NABCB Accredited Inspection Bodies
Project & Development India Limited
Address A-14, Sector - 1, Noida - 201 301, U.P
Contact Person Mr. M.J.Srivastava
Designation Addl. General Manager(HR-Corporate) and
Project Manager(ERP) & Management Representative
Tel 0120-2539775
Fax 0120-2530751/2529801/891
Email ID srivastavamjs@pdilin.com
Website www.pdilin.com
Accreditation Cert. No.. IB 033
Valid From 03 June 2016
Valid Upto 02 June 2027
Accreditation Standard ISO/IEC 17020:2012
Type of Inspection Body Type C
 
Scopes of Accreditation

Field of Inspection

Type and Range of Inspection

Standards / Regulations / Methods / Procedures

Number identification with year of publication

Title

IAF Scope 17a

Basic metals

 

 

 

Plate

Final Inspection

IS 2062:2021

Hot rolled medium and high structural steel-specification

 

ASME SEC-II:2023

American Society of Mechanical Engineers(ASME) Sec - II(A,B,C & D) 2017 - for Boiler and Pressure Vessel Code

Tubes

Stage-wise/Final Inspection

API 5L:2023

Specification of Line Pipe

 

 

IS 1239:2014

Steel tubes, Tubulars and other Wrought Steel fittings

 

 

IS 3589:2020

Steel pipes for Water and Sewage

Steel Rolled

Product - Angles, Channels, Beams

Final Inspection

IS 2062:2021

Hot rolled medium and high structural steel-specification

Union, Nipple, Fittings, Elbow, TEE

Final Inspection

SA 234:2023

Standard for pipe fittings of Wrought carbon Steel and Alloy Steel for moderate and high temperature

Fasteners

Final Inspection

SA-193/194:2023

Specification for fastener material

Forging and Casting Materials

Stage-wise/Final Inspection

ASME SEC-II:2023

American Society of Mechanical Engineers 2017

Ferrous Metals and Non Ferrous Metals

 

 

Stage-wise/Final Inspection

ASME SEC-II:2023

American Society of Mechanical Engineers(ASME) Sec - II 2017 – Materials

Electrodes

Final Inspection

ASME SEC-II-C 2023

American Society of Mechanical Engineers(ASME) Sec-II(C) 2017 - for Boiler and Pressure Vessel Code

 

 

IS 814:2011

Covered Electrode for Manual metal arc welding

ERW, Seamless, CS, SS  Pipes

Final Inspection

API-5L:2023

Specification of Line Pipe

 

 

IS-1239 :2014

Steel Tubes, Tubular and wrought steel fittings

 

 

IS-3589 :2020

Steel pipes for Water and Sewage

IAF Scope 17b

Fabricated Metal Products

 

 

 

Mechanical Structure

Stage-wise/Final Inspection

ASME SEC-VIII

DIV.1/2:2023

American Society of Mechanical Engineers(ASME) - for Boiler and Pressure Vessel Code

Pressurized and Un- Pressurized Vessels and Tanks

Stage-wise/Final Inspection

ASME SEC-VIII DIV.1/2:2023

American Society of Mechanical Engineers SEC-VIII DIV.01:2017

 

 

IS 2825:1969 (R2017)

Code for Unfired pressure vessels

 

 

BS-1515:2015

Fusion welded Pressure vessel and C-stee

Gas Cylinders

Final Inspection

IS 2825:1969 (R2017)

Code for Unfired pressure vessels

Statutory Testing of Pressure Vessels

 

Stage-wise/Final Inspection

 

Peso standard

as per Client specification

Automatic Ultrasonic Scanning  Reformer Tubes

Final Inspection

ASME BPVC SEC-V: 2023

American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) Section V – Non-destructive Examination

NDT of Ammonia Tanks

Stage-wise/Final Inspection

TEMA, 10th Edition , 2019

Tubular Exchanger Manufacturing Association

 

 

ASME:2023

American Society of Mechanical Engineers

Heat Exchanger

Stage-wise/Final Inspection

IS 2825:1969 (R2017)

Code for Unfired pressure vessels

 

 

BS 1501:1990

Steel for pressure vessels Purpose

 

 

BS 1502:1982

Specification of Steel for fired and unfired pressure vessel

Boilers

Stage-wise/Final Inspection

 

IBR Regulations 1950, IBR Boilers Act, 1923 and Boiler operation engineers rules 2011, boiler attendants rules 2011, chief inspectors rules 2012, boiler appeal rules 2013 other subsequent addendums.

IAF Scope 18

Machinery & Equipment

 

 

 

Compressor

Stage-wise/Final Inspection

IS 10617:2018

Specification for Hermetic Compressor

Safety Valves

Final Inspection

API 527:2014

Specification for seat tightness for pressure releif valves

 

 

 

 

 

Pumps

Stage-wise/Final Inspection

API 675:2014

IS 9079:2018

Positive displacement pumps

Electric Moonset pumps for clear, cold water for Agricultural and water supply purposes

Blowers

Stage-wise/Final Inspection

IS 14220:2018

Open well submersible pump set

Dryers

Stage-wise/Final Inspection

IS 941:2015

Specification of Blower and Exhauster

Control Valve

Final Inspection

IS 11989:2017

Compressed air dryers

 

Witnessing of testing

API 598:2009

Valve Inspection and Testing

 

 

ISA 575-01

Flow equation for sizing control valves

 

 

API 6D, rev24, 2014

Specification for Pipeline Valves (Gate, Plug, Ball, and Check Valves)

 

 

API 607 Ed.07

Fire Test for Soft-Seated Quarter-Turn Valves

 

 

FCI 70-2-1991

Control Valve Seat Leakage

IAF Scope 19a

Electrical Equipment

 

 

 

LV Switchgear and Controlgear

Final Inspection

IS/IEC 60079-1:2012

Electrical apparatus for explosive gas atmosphere

 

 

IS/lEC 60529 : 2014

Degrees of protection provided by enclosures (IP code)

 

 

IS 8623 : 2013

Degree of protection provided by enclosures for low voltage switch gears and control gear

 

 

IS/IEC 60947-1 (2017)

Low-voltage switchgear and Control gear, Part 1: General rules

HV Switchgear and

Control gear

Final Inspection

IS/lEC 60529 : 2001

Degrees of protection provided by enclosures (IP code)

Actuator and its Station

 

IS 11353 : 1985

Marking and arrangement for switchgear bus bars, main connections and auxiliary wiring

Power, Current and Voltage

Final Inspection

IS 9334 (1986)

Electric motor operated actuators

As per Approved QAP and Client Specification

Transformer

Final Inspection

IS 3156 : 2012

Voltage Transformers

 

 

IS 2705 : 2012

Current Transformers

 

 

IS 1180-1, 2 : 1989

Outdoor type three-phase distribution transformers up to and including 100 kVA 11 KV

Power and Control Cables

Final Inspection

IS 694 – 2010

Polyvinyl chloride insulated unsheathed and sheathed cables/cords with rigid and flexible conductor for Rated voltages up to and including 450/750 v

 

Witnessing of testing

IS 1554 PART-I ,II : 2010

PVC insulated electric cables

 

 

IS 7098 : 2011

IEC 332

Cross linked polyethylene PVC sheathed cables

 

 

 

 

 

IS 10810- 1984

Test on electric cable on the fire conditions

Method of test for cables

Motor & Fan-Induction Servo Type

Stage-wise/Final Inspection

IS 325 : 2012

Three Phase Induction Motors

Servo motor operated automatic line voltage correctors

 

 

IS 4029 – 2010

Guide for testing three phase induction motors

 

Variable Frequency Drive

Final Inspection

IS 12802 -1989

Temperature-Rise Measurements of Rotating Electrical Machines

As per Approved QAP and Client Specification

 

DG set, Alternator, Engine

Final Inspection

IS 13364-1

AC generators driven by reciprocating internal combustion engine, Part 1: Rated up to 20 kVA

 

 

IS 13364-2

AC generators driven by reciprocating internal combustion engine, Part 2: Rated above 20 kVA and upto 1250 kVA

Circuit Breakers

Final Inspection

IS 13118 :2007

High-Voltage Alternating-Current Circuit-Breakers 

Lightening Arrestor  & Panel

 

 

 

UPS

Final Inspection

IS 13314: 2008

Solid State Inverters run from storage batteries

 

 

IS 11260:2010

Stabilized Power supplies ac output

 

 

 

Motor Control Circuit Panel

Final Inspection

IS/IEC 60947-1 to 5

Low-Voltage Switchgear and Control gear

Insulators

Final Inspection

IS 731: 2011

Porcelain insulators for overhead power lines with nominal voltage

 

 

IS 2259 : 2010

Method for test for insulation resistance of solid insulating materials

Energy Meter, Ameter, Voltmeter

Stage-wise / Final Inspection

IS 13779: 2009

AC static watt hours meters

 

 

IS 1248 : 2008

Direct acting Indicating Analogue Electrical

Measurement

Cathodic Protection

Final Inspection

IS 8062 : 2007

Code for Practice for Cathodic protection of buried pipeline/Structure for transportation of Natural GAS, OIL and Liquids-Code of Practice(Part I to V)

LUX Measurement

 

IS 6665 : 2005

Code for Practice for Industrial Lighting

IAF Scope 19b

Optical and Precision Equipments

 

 

 

Turbine Meter

Final Inspection

IS/IEC 60079-1:2007

Electrical apparatus for explosive gas atmosphere

 

 

AGA Report 7

American Gas association-Measurement of GAS by Turbine Meter/PD Meter.

 

 

IS/lEC 60529 : 2001

Degrees of protection provided by enclosures (IP CODE)

 

 

API MPMS  Chapter-5, Section -3

Manual of Petroleum
Measurement Standards
Chapter 5 - Metering
Section 3 - Measurement of Liquid
Hydrocarbons by Turbine Meters

PD Meter

Final Inspection

IS 2801:2006

Accuracy requirement for bulk meter used in petroleum trades

 

 

OIML R 117-1

Dynamic measuring systems for liquids other than water Part 1: Metrological and technical requirements

 

 

API MPMS  Chapter-5, Section -3

Manual of Petroleum
Measurement Standards
Chapter 5 - Metering
Section 3 - Measurement of Liquid
Hydrocarbons by Turbine Meters

 

 

AGA Report 7

American Gas association-Measurement of GAS by Turbine Meter/PD Meter

 

 

IEC 61131 PARTS 1-4:2013

Programmable Controllers.

PLC (programmable logic controller)

Final Inspection

IEC 61508:2010

Functional Safety of Electrical/Electronics/Programmable elements

 

 

ISA 5.3:1983

Graphic symbols for distributed controls/shared display instruments

 

 

IEC 61131 PARTS 1-4:2013

Programmable Controllers

DCS (distributed control system)

Final Inspection

IEC 61508:2010

Functional Safety of Electrical/Electronics/Programmable elements

 

 

ISA 5.3:1983

Graphic symbols for distributed controls/shared display instruments

Batch Controller

Final Inspection

OIML R87:2004

Quantity of Product in Pre packages

Fire and Safety System

Final Inspection

NFPA 72:2016

National Fire Alarm and signaling code

Gas Detection System

Final Inspection

IS/IEC 60079-29-1, 2 (2007)

Explosive atmospheres, Part 29:Gas detectors, Section 1: Performance Requirements of Detectors for Flammable Gases

 

 

 

Explosive Atmospheres Part 29 Gas Detectors, Section 2: Selection, Use and Maintenance of Detectors for Flammable Gases and Oxygen Explosive Atmospheres, Part 29: Gas Detectors, Section 2: Selection, Use and Maintenance of Detectors for Flammable Gases and Oxygen
As per Client spec. and Approved QAP

Approved QAP and Client Specification

Access Control System

Final Inspection

OIML R117:2007

Dynamic measuring system for liquids

 

 

OIML R85:2008

Automatic level gauges for measuring the liquid in stationary store tanks

 

 

OISD-RP 108:2013

Recommended Practices on Oil Storage and Handling

Radar Gauge

Final Inspection

IEC 65108:2010/111

Functional Safety of Electrical/Electronic/Programmable Electronic safety related system

 

 

American Petroleum Institute (API) Manual of Petroleum Measurement Standards (MPMS)

Chapter 3, Section 1B Standard Practice for Level Measurement of Liquid Hydrocarbons in Stationary Tanks by Automatic Tank Gauging 
Chapter 3, Section 6 Measurement of Liquid Hydrocarbons by Hybrid Tank Measurement Systems 
Chapter 7 Temperature Determination

Computer, IT Hardware

Final Inspection

 

Approved QAP and Client Specification

LPG, CNG SKID

Final Inspection

 

Approved QAP and Client Specification

Gas Analyser

Final Inspection

 

Approved QAP and Client Specification

Liquid Analyser

Final Inspection

 

Approved QAP and Client Specification

 
The following offices of   Project & Development India Limited are included under accreditation

S.No

Location

Address

Key activities performed


01


Main office


A-14, Sector - 1, Noida - 201 301, U.P


Top management functions, quality management system functions, administration & accounts, other key activities as applicable to main office.

Inspection contract review, Inspection planning & execution, Inspection personnel authorization & assignment, Issue of inspection reports / certificates.

 Print 
 Close 
Close Search Window