CDSBO), Ultra – 2/3/4/6/8, SK70N, 150N, 500N, 500S, BS150, H150)  

Terminal Operation Import / Export -Road Tanker Inspection

WI -12/PCG/ATT/SOP/Rev. 03 Revision Date: 05.12.2023

Work Instruction for Inspection & Sampling of Import & Export Auto Tanker

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

Work Instruction for collecting all Vessel Documents

 

 

WI -12/PCG/ATT/SOP/Rev. 03 Revision Date: 05.12.2023

Work Instruction for Inspection & Sampling of Import & Export Auto Tanker

 

 

WI – 13/PCG/HP/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction for Cargo’s Handling Procedure

 

 

WI -14/PCG/FM/SOP/Rev. 02 Revision Date: 05.12.2023

Work Instruction of Job File Management

 

 

WI – 15/PCG/VD/SOP/R Rev. 02 Revision Date: 05.12.2023

Work Instruction for collecting all Vessel Documents

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

 

 

 

IAF Scope 39

Other Social Services

 

 

 

Other Social Services Amusement Park Play Ground Equipment’s

Safety and Quality inspection during stage-wise construction, commissioning, In-Service

ISO 17842-1: 2015

Safety of Amusement Rides and Amusement devices- Design & manufacture

 

 

ISO 17842-2: 2015

Safety of Amusement rides & Devices- Operation & Use

 

 

ISO 17842-3: 2015

Safety of Amusement rides & Devices- Requirements for Inspection during Design, Manufacture, Operation & Use

 

 

EN 1176-1: 2017

Playground equipment & surfacing- General safety requirements and test methods

 

 

EN 14960-1: 2019

Inflatable play equipment- safety requirements and test methods

 

 

Client Requirements in the form of QAP mentioning required specification and scope mentioned in this scope. However, the applicable National & International Codes and Standards shall be among those which are either referred in the scope statement or shall be equivalent to the standards described above for the relevant scope category

 

 

The following offices of TUV India Pvt. Ltd., Industrial Services Division is/are included under accreditation
S.No Location Address Key activities performed
01 Main office 801, Raheja Plaza, LBS Marg, Ghatkopar(W), Mumbai – 400 086  

Top management functions, quality management system functions, administration & accounts, other key activities as applicable to main office.

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

 Print 
 Close 
Close Search Window